Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010.

Slides:



Advertisements
Similar presentations
RHIC electron cloud and vacuum pressure rise characteristics P.He, H.C.Hseuh, W.Fischer, U.Iriso, D.Gassner, J.Gullotta, R.Lee, L.Smart, D.Trbojevic, L.F.Wang.
Advertisements

KEK Update on the status of the electron cloud studies at KEKB Contents Brief review of our studies Updates Clearing electrode Groove structure SEY measurement.
ILCDR/CesrTA meeting Low Emittance Tuning 報告 K.Kubo.
Summary of the two-stream instability session G. Rumolo, R. Cimino Based on input from the presentations of G. Iadarola, H. Bartosik, R. Nagaoka, N. Wang,
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Latest ILC DR wiggler simulations M. Pivi, T. Raubenheimer, L. Wang (SLAC) July, 2005.
RedOffice.com Presentation templates Slide No. 1 RFA Detector Data of Electron Cloud Build-up and Simulations Eric Wilkinson Mentor: Jim Crittenden Cornell.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
49th ICFA Advanced Beam Dynamics Workshop October 8 –12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
SPSU Progress on coatings and grooves M.Taborelli -Progress on C based coatings -Progress on rough coatings -Progress on SEY instrument -Grooves.
By Jeffrey Eldred Data Analysis Workshop March 13th 2013 Intro to Electron Cloud: An experimental summary.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Electron Clouds at SLAC Johnny Ng ILC Damping Rings Collaboration Meeting March 4, 2009.
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Some Initial ECloud Measurements Bob Zwaska September 23, 2009 Electron Cloud Working Group Meeting.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
ILC08 Chicago November 2008 Summary of Recent Results from SLAC M. Pivi, J. Ng, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, F. Cooper,
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Electron cloud in the wigglers of ILC Damping Rings L. Wang SLAC ILC Damping Rings R&D Workshop - ILCDR06 September 26-28, 2006 Cornell University.
4. Summary and outlook 4. Summary and outlook Electron cloud evolution can be modeled using polynomial maps whose coefficients are functions of beam and.
Plans for in-situ coating with a robotic mole at BNL Ady Hershcovitch 1, Michael Blaskiewicz 1, Wolfram Fischer 1, H. Joseph Poole 2, Mark Erickson 2,
2008/7/281 ILCDR08 Report - Electron Cloud Session – Univ. Y. Suetsugu, KEK.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
Compare options: simulations recent history Cloud density near (r=1mm) beam (m -3 ) before bunch passage, values are taken at a cloud equilibrium density.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
ILC GDE - ILCDR08 Cornell 8-11 July 2008 Electron Cloud Mitigation R&D at SLAC M. Pivi, D. Arnett, G. Collet, T. Markiewicz, D. Kharakh, R. Kirby, J. Seeman,
Electron Cloud R&D at SLAC Johnny Ng SLAC DOE HEP Review July 7 – 9, 2008.
AEC’09 Session 1 Motivation, e-cloud Beam Observations & Simulations, Coating Requirements SPS ugrade plan, Elena Shaposhnikova Which SPS parts to be coated?
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
F. Caspers, S. Federmann, E. Mahner, B. Salvant, D. Seebacher 1.
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008) First Intnl. Teleconference Ecloud, Impedance/Instabilities - M. Pivi, SLAC 31 October.
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Recent ECLOUD07 Workshop in Daegu, S. Korea (~50 participants) –Highlights: Measurements of the surface Secondary Electron Yield (SEY) of samples inserted.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
Main Injector/Recycler Ioanis Kourbanis XMAC Review March 18-19, 2013.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Electron Cloud Modeling for the Main Injector Seth A. Veitzer 1 Paul L. G. Lebrun 2, J. Amundson 2, J. R. Cary 1, P. H. Stoltz 1 and P. Spentzouris 2 1.
Electron cloud feedback collaboration meeting Participants: ANL: Kathy Harkay SNS: S. Cousineau, S. Henderson, Jeff Holmes, Y. Sato SLAC: A. Chao LANL:
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Managed by UT-Battelle for the Department of Energy SNS Ring TiN Coating Experience CERN Anti E-Cloud Coating Workshop Oct 12-13, 2009 by M. Plum, Ring.
49th ICFA Advanced Beam Dynamics Workshop. October 8–12, 2010 LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with.
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Shielded Button Measurement/ECLOUD Simulation Comparison for 5
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
CESRTA Measurement of Electron Cloud Density by TE Wave and RFA
Electron Clouds at SLAC
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

