Disaster Recovery Management By: Chris Rozic COSC 481.

Slides:



Advertisements
Similar presentations
Program Management Office (PMO) Design
Advertisements

Alignment of COBIT to Botswana IT Audit Methodology
Business Continuity and Disaster Recovery Planning.
1 The process of analyzing all core business functions and establishing an optimized timetable for recovery. Provides baseline for:  Justification for.
BY KIRTLAND STOUT AND JANIE XIONG AUXILIARY EDITION Continuity Planning Made Easy.
1 Disaster Recovery “Protecting City Data” Ron Bergman First Deputy Commissioner Gregory Neuhaus Assistant Commissioner THE CITY OF NEW YORK.
Copyright 2004 Turning Point Solutions Establishing Lines Of Communication Before a Crisis.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
IT Strategic Planning Project – Hamilton Campus FY2005.
Change is a Process Organizational Stages Individual Stages (ADKAR) Business Need Concept and Design Implementation Post-Implementation Awareness Desire.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
ECM Project Roles and Responsibilities
Ohio Improvement Process (OIP) Facilitating District-wide Improvement in Instructional Practices and Student Performance.
CHAPTER 9 DEVELOPING BUSINESS/IT STRATEGIES. IT Planning Planning an information system doesn’t start with bits, and bytes, or a Web site. It starts with.
Guide to Disaster Recovery
Network security policy: best practices
UNITED NATIONS OFFICE FOR THE COORDINATION OF HUMANITARIAN AFFAIRS (OCHA) - Preparedness - Increase effectiveness of Disaster Response NATF/ACAPS Training.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
November 2009 Network Disaster Recovery October 2014.
Discovery Planning steps (1)
Implementing and Auditing Ethics Programs
Disaster Recovery Strategies & criteria for evaluation of information management strategies.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
ISA 562 Internet Security Theory & Practice
NIST Special Publication Revision 1
David N. Wozei Systems Administrator, IT Auditor.
© 2013 Cengage Learning. All Rights Reserved. 1 Part Four: Implementing Business Ethics in a Global Economy Chapter 9: Managing and Controlling Ethics.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Implementing and Auditing Ethics Programs
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1. 2 Cost to Recover Time to Recover Last Backup Work Backlog Created Lost Data Recovery Operations Time Cost Disaster Recovery Time Frame Reconstruct.
Business Continuity and Disaster Recovery Planning.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
Disaster Recovery - Techniques and Topologies Connie Murphy Abstract Introduction RAID Systems Performance Indicators Resiliency/ Backup Services Vendor.
Developing Plans and Procedures
DRP World Class Operations - Impact Workshop Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Drought Mitigation and Response Advisory Council Elements of a Drought Response Plan May 29, 2008.
Phases of BCP The BCP process can be divided into the following life cycle phases: Creation of a business continuity and disaster recovery policy. Business.
1 Ch. 4 Outline Introduction to Planning 1.Planning Fundamentals 2.Levels of Planning 3.Strategic Planning.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
9 juni 2009 Alex van Os de Man BCI Forum 2009 Business Impact Analysis Process.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
DRP Disaster Recovery Planning. Social Networking... It's the way the 21st century communicates today.
Disaster Recovery Planning Barry Navarre Charter Business.
Disaster Recovery Planning (DRP) DRP: The definition of business processes, their infrastructure supports and tolerances to interruptions, and formulation.
AUDITING BUSINESS CONTINUITY PROGRAMS AND PLANS What to Look For Presented by: Tommye White, CBCP, DRP Chuck Walts, CBCP, CRP.
Business Continuity Planning 101
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Service Design.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)
Unit 2: Recovery Pre-Disaster Planning Guidance for Local Governments
Audit Planning Presentation - Disaster Recovery Plan
BUSINESS CONTINUITY PLAN
Developing and testing the Plan
Manage Business Continuity Introductory Brief
BUSINESS CONTINUITY PROGRAM
MANUFACTURING DISASTER RECOVERY PLAN
PAYROLL DISASTER RECOVERY PLAN
DISASTER RECOVERY RUNBOOK
Disaster Recovery Planning Process
DATA DISASTER RECOVERY PLAN
APPLICATION DISASTER RECOVERY RESPONSE
IT DISASTER RECOVERY PLAN
BUSINESS CONTINUITY PLAN
Presentation transcript:

Disaster Recovery Management By: Chris Rozic COSC 481

Direction Differences between business continuity plan and a disaster recovery plan Differences between business continuity plan and a disaster recovery plan Two parts to properly manage a disaster recovery plan Two parts to properly manage a disaster recovery plan Pre-Planning tasks Pre-Planning tasks Four parts of preparation Four parts of preparation Actual process of Disaster Recovery Plan Actual process of Disaster Recovery Plan Six key parts to the creation of the plan Six key parts to the creation of the plan

Differences Business Continuity Plan Business Continuity Plan Proactive response Proactive response Nature of the business continuity Nature of the business continuity Services of primary concern Services of primary concern Disaster Recovery Plan Disaster Recovery Plan Reactive response Reactive response recovery steps needed recovery steps needed Services of primary concern Services of primary concern

Differences continued

Pre-Planning Tasks Examine the critical issues Examine the critical issues Critical business applications Critical business applications Performance indicators Performance indicators Allows for measurement of plans effectiveness Allows for measurement of plans effectiveness Identify possible scenarios and priorities Identify possible scenarios and priorities Analyze top disasters impact on the business Analyze top disasters impact on the business Approval Approval Submit proposal Submit proposal

Critical Issues Establish critical applications Establish critical applications 10 important Issues should be addressed and examined in: 10 important Issues should be addressed and examined in: Pre-stages of development Pre-stages of development During the development During the development Following the completion of development Following the completion of development

Performance indicators Combination of Combination of Project statuses Project statuses Test runs of the infrastructure Test runs of the infrastructure Examples of performance indicators Examples of performance indicators Periodic reports Periodic reports Representation Representation Periodic tests Periodic tests Review process Review process Analysis Analysis

Possible Scenarios Analysis of disasters should include: Analysis of disasters should include: Effects on communications Effects on communications Impact Impact Disruption Disruption Seven questions should be asked and well thought out Seven questions should be asked and well thought out

Approval Prepare a well directed and clear proposal Prepare a well directed and clear proposal Present to upper management Present to upper management Critical for obtaining the required resources Critical for obtaining the required resources Once approved then begin establishing plan Once approved then begin establishing plan

Actual process of Disaster Recovery Plan Six key parts to creation of plan Six key parts to creation of plan Working group Working group Perform risk assessments and audits Perform risk assessments and audits Establishing priorities Establishing priorities Developing a resiliency design and recover strategy Developing a resiliency design and recover strategy Up-to-date inventory and documentation Up-to-date inventory and documentation implementation implementation

Working Group Oversees the development and implementation of entire plan Oversees the development and implementation of entire plan Should include the key personal Should include the key personal Should be held responsible for Should be held responsible for Activities Activities Planning Planning Providing monthly reports Providing monthly reports

Risk Assessments and Audits Working group must thoroughly understand Working group must thoroughly understand Businesses technology Businesses technology Networks Networks Systems and services Systems and services Working Group should prepare risk analysis Working Group should prepare risk analysis

Establishing Priorities Three commonly used priority levels Three commonly used priority levels Mission critical Mission critical Require significant effort to restore Require significant effort to restore Important Important Require moderate effort to restore Require moderate effort to restore Minor Minor Addressed last Addressed last

Design and Recovery Strategy: Resiliency Design Resilience of the network three levels should be examined Resilience of the network three levels should be examined Reliable networks Reliable networks High-availability networks High-availability networks Nonstop network environments Nonstop network environments Evaluating the networks should be comprehensive Evaluating the networks should be comprehensive Network links Network links Hardware resiliency Hardware resiliency Network design Network design Network services resiliency Network services resiliency

Design and Recovery Strategy Continued: Recovery Plan Address all aspects of the business Address all aspects of the business Include the expected Include the expected Down time of services Down time of services Action plans Action plans Escalation procedure Escalation procedure Provide a determination of certain thresholds Provide a determination of certain thresholds Encompass a backup strategy Encompass a backup strategy

up-to-date inventory and documentation Up-to-date inventory lists include: Up-to-date inventory lists include: Locations Locations Devices Devices Vendors Vendors Used services Used services Contact names Contact names

up-to-date inventory and documentation Continued documentation should include documentation should include Complete inventory of priorities Complete inventory of priorities Reviews Reviews Gap and risk analysis Gap and risk analysis Implementation plan Implementation plan Disaster recovery plan Disaster recovery plan Appropriate training Appropriate training

Implementation Key decisions must be made regarding: Key decisions must be made regarding: How it should be implemented throughout the organization How it should be implemented throughout the organization Who the critical and key members should be and their associated roles Who the critical and key members should be and their associated roles Practice the actual disaster recovery process Practice the actual disaster recovery process