1 MDA Current Approach: Technically Based Opinion Mapped to Cost Growth History Kyle Ratliff December 3, 2002.

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. A PowerPoint Presentation Package to Accompany Applied Statistics.
Advertisements

Kin 304 Regression Linear Regression Least Sum of Squares
1 Overview of Simulation When do we prefer to develop simulation model over an analytic model? When not all the underlying assumptions set for analytic.
Introduction CreditMetrics™ was launched by JP Morgan in 1997.
Kriging.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
CmpE 104 SOFTWARE STATISTICAL TOOLS & METHODS MEASURING & ESTIMATING SOFTWARE SIZE AND RESOURCE & SCHEDULE ESTIMATING.
Materials for Lecture 11 Chapters 3 and 6 Chapter 16 Section 4.0 and 5.0 Lecture 11 Pseudo Random LHC.xls Lecture 11 Validation Tests.xls Next 4 slides.
SCEA June 2000 JRS, TASC, 5/7/2015, 1 BMDO Cost Risk Improvement in Operations and Support (O&S) Estimates J. R. Summerville,
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
1 COCOMO II Integrated with Crystal Ball ® Risk Analysis Software Clate Stansbury MCR, LLC (703) Prepared for 19 th International.
Statistical Methods Chichang Jou Tamkang University.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Lecture 23 Multiple Regression (Sections )
RLC, TASC, 8/8/2015, 1 (703) x2181 Risk In Cost Estimating General Introduction & The BMDO Approach 33 rd ADoDCAS 2-4 February.
Modern Navigation Thomas Herring
Project Management and Scheduling
Hydrologic Statistics
Developed by© 2002 SCEA. All rights reserved. CostPROF Unit III - Module 91 Cost Risk Analysis How to adjust your estimate for historical cost growth.
Alternative Measures of Risk. The Optimal Risk Measure Desirable Properties for Risk Measure A risk measure maps the whole distribution of one dollar.
1 Least squares procedure Inference for least squares lines Simple Linear Regression.
Inferences for Regression
1 CSI5388: Functional Elements of Statistics for Machine Learning Part I.
Application of Monte Carlo Methods for Process Modeling
Why Is It There? Getting Started with Geographic Information Systems Chapter 6.
CORRELATION AND FUNCTIONAL DEPENDENCY 28th Annual DoD Cost Analysis Symposium Leesburg, VA22 September 1994 An Overview of Correlation and Functional Dependencies.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Forecasting © The McGraw-Hill Companies, Inc., 2003 chapter 9.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Delivering Integrated, Sustainable, Water Resources Solutions Monte Carlo Simulation Robert C. Patev North Atlantic Division – Regional Technical Specialist.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
Ch 6-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Formulating a Simulation Project Proposal Chapter3.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Propagation of Error Ch En 475 Unit Operations. Quantifying variables (i.e. answering a question with a number) 1. Directly measure the variable. - referred.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Analysis and Implementation of Cost Estimating Risk in the Ballistic Missile Defense Organization (BMDO) Risk Model A Study of Distribution Presented to.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
SOFTWARE PROJECT MANAGEMENT
Simulation is the process of studying the behavior of a real system by using a model that replicates the system under different scenarios. A simulation.
5 - 1 The Cost Modeling Process Chapter Introduction What makes a good cost model? – Good Statistics – Quality Data – Relevant Data – Analogous.
Analogy Technique Chapter Analogy - Method Comparative analysis of similar systems Adjust costs of an analogous system to estimate the.
Advanced Statistical Methods: Continuous Variables REVIEW Dr. Irina Tomescu-Dubrow.
Regression Analysis1. 2 INTRODUCTION TO EMPIRICAL MODELS LEAST SQUARES ESTIMATION OF THE PARAMETERS PROPERTIES OF THE LEAST SQUARES ESTIMATORS AND ESTIMATION.
Chapter 6 Becoming Acquainted With Statistical Concepts.
Building Valid, Credible & Appropriately Detailed Simulation Models
Central Bank of Egypt Basic statistics. Central Bank of Egypt 2 Index I.Measures of Central Tendency II.Measures of variability of distribution III.Covariance.
1 James R. Black Qing Qing Wu 17 Feb 2016 Modeling Prediction Intervals using Monte Carlo Simulation Software 2016 ICEAA Professional Development & Training.
Chapter 13 Simple Linear Regression
Becoming Acquainted With Statistical Concepts
6. Risk Analysis for the New Venture Using Monte Carlo Simulation
MATH-138 Elementary Statistics
Prepared by Lloyd R. Jaisingh
Review 1. Describing variables.
Multiple Imputation using SOLAS for Missing Data Analysis
Inferences for Regression
Handout on Statistics Summary for Financial Analysis: Random Variables, Probability and Probability Distributions, Measures of Central Tendency, Dispersion,
Materials for Lecture 18 Chapters 3 and 6
An Overview of Correlation and Functional Dependencies in Cost Risk and Uncertainty Analysis Richard L. Coleman 22 September 1994 Paper submitted.
BPK 304W Correlation.
Essential Statistics (a.k.a: The statistical bare minimum I should take along from STAT 101)
CPM, PERT & Schedule Risk Analysis in Construction
Statistics Review ChE 477 Winter 2018 Dr. Harding.
Basic Statistical Terms
IENG 451 / 452 Data Collection: Data Types, Collection Protocols
Inferences for Regression
Fall Final Topics by “Notecard”.
Advanced Algebra Unit 1 Vocabulary
3 basic analytical tasks in bivariate (or multivariate) analyses:
Monte Carlo simulation
Presentation transcript:

1 MDA Current Approach: Technically Based Opinion Mapped to Cost Growth History Kyle Ratliff December 3, 2002

2 History Schedule/Technical (S/T) Risk mapping study performed 1994 Cost Estimating (CE) Risk mapping performed 1998 Methodology used by MDA since 1989 –Variants of same methodology are used by AFCAA, NAVAIR, Intel Community, and others

3 Definitions (MDA) Cost Risk = Cost Estimating Risk + Schedule/Technical Risk + Requirements Risk + Threat Risk –Cost Estimating Risk: Risk due to cost estimating errors, and the statistical uncertainty in the estimate –Schedule/Technical Risk: Risk due to difficulty or inability to conquer problems posed by the intended design –Requirements Risk: Risk due to an as-yet-unseen design shift Due to the inability of the intended design to perform the (unchanged) intended mission The solution was inadequate –Threat Risk: Risk due to as-yet-unrevealed threat shift We didn’t understand the problem

4 MDA Cost Risk Assessment Approach Determine a mean and standard deviation for a normally distributed cost estimating risk distribution for each WBS element Determine a mean, high, and low endpoint for a symmetrical triangular schedule/technical risk distribution for each WBS element Combine these risk distributions and the point estimate using a Monte Carlo simulation –Produces an expected outcome, including risk, for each WBS element for each phase of the cost estimate

5 Risk Categories As Estimated in the MDA Model Cost Estimating Risk Sked Tech RiskRequirements RiskThreat Risk "Other" Risk Total Cost Risk Scored Not Scored Our cost growth factors include all historic growth, Schedule/Technical score serves as a proxy for all other risk besides CE Our cost growth factors include all historic growth, Schedule/Technical score serves as a proxy for all other risk besides CE

6 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD Cost Analysis Requirements Document CARD Cost Analysis Requirements Document IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

7 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

8 Schedule/Technical Risk Assessment The first step is risk scoring –Every WBS element that isn’t a roll up will derive S/T Risk one of two ways independently through risk scoring using a scoring matrix and mapping equation dependently through correlation with another element Next we will discuss risk scoring using the scoring matrices

9 S/T Risk Scoring Find qualified scorers and train them –Provide them scoring matrices with specific WBS elements identified for them to score –Currently three different matrices: Hardware Software Integration Assembly and Test (IA&T) –Each matrix is broken down into categories designed to reflect the risk drivers for the element in question Technical experts score each of the matrix categories from 0 (no risk) to 10 (high risk) Each category can be weighted depending on the relevancy of the category

10 Hardware Risk Scoring Matrix

11 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD - Cost Analysis Requirements Document IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

12 Mapping Risk Scores Once we have risk scores we must translate them into cost growth We achieve this through a set of mapping equations The dependent variable in these equations is the mean of the symmetrical triangular S/T distribution The low and high endpoints are derived from the variance of the regression MINMEANMAX

