1 Transfer Limit Hardening (TLH) Methodology Need to translate the NEEM soft constraint results to fixed transfer limits for futures 2, 3, 5, 6, 7 and.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Jump to first page National Instantaneous Reserves Market Vladimir Krichtal Transpower New Zealand.
Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
Queue Reform at the Midwest ISO NARUC February, 2008.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Dale Osborn Midwest ISO March 17, 2008 Detroit, Michigan Great Lake Regional Wind Institute Introduction to the Midwest ISO.
Regional Transmission Organizations: The Future of Transmission? Dave Edwards 4/17/2004.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Integrated Planning Model (IPM) What It Is, Who Uses It, How It Works, What It Can Show You Presentation for For the Clean Air Act Advisory Committee Permits/New.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Eastern Wind Integration and Transmission Study
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Seams Issues Raymond DePillo Vice-President – Power Operations and Asset Management PSEG Energy Resources & Trade LLC October 7, OPSI Annual.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Production Cost Model Fundamentals
2015 Summer Shoulder-Peak Near-Term Assessment of Transmission System Performance ~ Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Perspectives on Municipalization Jim Robb Senior Vice President, Planning and Development March 13, 2012.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
©2009 Office of Massachusetts Attorney General Martha Coakley Transmission Planning & Construction “When, Where, How Much and Who Pays” -Comments by Fred.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Transmission Options for Mariah Project, Phase II 3/10/2010.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
FERC Staff’s Report on Demand Response and Advanced Metering.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Integrating wind resources: siting decisions in the Midwest Julian Lamy (speaker) Ines Azevedo Paulina Jaramillo.
Energy Business Solutions Michigan IRP Working Group Meeting July 25, 2005.
The Impact of Intermittent Renewable Energy Sources on Wholesale Electricity Prices Prof. Dr. Felix Müsgens, Thomas Möbius USAEE-Conference Pittsburgh,
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
Energy Markets at the Crossroads Illinois State University Institute for Regulatory Policy Studies 12 December 2002 Springfield, Illinois Vito Stagliano.
1 Progress of Market Integration in North America W. Scott Miller, III Executive Director, Market Applications PJM Interconnection, L.L.C.
Future 2 Soft Constraints Transfer Limit Hardening By the NEEM-TX Subteam SSC Meeting June 6, 2011.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
Electrical Maps of Final 3 Futures Stanton W. Hadley 11/9/11.
General Trends and Summary New gas generation is presently increasing faster than supply. However a slowing economy and less rapid demand in the industrial.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Joel Bladow – Tri-State G & T
North American Markets Status
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Resilience and Reliability in PJM’s Competitive Markets
LDZ System Charges – Structure Methodology 26 July 2010
MISO Market Transformation The Intersection Of Renewables, Transmission And Technology Raj Singamsetti Executive Director of Portfolio Strategy,
Electrical Maps of Final 3 Futures
NERC Congestion Management
Lecture 38 Constrained Optimization
Presentation transcript:

1 Transfer Limit Hardening (TLH) Methodology Need to translate the NEEM soft constraint results to fixed transfer limits for futures 2, 3, 5, 6, 7 and 8 For each future, SSC will have to decide whether to use Baseline Infrastructure transfer limits or transfer limits based on the soft constraint sensitivity results If the SSC chooses the latter, the approved transfer limit hardening methodology will be applied to the preferred soft constraint sensitivity flows to develop new fixed transfer limits

2 TLH Methodology Options Three proposed methodologies – Ruthven/Hadley/Chattopadhyay (RHC) Proposal Focused on pipe capacity factors and shadow prices – NGO Proposal Focused on Flow Duration Curve and fraction of time the pipe is full – Johnson Proposal Focused on total energy flow and base line utilization All methodologies based on data

3 NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN OH PJM Rest of RTO TVA VACA NEISO NYISO A-F NYISO GHI NYISO J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes BAUF 1S2

4 NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN OH PJM Rest of RTO TVA VACA NEISO NYISO A-F NYISO GHI NYISO J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes LowC O2F2 S1

5 NWPP RMPA MAPP US MAPP CA NE SPP N SPP S AZ NM SNV ERCOT MISO W MISO MO IL MISO WUMS MISO MI MISO IN OH PJM Rest of RTO TVA VACA NEISO NYISO A-F NYISO GHI NYISO J & K PJM Eastern MAAC PJM Rest of MAAC SOCO FRCC ENTERGY Non RTO Midwest HQ Maritimes LowC O2F2 S2

