Ingo DeppnerSTAR Regional Meeting at USTC Hefei 21 - 22.09.2015 1 Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional.

Slides:



Advertisements
Similar presentations
1 Beam Test Results of USTC LMRPC modules (50cm) Yongjie Sun presnted by Hongfang Chen.
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Progress report NeuLAND Outline Short reminder about NeuLAND Timing RPC concept Open questions - Impedance matching RPC prototype at GSI Next steps Collaboration.
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
MRPC R&D and production Yongjie Sun Center of Particle Physics and Technology, USTC.
New MRPC prototypes developed in Tsinghua Unversity Huangshan Chen (Tsinghua Unversity)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Wang Yi, Tsinghua University Joint meeting of HALL A and HALL C, SoLID status and Chinese contribution 1 Wang Yi Department of Engineering.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
CBM-Meeting, Darmstadt A.Schüttauf for the FOPI- collaboration FOPIs new MMRPC-barrel.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
Ingo DeppnerDPG-Frühjahrstagung, Mainz, A Multistrip-MRPC Prototype for the CBM Time-of-Flight Wall Outline: CBM-ToF requirements Conceptional.
STAR regional meeting, October UniversityWang Yi, Tsinghua University New MRPC R&D in Tsinghua University Outline: Introduction of MRPC.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
M. Bianco On behalf of the ATLAS Collaboration
Mariana Petris, CBM Collaboration Meeting, October 13-18, 2008, Dubna Mariana Petris, NIPNE - Bucharest C B M In-Beam Test Results of the Pestov Glass.
Proposal for large-area high- rate Time-of-Flight and Muon Telescope Detector with MRPC technology for EIC Zhangbu Xu (BNL) BNL, Rice, UCLA, Tsinghua,
Report on beam test results of high-rate MRPCs Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China.
18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Update on DHCAL and RPC progress Lei Xia ANL - HEP.
Performance of Prototype MRPC Detector for STAR Frank Geurts (Rice Univ.) for the STAR TOF collaboration.
Ingo DeppnerRPC 2012 Workshop, INFN, Feb A Mutistrip MRPC prototype for the CBM Time-of Flight wall Outline: Motivation / CBM-ToF Requirements.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
ITEP participation to the CBM TOF project ITEP ALICE - TOF group CBM – Russia meeting at ITEP, Nov 5 th, 2004.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
XIII workshop on RPC and related detectors. GENT university, Belgium, Feb Wang Yi, Tsinghua University 1 Development and test of real-size.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Ingo DeppnerDPG-Frühjahrstagung, Darmstadt, März Outline: CBM-ToF requirements What is an (M)RPC? Tof wall arrangements Ceramics RPC and.
Workshop on STAR upgrade. Sep th, 2015, USTC, Hefei Wang Yi, Tsinghua University 1 Status of high rate MRPC for CBM-TOF Outline: Introduction of.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
XI Workshop on Resistive Plate Chambers and Related Detectors, INFN, 5-10 February, Aging test of high rate MRPC Wang Yi Department of Engineering.
Trigger & Tracking detector for CMS
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
High rate time of flight system
eTOF MRPC Production Status at Tsinghua University
Status of BESIII and upgrade of BESIII
Performance studies of a single HV stack MRPC prototype for CBM
Department of Engineering Physics, Tsinghua University, Beijing, China
Beam detectors performance during the Au+Au runs in HADES
Performance of timing-RPC prototypes with relativistic heavy ions
Start Detector for pion experiments
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
A heavy-ion experiment at the future facility at GSI
Multigap Resistive Plate Chambers (MRPC)
Conceptual design of TOF and beam test results
STAR TOF MRPC Mass Production & Q.C. (USTC)
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
Performance of a Multigap RPC prototype for the LHCb Muon System
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
High time resolution TOF for SoLID
High time resolution TOF for SoLID
PID detector on BESIII Nov 27th, 2007 Yuekun Heng IHEP
Presentation transcript:

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional Meeting Workshop on STAR upgrades Daniel CEBRA

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Outline Test beam time at GSI in Oct Test beam results Test beam time at CERN in Nov Design consideration for the various prototypes Test beam time at BNL in Feb Synchronization proposal Design proposal for eTOF Summary

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Test beam GSI Test beam time in October 2014 at GSI (Hades cave) Sm beam with 1.2A GeV kin. energy 5 mm thick lead target „Uniform“ illumination of the counter surface Flux on the lower part of the setup was about few hundred Hz/cm 2 Delivered flux does not meet the CBM requirements THU-Strip Setup

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC-P2 prototype Full size demonstrator for high rates (1 - 10kHz/cm 2 ) Low resistive glass Spacers (fishing line) HV electrode (Licron  ) Pickup electrode 27 x 32 cm 2

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Full size demonstrator and reference MRPC used for the performance analysis MRPC-P2 (HD) THU-strip (Beijing)MRPC-P5 (HD) MRPC differential differentialdifferential glass stacksingle doublesingle active area 32 x 27 cm 2 24 x 27 cm 2 15 x 4 cm 2 strips strip / gap 7/ 3 7/ / 1.8 mm glass typelow resistive glass low resistive glass low resistive glass glass thickness0.7 mm 0.7 mm 1.0 mm number of gaps8 2 x 46 gap width 220  m 250  m 220  m Test beam GSI MRPC-P2 THU-strip MRPC-P5

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Results Efficiency > 98 % Resolution  62 ps Efficiency > 96 % Resolution  65 ps Differential singel stack MRPC with 8 gaps Differential double stack MRPC with 2 x 5 gaps vs. Data points at  11 kV in the left plot can be compared with  5.5 kV in the right plot. Single stack MRPC shows slightly better efficiency and time resolution. Single counter resolution is in the order of 45 ps including all electronic components.

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Results Differential single stack MRPC with 8 gas gaps Differential double stack MRPC with 2 x 5 gas gaps vs. In a triggered setup there is no major difference in the performance between both counter types. However, in a free running mode an impedance matched MRPC should give a better performance due to minimized signal reflections.

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Test beam CERN Cave specially build for our test beam time

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Test beam CERN Test beam time in Nov at CERN Lead beam with 30A GeV kin. Energy Beam intensity about 10 8 / spill Spill length of about 15 s 2 mm thick lead target Estimated flux of about few kHz/cm 2 Delivered flux probably still does not meet the CBM requirements Setup in Feb Beam Upper setup Lower setup

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Channel count GroupCounter# MRPCsChannels BucharestStrip counter Buc BucharestStrip counter Buc2015a/b2128 BucharestStrip counter Buc2010 (reference)1128 TsinghuaPAD counter348 TsinghuaStrip counter4256 USTCStrip counter4256 HeidelbergStrip counter P2164 HeidelbergStrip counter P5 (reference)132 GSIDiamond strip 2x16232 Total # About 17% of eTOF and about 1% of CBM

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Possible setup 1. Buc. 2012, 4 MRPC (same) 2. Buc. 2015, 1 MRPC single stack 1 MRPC double stack 3. Tsinghua Pad, 3 MRPC (same) 4. Buc. Reference, 1 MRPC nar. Strip 5. Tsg. strip, 3 MRPC, double stack 6. Tsg. strip, 1 MRPC single stack USTC strip, 2 MRPC, single stack 7. USTC strip, 2 MRPC, double stack 8. HD strip, 1 MRPC single stack 9. HD Ref, 1 MRPC, single stack Beam

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC design of Bucharest Prototype2015a2015b # strips40 Strip length / cm9.6 Pitch / mm # Gaps2 x 58 Gap size /  m 140 Impedance /  100 Glasslow res. HVMetal What is new? - 1 Prototype (2015a) with a double stack matched to 100  impedance and a changed strip width - 1 Prototype (2015b) with a single stack matched to 100  impedance and a changed strip width 2015a 2015b

