Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version 0.9.2.

Slides:



Advertisements
Similar presentations
IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Advertisements

Exercise 7.5 (p. 343) Consider the hotel occupancy data in Table 6.4 of Chapter 6 (p. 297)
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
On the Influence of Weather Forecast Errors in Short-Term Load Forecasting Models Damien Fay, John V. Ringwood IEEE POWER SYSTEMS, 2010.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Short Term Load Forecasting with Expert Fuzzy-Logic System
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Load Distribution Factor Calculation Update for Market Applications and studies a Presentation for NATF 11/2/ NATF1Texas Nodal.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
ERCOT Public 1 Multi-Interval Real-Time Market Plan for Proposed Study Process.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
UFE 2008 Analysis 1 UFE 2008 ANALYSIS Compiled by Load Profiling Energy Analysis & Aggregation.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
2016 Long-Term Load Forecast
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
Developing Load Reduction Estimates Caused by Interrupting and/or Curtailing Large Customers By Carl L. Raish 2000 AEIC Load Research Conference.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
SAWG Update to WMS March 4 th, 2015 Brandon Whittle.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Generation to be Dispatched(GTBD) Analysis For the purpose of discussion only PDCWG/QMWG Joint Meeting 11/02/2012.
Multi-Interval Real-Time Market (MIRTM) Update to SAWG – WebEx ERCOT Staff Market Design & Analysis September 21, 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Principal Load Profiling and Modeling
RTDF Overview of Data Analysis & Status of “Consesus Items”
Presentation transcript:

Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version 0.9.2

2 Table of Contents Introduction Improving Demand Estimation Performance of All Intervals Performance of Intervals where System Lambda >= $75/MWh Performance on Specific Days Improving Wind HSL Estimation Performance of All Intervals Performance of Intervals where System Lambda >= $75/MWh Performance on Specific Days MAE of All Methodologies Next Steps

Public | Market Analysis Table of ContentsTable of Contents | 3 Introduction 1. Improving Demand Estimation Short-Term Load Forecast (STLF) Generation-To-Be-Dispatched (GTBD) Calculation Methodology 2. Improving Wind HSL Estimation Indicative Pricing Tool currently uses a heuristically determined linear equation to estimate wind HSL Currently, proposal is for MIRTM to use persistence (HSL telemetry only) to forecast wind HSL Improvements to linear regression was devised to show potential improvement in short-term wind HSL estimation

Public | Market Analysis Table of ContentsTable of Contents | 4 Improving Demand Estimation

Public | Market Analysis Table of ContentsTable of Contents | 5 Short Term Load Forecast (STLF) Both STLFs use weather and calendar variables as basic inputs. Current STLF (Legacy system in the EMMS) Based on regression similar day model using lagged load values as well as lagged load from 24 hours ago of a similar day New STLF (Blended Model) First 15 minutes is based on a regression model using lagged load values (forecast of total MW for a weather zone) Next 45+ minutes is based on a regression model of ramp rates (forecast of total MW change from last actual value) See May 2015 SAWG meeting page for previous presentation:

Public | Market Analysis Table of ContentsTable of Contents | 6 Improving Demand Estimation

Public | Market Analysis Table of ContentsTable of Contents | 7 Improving Demand Estimation Both the current STLF and new STLF are used in the analysis along with the modified methodology for four combinations: 1.MIRTM GTBD with current STLF 2.MIRTM GTBD with new STLF 3.MIRTM GTBD Modified with current STLF 4.MIRTM GTBD Modified with new STLF The calculated MIRTM GTBD errors are benchmarked using Estimated – Reference where Reference is: First interval (i=1): Actual SCED GTBD Intervals 2 – 6 (i=2…6): Sum of generator output at end of SCED interval

Public | Market Analysis Table of ContentsTable of Contents | 8 MIRTM Demand Estimation Performance July 1, 2015 – December 31, 2015 All Intervals