6 OL75 Top 20 Default (RHC Old)

7 OL25 Top 20 Default (RHC Old)

Shadow Prices

RHC Old Curve

RHC New Curve

RHC New Revisions Max/Min Desired Capacity Factors Installed – 85% - 40% for total flow – 35% - 15% for overload flow – Prevents extremely low desired capacity factors seen with old RCH Linear Curve based on relative shadow price – CF=(x-Shadow Price)/x; x=75% of the max future base case shadow price – Curve will self-adjust for each future relative to shadow prices

Future 2 Top 10

13 OL75 Top 20 Default (RHC New)

14 OL25 Top 20 Default (RHC New)

TLH Transfer Limit Decision Item 1 Option 1: – Average value (using revised RHC) Option 2: – Average value (using RHC old) Option 3?: – Averages using relaxed constraints

Option 1: Average (Using RHC New) OL75Average SPP_N_2_ENT13,843 MISO_W_2_PJM_ROR12,420 NE_2_MISO_W2,489 SPP_N_2_MISO_MO-IL2,019 SPP_S_2_ENT1,992 ENT_2_SOCO1,952 NYISO_A-F_2_NYISO_G-I1,435 MISO_IN_2_MISO_MI887 IESO_2_MISO_MI751 MISO_WUMS_2_MISO_MI688 SPP_N_2_MISO_W337 NEISO_2_NYISO_J-K315 MISO_IN_2_PJM_ROR261 SPP_N_2_SPP_S249 NE_2_SPP_N161 MISO_W_2_MISO_MO-IL123 NYISO_J-K_2_PJM_E74 IESO_2_MISO_W67 MISO_W_2_MISO_WUMS38 MAPP_US_2_MISO_W11 OL25Average MISO_W_2_PJM_ROR31,421 SPP_N_2_ENT16,272 MISO_WUMS_2_MISO_MI15,407 MISO_MI_2_MISO_IN8,385 SPP_N_2_MISO_MO-IL7,084 MISO_W_2_MISO_WUMS5,699 NE_2_MISO_W5,612 SPP_S_2_ENT5,132 MISO_W_2_MISO_MO-IL4,964 ENT_2_SOCO4,505 MISO_MO-IL_2_MISO_IN4,123 NE_2_SPP_N3,355 IESO_2_MISO_MI2,904 NYISO_A-F_2_NYISO_G-I2,271 PJM_ROR_2_PJM_ROM1,789 SPP_N_2_SPP_S1,094 NEISO_2_NYISO_J-K825 PJM_ROR_2_VACAR460 IESO_2_NYISO_A-F358 NYISO_G-I_2_NYISO_J-K77

Option 1: Average Large Expansion from Wind-rich West to East (MISO_W to PJM_ROR and SPP to ENT 10,000 MW+ increases) Balanced use of the methodologies developed by the subteam

Option 2: Average (Using RHC Old) OL25Average MISO_W_2_PJM_ROR36,045 MISO_WUMS_2_MISO_MI18,645 SPP_N_2_ENT16,272 MISO_W_2_MISO_MO-IL10,484 NE_2_MISO_W9,107 MISO_W_2_MISO_WUMS8,798 SPP_N_2_MISO_MO-IL8,553 MISO_MI_2_MISO_IN8,385 SPP_S_2_ENT5,976 ENT_2_SOCO5,695 MISO_MO-IL_2_MISO_IN4,565 NE_2_SPP_N4,475 IESO_2_MISO_MI3,174 NYISO_A-F_2_NYISO_G-I2,697 NEISO_2_NYISO_J-K2,343 PJM_ROR_2_PJM_ROM2,234 SPP_N_2_SPP_S1,170 NYISO_A-F_2_PJM_ROM943 MAPP_CA_2_MISO_W834 IESO_2_MISO_W526 OL75Average MISO_W_2_PJM_ROR17,211 SPP_N_2_ENT14,273 SPP_N_2_MISO_MO-IL3,902 SPP_N_2_MISO_W3,844 ENT_2_SOCO3,343 NE_2_MISO_W3,307 SPP_S_2_ENT2,572 NYISO_A-F_2_NYISO_G-I1,962 NEISO_2_NYISO_J-K1,940 MISO_W_2_MISO_MO-IL1,398 IESO_2_MISO_MI1,226 MISO_IN_2_MISO_MI1,119 NYISO_A-F_2_PJM_ROM879 MISO_W_2_MISO_WUMS804 IESO_2_MISO_W781 MISO_WUMS_2_MISO_MI757 MAPP_CA_2_MISO_W738 MISO_IN_2_PJM_ROR465 MISO_WUMS_2_PJM_ROR276 SPP_N_2_SPP_S255

Option 2: RHC Old Larger inter-regional transfer increases create a more meaningful difference between national and regional futures Matches up with idea of exporting high capacity factor wind from west to east