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC design of Tsinghua PrototypeABCD # strips32 Strip length / cm27 Pitch / mm10 # Gaps2 x 4 8 Gap size /  m Impedance /  50  100 Glasslow res. HVCol. carbon What is new? - All 4 prototypes with fully new designed readout electrode (number of strips, signal routing - prototype B equal to prototype A but with gas sealing - the readout electrode of prototype C is designed in HD however with the counter design from Tsinghua - single stack has the design of the Heidelberg prototype but with HV supply method of Tsinghua

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC design of Tsinghua Single stack double stack double stack (Heidelberg prot.) - single stack MRPC has by construction a fully equal signal path length - signal path length is in one of the double stack prototypes not equal - strips due to HV supply not symmetric (two prototypes)

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC concepts Differential singel stack MRPC with 8 gaps Differential double stack MRPC with 2 x 4 gaps Advantages - lower High Voltage (<  6 kV) - smaller cluster size Disadvantages - more complex construction - merging of signals leads to reflections in the counter - more glass plates (#10) - impedance matching hardly possible (100  ) Advantages - simpler construction - symmetric signal path - fewer glass plates (#9) - lower weight - impedance matching easy possible (100  ) Disadvantages - higher High Voltage (>  10 kV) - bigger cluster size vs.

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC design of USTC PrototypeABCD # strips32 Pitch / mm10 # Gaps2 x 6 12 Gap size /  m 140 Impedance /  50  100 Glassfloat HVCol. carbonMetalCol. carbonMetal What is new?  more details in Yongjie’s talk - All 4 prototypes with fully new designed readout electrode (number of strips, signal with, signal routing - prototype B equal to prototype A but different HV connection (Bucharest design) - the same for prototype C and D, they are additionally sealed

Ingo DeppnerSTAR Regional Meeting at USTC Hefei MRPC design of Heidelberg P2P5 # strips3216 Strip length / cm274 Pitch / mm109.7 # Gaps88 Gap size /  m 220 Impedance /  100 Glasslow res. HVCol. carbonRes. Kapton What is new? - HV electrodes in both prototypes - Prototype P2 has colloidal carbon painted on Kapton foil (instead of Licron) - Prototype P5 has a new low resistive Kapton foil, with surface resistivity of 5 M  /

Ingo DeppnerSTAR Regional Meeting at USTC Hefei HV electrode 1.Bucharest design: Metal strips connected with resistors superimposing the readout strips on an additional PCB 2.Tsinghua design: Colloidal graphite painted on the glass facing to the readout strips. Resistive layer and readout strips are separated via isolating foil. 3.USTC design: Colloidal graphite painted on the glass. Readout strips are facing to the honey comb. Resistive layer and readout strips are separated via PCB material. 4.Heidelberg design 1: Colloidal graphite painted on a Kapton foil facing to the glass. Kapton foil acts also as insulator between resistive layer and readout strips. 5.Heidelberg design 2: Resistive Kapton foil (5 M  /) on top of the glass. Resistive layer and readout strips are separated via isolating foil. Currently 5 methods to apply HV exist

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Goals -Efficiency, time resolution, rate capability of the new prototypes -Single stack vs. double stack: Which is the best solution? -Impedance matching: is it so important? Can we solve this issue in a triggered system? -HV electrode: 5 solution on the market! Which is the most optimal? -Gas diffusion problem: Is sealing the way to go? What we expect to learn from this beam time?

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Module design for STAR -Design is the same as in the CBM TOF TDR -Box size 102 x 49 x 11 cm 3 -Module is suppose to be a full size demonstrator for STAR -During the CERN beam time in Nov. 2015, 3 of this chambers housing 3 MRPCs each will be tested -One of the modules will be tested in Feb at BNL a b c a: MRPC (MRPC3a/b) b: PADI (Preamplifier) c: Crate with GET4 (TDC) d: HV, gas and ground feed-though e: gas tight chamber d e