Public | Market Analysis Table of ContentsTable of Contents | 9 MAE of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 10 MAE of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 11 Standard Deviation of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 12 Standard Deviation of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 13 Mean of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 14 Mean of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 15 MIRTM GTBD Error by Reference (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 16 MIRTM GTBD Error by Reference (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 17 MIRTM GTBD Error by Reference (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 18 MIRTM GTBD Error by Reference (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 19 MIRTM GTBD Error by Reference (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 20 MIRTM GTBD Error by Reference (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 21 MIRTM GTBD Error by Delivery Time (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 22 MIRTM GTBD Error by Delivery Time (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 23 MIRTM GTBD Error by Delivery Time (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 24 MIRTM GTBD Error by Delivery Time (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 25 MIRTM GTBD Error by Delivery Time (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 26 MIRTM GTBD Error by Delivery Time (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 27 MIRTM Demand Estimation Performance July 1, 2015 – December 31, Intervals when System Lambda >= $75/MWh

Public | Market Analysis Table of ContentsTable of Contents | 28 MAE of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 29 MAE of Estimated GTBD vs. Reference For intervals 4-6, we are investigating why the current STLF performs better than the new STLF for the high price intervals using the modified methodology.

Public | Market Analysis Table of ContentsTable of Contents | 30 Standard Deviation of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 31 Standard Deviation of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 32 Mean of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 33 Mean of Estimated GTBD vs. Reference

Public | Market Analysis Table of ContentsTable of Contents | 34 MIRTM GTBD Error by Reference (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 35 MIRTM GTBD Error by Reference (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 36 MIRTM GTBD Error by Reference (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 37 MIRTM GTBD Error by Reference (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 38 MIRTM GTBD Error by Reference (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 39 MIRTM GTBD Error by Reference (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 40 MIRTM GTBD Error by Reference (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 41 MIRTM GTBD Error by Delivery Time (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 42 MIRTM GTBD Error by Delivery Time (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 43 MIRTM GTBD Error by Delivery Time (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 44 MIRTM GTBD Error by Delivery Time (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 45 MIRTM GTBD Error by Delivery Time (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 46 MIRTM GTBD Error by Delivery Time (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 47 MIRTM Demand Estimation Performance on Specific Days In the following slides, the estimation performance of the following specific days are analyzed: August 13, 2015 October 23, 2015 November 11, 2015 November 27, 2015 For each of these four dates, the two highest priced SCED intervals are further examined. The LDL-HDL energy offer curve is shown along with the effects that the New STLF and Modified GTBD Methodology have on the resulting price based the curve. This is not the actual LDL-HDL curve MIRTM would use for each interval (i). It is the LDL-HDL curve at the SCED snapshot (i =1) simply to give a representation of how sensitive the energy offer curve is to differing GTBD values.

Public | Market Analysis Table of ContentsTable of Contents | 48 MIRTM Demand Estimation Performance August 13, 2015

Public | Market Analysis Table of ContentsTable of Contents | 49 MIRTM GTBD Error on August 13, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 50 MIRTM GTBD Error on August 13, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 51 MIRTM GTBD Error on August 13, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 52 MIRTM GTBD Error on August 13, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 53 MIRTM GTBD Error on August 13, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 54 MIRTM GTBD Error on August 13, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 55 LDL to HDL Energy Offer Curve from August 13, :05 SCED Run At SCED Snapshot: 1.3 * 95 = MW Load Ramp Component 0.5 * 156 = 78 MW Regulation Up Component Recall that SCED GTBD = = Sum of Generator Output (at snapshot) + K3 * Predicted Load Ramp + K4 * Regulation Deployed At 15:10: -22 MW Regulation Down Deployed

Public | Market Analysis Table of ContentsTable of Contents | 56 LDL to HDL Energy Offer Curve on August 13, :55 SCED Run At SCED Snapshot: 1.3 * 17 = 22.1 MW Load Ramp Component 0.5 * 211 = MW Regulation Up Component At 16:00: 56 MW Regulation Up Deployed

Public | Market Analysis Table of ContentsTable of Contents | 57 MIRTM Demand Estimation Performance October 23, 2015

Public | Market Analysis Table of ContentsTable of Contents | 58 MIRTM GTBD Error on October 23, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 59 MIRTM GTBD Error on October 23, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 60 MIRTM GTBD Error on October 23, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 61 MIRTM GTBD Error on October 23, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 62 MIRTM GTBD Error on October 23, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 63 MIRTM GTBD Error on October 23, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 64 LDL to HDL Energy Offer Curve on October 23, :10 SCED Run At SCED Snapshot: 1.2 * 409 = MW Load Ramp Component 0.4 * 660 = 264 MW Regulation Up Component At 06:15: 208 MW Regulation Up Deployed