13 The Mapping Study Used SARs to generate historical cost growth factors (CGF) Performed Schedule / Technical scoring on the selected programs Ran regressions with CGFs as the dependent variable and risk scores as the independent variable Resulting mapping equations used to assess cost growth on current programs

14 The Mapping Equation The Mapping Study produced separate equations for both RDT&E and Procurement For RDT&E: CGF = x For Procurement: CGF = x X = Risk Score

15 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

16 Cost Estimating Risk Assessment Cost Estimating Risk is based on two variables –The standard error underlying the costing methodology –The analyst’s confidence in that methodology Analyst makes a confidence assessment of the methodology for each WBS item –Score of 1 to 5 is assigned, 1 being most confident and 5 being least confident –Score is based on the currency and relevancy of the database on which the CERs, analogies, factors, etc. rely

17 Cost Estimating Risk Production Symmetric w/mean shifted to Symmetric w/mean shifted to RDT&E Symmetric w/mean shifted to Symmetric w/mean shifted to 1.087

18 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

19 Correlation of Elements Correlation is a crucial step in any Monte Carlo simulation –Is necessary to produce the correct variance –Effectively links the randomly drawn numbers between multiple distributions so that when one is high, so is another, and vice-versa MDA models correlation in three ways: –Functional Correlation –Phase to Phase Functional Correlation –Historical Correlation

20 The MDA Cost Risk Process Set Up Correlation Standard Error & Mapping Equation Mapping Equation Risk Scoring Monte Carlo Simulation Risk Report CARD IPE Initial Point Estimate IPE Initial Point Estimate Cost Estimating Risk Sked/Tech Risk

21 The Monte Carlo Technique Set up a CE and S/T distribution for each WBS item Set up correlation by linking random draws of correlated elements A random draw is made from each of these distributions –Cost for each WBS element as well as summary levels are recorded –Process is repeated thousands of times to determine range, center, and shape of the resulting cost probability distribution We use Monte Carlo because the math of combining all the probability distributions using method of moments becomes quite complex

22 Example Cost Estimate with Risk – R&D Initial Point Estimate Add Cost Estimating Risk Add Sched/Tech Risk S/T Risk CE Risk Init Pt Est $ 8.7% 25% 33.7%

23 Risk Report Sample Output Statistics:Value Trials5000 Mean Median Mode--- Standard Deviation43.32 Variance Skewness0.01 Kurtosis2.88 Coeff. of Variability0.25 Range Minimum22.38 Range Maximum Range Width Mean Std. Error0.61 Forecast: MDA Sample Output Crystal Ball Report Simulation stopped on 1/3/01 at 18:24:47 Simulation started on 1/3/01 at 18:24:18

24 Strong Points Historical Basis Intuitive / Logical –S/T Matrices –Produces believable results that are reasonable in relation to historic programs Provides Structure –Can create a cost risk model within a reasonable effort –Provides consistency between programs, if all programs use it Produces output that depicts the range, center, and shape of the resulting cost probability distribution

25 Weaknesses Original data is from 1991 and prior Used only SAR data –Doesn’t separate govt. & contractor growth –Doesn’t give detail breakout of components –CCDR data gives more detail Max cost growth is limited by linear relationship Uses forced intercept (0) –S/T of 0 = 0% cost growth –Will never predict cost savings even though this occurs in the historic data with a reasonable frequency

26 Mechanics Report on Current MDA Approach Decide on and collect current data –SAR, CCDR, etc. Decide on scoring matrices –SW, HW, IA&T, other ? –Score RDTE and Production separately? –Determine level to score historic and current programs –Determine points in acquisition cycle to score at Score relevant projects Develop new mapping equations Update risk methodology to reflect new mapping equations Jump on opportunities to facilitate cost model integration

27 The Road Ahead (If We Consider New Methodologies) Alternative methodologies –Technically based opinion mapped to cost growth history –Cost based opinion –Probability and consequence –Inputs-based risk Residual Characterization –Schedule analysis - detailed network (PERT) Perform test to see if techniques adequately bound the risk for MDA Programs Decide on best methodology –Develop methodology –Implement methodology

28 Backup