December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 Texas Nodal Observability Status ROS Feedback Thursday, February 14, 2008.
Advertisements

Market Solution 1 Definitions Market Solution A Market Solution exists when at least three unaffiliated Resources, with capacity available, submit bids.
PRR 692 APPEAL PRESENTED BY: Constellation NewEnergy DATE: November 2, 2006.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Market Based Solutions for Demand Response Providers Today and the Future Alice Jackson Occidental Energy Ventures Corp.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Testing Aug 14, 2007.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
14 Minute Ramp Period Testing Workshop June 30, 2009.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
© Property of ERCOT EMMS Improvements Operations Review Group 11/17/04.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
1 TAC Report to the ERCOT Board November 14, 2006.
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
1 Market Trials Update NATF January 5, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates June 06, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
TAC Report to the ERCOT Board
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Market Notice Regarding Off-line Units
Paul Wattles, Sai Moorty ERCOT Market Design & Development
The New Texas Wholesale/Retail Market
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Presentation transcript:

December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS

PUCT DR WorkshopDecember 8, 2006 Background: In early 2006 ERCOT identified three problems within our network model related to LaaR modeling which were impacting the RPRS process and resulting in incorrect solutions. In an effort not to delay the migration of the RPRS code into production ERCOT elected to temporarily disable LaaRs from participating in RPRS until these problems were solved.

PUCT DR WorkshopDecember 8, 2006 Status: ERCOT believes that a change to model LaaRs as negative generation will correct these problems. A patch (modified code) is expected to be migrated into the test environment in early December. If all test results return positive ERCOT plans to migrate patch into production during the January update.

PUCT DR WorkshopDecember 8, 2006 LaaRs are only considered in Step 2 of the RPRS process (zonal congestion & system balance) Online, available, but not active in the Resource Plan RPRS Bid required Eligible LaaR’s Max Capacity will be set to the lesser of RPRS Bid Capacity or the difference in the Resource Plan Max and Min Things a QSE should know/prepare for to Participate in RPRS

PUCT DR WorkshopDecember 8, 2006 QSE can submit RPRS bids by: 1.Access through the Texas Market Link (TML) 2.XML Submission Things a QSE should know/pre ….

PUCT DR WorkshopDecember 8, 2006 Day – The Operating day for which the bid is submitted FIRSTHOUR – The first hour the bid is active LASTHOUR – The last hour the bid is active CAPACITY – The capacity in MW for the RPRS bid RSRC_ID – ID of Resource RSRC_TY – Type of Resource (GEN, UFR, CLD) CMZONE – Zone where the Resource is located STARTUP_PRICE – Capacity Price per MW PERHOUR_PRICE – Operational Price per MW EXPERATION_DATE – Date which bid expires EXPERATION_TIME – Time which bid expires BES_BIDPOINT – Procured RPRS MW will be bid at or under this price What makes up an RPRS Bid?

PUCT DR WorkshopDecember 8, 2006 Things a QSE should know/pre …. Deployment Electronically Transmitted via XML Hours of Capacity Dispatch included What does a QSE do when RPRS is procured from the QSE? Receive and XML Message Update Resource Plan Accordingly Add entire capacity of RPRS Resource into Up Balancing Energy Bid Stack Ensure Resource Ready for dispatch for specific hours