Progress and Plans for Main Injector beam Pipe Coatings Dave Capista Linda Valerio Project X Collabration Meeting WG3 MI/Recycler September 8, 2010

Progress and Plans for Main Injector beam Pipe Coatings TiN coatings –Review Brookhaven coating system –SLAC coating system Components coated Materials transferred to Fermilab Coating plans at Fermilab. CERN coating experience (2009 anti e-cloud workshop) –TiN coatings –Amorphous carbon coatings Experiments at Fermilab 2

BNL Coating System 3

4 Overview of system with two Fermilab tubes. Gas introduction flange. Power and cooling connections.

Electron Cloud Experimental Upgrade Major upgrade just finished installation, this summer New experimental Chambers –Identical 1 m SS sections, except that one is coated with TiN 4 RFAs (3 Fermilab & 1 Argonne) 3 microwave antennas and 2 absorbers –Measure ECloud density by phase delay of microwaves Primary Goal: validate TiN as a potential solution for Project X Secondary Goals: –Remeausure threshold and conditioning –Further investigate energy-dependence –Measure energy spectrum of electrons –Test new instrumentation –Directly compare RFA and Microwave –Measure spatial extinction of ECloud TiN Coated Chamber Uncoated Chamber Microwave Antennas Microwave Absorbers Fermilab RFAs Argonne RFA Beam E:CLOUD1 E:CLOUD2 E:CLOUD3 E:CLOUD4

SLAC Coating System Page 6 Overview of coating system. Much simpler the BNL magnetron system. Coating time is much longer than BNL system.

E4R Service Building Coating Tests at FNAL Page 7  Cathode and coated tube has been received at FNAL from SLAC  Ordering parts to reproduce SLAC test.  Hope to be able to coat an elliptical pipe by the end of 2010

Future Plans Need to be collaborate with SLAC to build a cathode that will accommodate the sagitta of the Main Injector dipoles. Coat a Main Injector dipole with TiN. We hope to be able to accomplish this in Develop a plan to coat the Main injector dipoles, quads and straight sections. Estimate manpower and time to coat the machine Make a cost estimate for coating the Main Injector. Page 8

E-cloud at CERN SPS and old Main Ring. Page 9 CERN SPS e-cloud mark.Main Ring e-cloud mark? Main Injector does not show this e-cloud mark. Main Ring operated at 4.5E10 ppb, Main Injector operates at 1E11 ppb. Main Ring and SPS beam tube is SS308, Main Injector is SS316L.

Discussion Points. Cern anti e-cloud workshop. Experience with TiN coatings. Does TiN coating help? - not at all (SNS), a little (CESR-TA), a lot (PEP-II, KEKB) - J-PARC (no data yet), PSR – sometimes TiN helped - relative effect of scrubbing less strong for TiN - differences between e+ and e- at CESR-TA - benefit of TiN depends on bunch spacing & #bunches - SNS 3 years operation, no clear evidence for scrubbing in presence of controlled venting 2 or 3 times per year

Discussion Points. Cern anti e-cloud workshop. Experience with TiN coatings. TE-wave measurements at cyclotron-resonance - handle with care! how reliable are the predictions? o unexpected e-p instability at SNS, at 20% of design intensity with TiN coating, compared with predicted 130% w/o coating o SPS dump kicker with 50-ns bunch spacing? o FNAL MI e-cloud evolution during acceleration o SNS: effect of particles in gap? o SNS: problem with build up or with instability?

Discussion Points. Cern anti e-cloud workshop. Experience with TiN coatings. SEY values after conditioning? re-diffused component, “anti-dips” for TiN mitigation by higher beam intensity “magnetron effect” - CESR-TA experiment? bremsstrahlung off beam protons

Amorphous Carbon (a-C) at CERN Page 13 CERN produced a magnetron sputtering system using a double cathode with graphite side blocks inside of a dipole excited to about 40A. Difficulties with plasma stability, uniformity of coating, and end effects.

CERN a-C tube in Main Injector Page 14 Installed at MI52 in place of the TiN during the 2010 shutdown. Waiting on data and results (next talk?).

Progress and Plans for Main Injector beam Pipe Coatings Thank you for your attention. Page 15