Public | Market Analysis Table of ContentsTable of Contents | 65 LDL to HDL Energy Offer Curve on October 23, :35 SCED Run At SCED Snapshot: 1.2 * 308 = MW Load Ramp Component 0.4 * 173 = 69.2 MW Regulation Up Component At 06:40: -70 MW Regulation Down Deployed

Public | Market Analysis Table of ContentsTable of Contents | 66 MIRTM Demand Estimation Performance November 11, 2015

Public | Market Analysis Table of ContentsTable of Contents | 67 MIRTM GTBD Error on November 11, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 68 MIRTM GTBD Error on November 11, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 69 MIRTM GTBD Error on November 11, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 70 MIRTM GTBD Error on November 11, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 71 MIRTM GTBD Error on November 11, 2015

Public | Market Analysis Table of ContentsTable of Contents | 72 MIRTM GTBD Error on November 11, 2015

Public | Market Analysis Table of ContentsTable of Contents | 73 LDL to HDL Energy Offer Curve on November 11, :25 SCED Run At SCED Snapshot: 1.2 * 321 = MW Load Ramp Component 0.3 * 255 = 76.5 MW Regulation Up Component At 17:30: -88 MW Regulation Down Deployed

Public | Market Analysis Table of ContentsTable of Contents | 74 LDL to HDL Energy Offer Curve on November 11, :35 SCED Run At SCED Snapshot: 1.2 * 297 = MW Load Ramp Component 0.3 * -26 = -7.8 MW Regulation Down Component At 17:40: 0 MW Regulation Deployed

Public | Market Analysis Table of ContentsTable of Contents | 75 MIRTM Demand Estimation Performance November 27, 2015

Public | Market Analysis Table of ContentsTable of Contents | 76 MIRTM GTBD Error on November 27, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 77 MIRTM GTBD Error on November 27, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 78 MIRTM GTBD Error on November 27, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 79 MIRTM GTBD Error on November 27, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 80 MIRTM GTBD Error on November 27, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 81 MIRTM GTBD Error on November 27, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 82 LDL to HDL Energy Offer Curve on November 27, :55 SCED Run At SCED Snapshot: 1.2 * 77 = 92.4 MW Load Ramp Component 0.3 * 136 = 40.8 MW Regulation Up Component At 17:00: -129 MW Regulation Down Deployed

Public | Market Analysis Table of ContentsTable of Contents | 83 LDL to HDL Energy Offer Curve on November 27, :40 SCED Run At SCED Snapshot: 0.3 * -19 = -5.7 MW Regulation Down Component 1.2 * 63 = 75.6 MW Load Ramp Component At 17:45: -85 MW Regulation Down Deployed

Public | Market Analysis Table of ContentsTable of Contents | 84 Improving Wind HSL Estimation

Public | Market Analysis Table of ContentsTable of Contents | 85 Improving Wind HSL Estimation in MIRTM

Public | Market Analysis Table of ContentsTable of Contents | 86 Wind Estimation Performance January 1, 2015 – December 31, 2015 All Intervals

Public | Market Analysis Table of ContentsTable of Contents | 87 MAE of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 88 MAE of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 89 Standard Deviation of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 90 Standard Deviation of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 91 Mean of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 92 Mean of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 93 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 94 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 95 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 96 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 97 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 98 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 99 MIRTM Wind HSL Error by Delivery Time (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 100 MIRTM Wind HSL Error by Delivery Time (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 101 MIRTM Wind HSL Error by Delivery Time (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 102 MIRTM Wind HSL Error by Delivery Time (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 103 MIRTM Wind HSL Error by Delivery Time (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 104 MIRTM Wind HSL Error by Delivery Time (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 105 MIRTM Wind HSL Estimation Performance January 1, 2015 – December 31, Intervals when System Lambda >= $75/MWh

Public | Market Analysis Table of ContentsTable of Contents | 106 MAE of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 107 MAE of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 108 Standard Deviation of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 109 Standard Deviation of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 110 Mean of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 111 Mean of Estimated Wind HSL vs. Actual Wind HSL