Ingo DeppnerSTAR Regional Meeting at USTC Hefei CBM TOF electronic chain Free running DAQ MRPC Module connect to PADI with crate for TDC cupper optic ROB = first concentration stage GBTx = second concentration stage DPB = third concentration stage max 4 x ROB next ROB (max 4x) TOF-ROB optic direct connection to DPB without GBTx optic PC FLIB Clock 240 MHz160 MHz 120 MHz from CBM cupper Sync

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Electronic chain in Feb 2017 optic PC FLIB TOF-ROB cupper optic Free running DAQ Clock 160 MHz 40 MHz from STAR HPTDC Sync 240 MHz Trigger signal from STAR FPGA board Sync Trigger number How to synchronize the TDCs? (proposal from Heidelberg/GSI)

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Electronic chain in Feb 2017 optic PC FLIB TOF-ROB cupper optic Free running DAQ Clock 160 MHz inject 9.4 MHz from STAR to both TDC systems Sync 240 MHz FPGA board Sync Trigger number How to synchronize the TDCs? (proposal from Geary) Trigger signal from STAR HPTDC

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Goals -Get to know the STAR environment -Space constrains at the east pole side: Is there enough space for 3 module layers? Do the electronic crates have enough space or do we have to find other solutions? -How to synchronize the TDCs? -How to merge the data? -How to calibrate the data? -Can we do already now PID? What we expect to learn from this beam time?

Ingo DeppnerSTAR Regional Meeting at USTC Hefei STAR Space for additional Time-of-Flight detectors

Ingo DeppnerSTAR Regional Meeting at USTC Hefei End-cap design Interaction point in collider mode Interaction point in fix target mode 3 layers 36 CBM-TOF modules 108 MRPC3a/b 6912 readout channels About 10 m 2 active area CBM-TOF module

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Summary  The design of the differential single stack MRPC from Heidelberg is driven by the free- streaming readout  impedance matching is realized.  The single stack MRPC shows slightly better efficiency and time resolution in comparison to a double stack MRPC.  Single counter resolution is in the order of 45 ps including all electronic contributions. However this value was achieved in a low rate environment.  Both types of MRPC detectors fulfill the CBM ToF requirements. However, in a free running mode an impedance matched MRPC might show a better performance due to minimized signal reflections.  In the next beam time 20 MRPCs with about 1200 channels will be tested. Based on these results a decision on the design will be taken.  A full size module for STAR will be built and installed in STAR in summer 2016  The main goal of the Feb test run is the synchronization and merging the data of both subsystems. Thank you for your attention

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Backup 80  1 ns Backup Slides

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Backup Slides CBM Physics topics  Deconfinement / phase transition at high ρ B  QCD critical endpoint  The equation-of-state at high ρ B  chiral symmetry restoration at high ρ B Observables  excitation function and flow of strangeness and charm  collective flow of hadrons  particle production at threshold energies  excitation function of event-by-event fluctuations  excitation function of low-mass lepton pairs  in-medium modifications of hadrons (ρ,ω,φ → e+e-(µ+µ-), D) non twisted part connector  p K D. Kresan Au + 25GeV Kaon acceptance depends critically on TOF resolution

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Incident particle flux URQMD simulated charged particle flux for Au + Au (minimum bias) events at 25 AGeV assuming an interaction rate of 10 MHz kHz/cm 2 Flux ranging from 0.1 to 100 kHz/cm 2 At different regions MRPC counters with different rate capabilities are needed

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Engineering design of the CBM experiment TOF TRD RICH Magnet Nominal ToF position is between 6 m and 10 m from the target Movable design allows for optimization of the detection efficiency of weakly decaying particles (Kaons) Backup Slides

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Counter occupation 80  1 ns Active area of overlain counters D.u.t. MRPC-P2: 32 x 27 cm 2 Reference MRPC-P5: 15 x 4 cm 2 Plastic: 8 x 2 cm 2

Ingo DeppnerSTAR Regional Meeting at USTC Hefei Backup 80  1 ns Cut 1 Cut 3 HV = 11 kV, U thr = 200 mV