Option 3? Relaxed Constraints OL75Average MISO_W_2_PJM_ROR16,276 SPP_N_2_ENT15,330 SPP_N_2_MISO_MO-IL4,237 ENT_2_SOCO3,607 NE_2_MISO_W3,404 SPP_S_2_ENT3,060 NYISO_A-F_2_NYISO_G-I2,179 MISO_W_2_MISO_MO-IL1,920 MISO_IN_2_MISO_MI1,733 SPP_N_2_SPP_S1,596 IESO_2_MISO_MI1,407 MISO_IN_2_PJM_ROR1,393 MISO_WUMS_2_MISO_MI1,162 NEISO_2_NYISO_J-K967 NYISO_G-I_2_NYISO_J-K825 ENT_2_TVA_Transmission780 SPP_N_2_MISO_W638 PJM_ROR_2_PJM_ROM621 IESO_2_MISO_W284 NE_2_SPP_N275 OL25Average MISO_W_2_PJM_ROR34,830 MISO_WUMS_2_MISO_MI18,935 SPP_N_2_ENT18,010 MISO_MI_2_MISO_IN9,991 MISO_W_2_MISO_MO-IL9,438 SPP_N_2_MISO_MO-IL9,262 MISO_W_2_MISO_WUMS8,778 MISO_MO-IL_2_MISO_IN8,350 NE_2_MISO_W7,106 SPP_S_2_ENT5,955 ENT_2_SOCO5,659 NE_2_SPP_N4,366 IESO_2_MISO_MI4,282 PJM_ROR_2_PJM_ROM3,586 NYISO_A-F_2_NYISO_G-I3,168 SPP_N_2_SPP_S2,315 PJM_ROR_2_VACAR1,963 NEISO_2_NYISO_J-K1,360 NYISO_G-I_2_NYISO_J-K1,050 IESO_2_NYISO_A-F1,024

OL75 Options

OL25 Options

Anomalies Option A Make no adjustments for anomalies “Reality” check on large transfer limit expansions will be applied when SSC decides on Phase II build-outs More time available for reasoned analysis of possible anomalies

Anomalies Option B Values adjusted to spread inter-regional transfers across NEEM regions – Model mechanically moves generation to lowest cost region as transmission barriers decrease – In reality, generation will be more evenly spread out taking advantage of low cost resources in each region Total inter-regional transfer level not adjusted – i.e. MISO-PJM value; SPP-ENT value Intra-regional transfers adjusted down from anomalous levels if necessary – E.g. intra-MISO transfers greater than 5000 MW – Massive changes between OL75 and OL25 within regions with $0 hurdle rates likely a result of small changes in generation cost multipliers or capacity factors

OL75 Anomaly Adjustment Miso-PJM Op 3 Total: MW – Almost all from MISO_W – Split evenly among MISO_W, MISO_WUMS, MISO_MO-IL, MISO_IN, MISO_MI to PJM_ROR (3500 MW) SPP-ENT Op 3 Total: – Mostly from SPP_N – Split evenly among SPP_N, SPP_S to ENT (9000 MW) No other adjustments

OL25 Anomaly Adjustment Miso-PJM Op 3 Total: MW – All from MISO_W – Split evenly among MISO_W, MISO_WUMS, MISO_MO-IL, MISO_IN, MISO_MI to PJM_ROR (7000 MW) SPP-ENT Op 3 Total: – Mostly from SPP_N – Split evenly among SPP_N, SPP_S to ENT (12000 MW) Reduce inter-MISO transfers by 50% – Mostly feeding MISO_IN which must have marginally higher generation costs

TLH Transfer Limit Decision Item 2 Option 1: OL75 Option 2: OL25

Production Cost Savings Relative to base run, increased transfer limits may reduce production costs for eastern interconnection. Production cost savings can be used to evaluate some economic benefits from transfer limit expansions. A comparison of production cost savings, expressed in present value, from the OL75 and OL25 runs may help inform the transfer limit decision.

Comparison of Production Cost Savings Present Value of Savings (relative to the base run, in Billions) Option 1 (avg. w/ new RHC & default parameters) Option 2 (avg. w/ old RHC & default parameters) Option 3 (avg. w/ new RHC & relaxed parameters) OL 75$67.7 OL 25$101.9 Difference (OL25 – OL75) $34.2

Option 1: OL75 More likely to be “cost-effective” transmission expansion OL75 and OL25 produce similar level of aggregate generation build – OL25 builds 3 GW more wind – OL25 shifts generation to lowest cost regions – particularly within MISO – and shifts some wind generation from PJM to MISO OL25 flows overly concentrate generation in a single region (MISO_W) producing unrealistic results

Option 2: OL25 OL25 significantly increases transmission build to a level more appropriate for a nationally- focused future – Without the greater increase in inter-super-region transfer limits produced by OL25, national and regional futures are unlikely to produce meaningful differences that we can learn from