Public | Market Analysis Table of ContentsTable of Contents | 112 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 113 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 114 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 115 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 116 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 117 MIRTM Wind HSL Error by Actual Wind HSL (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 118 MIRTM Wind HSL Error by Delivery Time (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 119 MIRTM Wind HSL Error by Delivery Time (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 120 MIRTM Wind HSL Error by Delivery Time (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 121 MIRTM Wind HSL Error by Delivery Time (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 122 MIRTM Wind HSL Error by Delivery Time (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 123 MIRTM Wind HSL Error by Delivery Time (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 124 MIRTM Wind HSL Estimation Performance on Specific Days In the following slides, the estimation performance of the following specific days are analyzed: August 13, 2015 October 23, 2015 November 11, 2015 November 27, 2015

Public | Market Analysis Table of ContentsTable of Contents | 125 MIRTM Wind HSL Estimation Performance August 13, 2015

Public | Market Analysis Table of ContentsTable of Contents | 126 MIRTM Wind HSL on August 13, 2015

Public | Market Analysis Table of ContentsTable of Contents | 127 MIRTM Wind HSL Error on August 13, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 128 MIRTM Wind HSL Error on August 13, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 129 MIRTM Wind HSL Error on August 13, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 130 MIRTM Wind HSL Error on August 13, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 131 MIRTM Wind HSL Error on August 13, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 132 MIRTM Wind HSL Error on August 13, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 133 MIRTM Wind HSL Estimation Performance October 23, 2015

Public | Market Analysis Table of ContentsTable of Contents | 134 MIRTM Wind HSL on October 23, 2015

Public | Market Analysis Table of ContentsTable of Contents | 135 MIRTM Wind HSL Error on October 23, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 136 MIRTM Wind HSL Error on October 23, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 137 MIRTM Wind HSL Error on October 23, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 138 MIRTM Wind HSL Error on October 23, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 139 MIRTM Wind HSL Error on October 23, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 140 MIRTM Wind HSL Error on October 23, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 141 MIRTM Wind HSL Estimation Performance November 11, 2015

Public | Market Analysis Table of ContentsTable of Contents | 142 MIRTM Wind HSL on November 11, 2015

Public | Market Analysis Table of ContentsTable of Contents | 143 MIRTM Wind HSL Error on November 11, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 144 MIRTM Wind HSL Error on November 11, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 145 MIRTM Wind HSL Error on November 11, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 146 MIRTM Wind HSL Error on November 11, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 147 MIRTM Wind HSL Error on November 11, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 148 MIRTM Wind HSL Error on November 11, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 149 MIRTM Wind HSL Estimation Performance November 27, 2015

Public | Market Analysis Table of ContentsTable of Contents | 150 MIRTM Wind HSL on November 27, 2015

Public | Market Analysis Table of ContentsTable of Contents | 151 MIRTM Wind HSL Error on November 27, 2015 (Interval = 6)

Public | Market Analysis Table of ContentsTable of Contents | 152 MIRTM Wind HSL Error on November 27, 2015 (Interval = 5)

Public | Market Analysis Table of ContentsTable of Contents | 153 MIRTM Wind HSL Error on November 27, 2015 (Interval = 4)

Public | Market Analysis Table of ContentsTable of Contents | 154 MIRTM Wind HSL Error on November 27, 2015 (Interval = 3)

Public | Market Analysis Table of ContentsTable of Contents | 155 MIRTM Wind HSL Error on November 27, 2015 (Interval = 2)

Public | Market Analysis Table of ContentsTable of Contents | 156 MIRTM Wind HSL Error on November 27, 2015 (Interval = 1)

Public | Market Analysis Table of ContentsTable of Contents | 157 MAE of All Methodologies

Public | Market Analysis Table of ContentsTable of Contents | 158 Next Steps for Forecast data input to MIRTM Continue maintaining metrics on MIRTM GTBD, Wind HSL forecasting and report to SAWG Request feedback on methodology and suggest improvements For studies use: MIRTM GTBD Modified with new STLF ARIMA regression coefficients for Wind HSL estimation Please provide feedback on other ways to present or analyze the data

Public | Market Analysis Table of ContentsTable of Contents | 159 Questions?