Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.

Slides:



Advertisements
Similar presentations
16-17 March 2010 CERN Introduction by W. Weingarten Review of SPL RF power couplers 16/17 March 2010 Review of SPL RF power couplers 1.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
KCS Ongoing R&D Christopher Nantista SLAC LCWS11 Granada, Spain September 29, …… …… …… … ….
Progress and Plan for Superconducting RF Cavity RF Group.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Coupler without copper coating S. Kazakov 11/13/2013.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
High Power Test of Mizuno - Ohtsuka Dry Load S. Matsumoto and T. Higo Report made on
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
LCLS-II Couplers and Related R&D Chris Adolphsen WWFPC, CERN June 23, 2015.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Overview of CW input coupler for ERL
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
In-Vessel Electronics Infrastructure Craig Thorn LAr40 Cold Electronics Far Site Review, December 6-9, 2011.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
Medium beta cryomodule demonstrator M-ECCTD
T5.2: Harmonization - Material and Component Reference
Power Couplers, HOM Couplers and Tuners for the XFEL
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
Modified TTF3 Coupler Design and Related R&D for LCLS-II
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
Presentation transcript:

Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012

Khabiboulline, NGLS Mtg Apr.13, ILC coupler thermal analysis at 15 kW of average power. Weak point is overheating of the warm bellow of the central conductor due to RF losses. Copper coating TTF-III coupler thermal analysis

Khabiboulline, NGLS Mtg Apr.13, CW operation tests of TTF-III coupler. J. Knobloch et. al., PAC’05 TTF-III coupler CW tests The feedthrough at the warm ceramic was removed and a tube was inserted into inner conductor. Room- temperature air was flowed through the tube and allowed to escape through the open feedthrough flange. Since there are small holes in the inner conductor, the entire warm coupler thus was at 1 atm, but most of the air flow was limited to the interior of the inner conductor. The total air-flow rate for these tests was about 20 liter/min.

EXPERIMENTAL SETUP Tests at Rossendorf. Room temperature only. The only cooling provided was cold-water (2.2 ◦C) cooling of the 70 K flange. IR sensors monitored via viewports the warm ceramic temperature and that of the warm inner conductor. The tuning rod was removed and a PT1000 temperature sensor was attached inside the inner conductor near the bellows. Several PT100 sensors were also mounted on the exterior of the coupler. A CPI klystron provided 10 kW CW RF power. Tests at BESSY At BESSY, the waveguide test stand was mounted in the HOBICAT facility. Initial warm tests with a matched load were performed to verify the Rossendorf results. For cryogenic tests, HOBICAT was operated with liquid nitrogen only. Copper bands were attached to the 77 K and 2 K points of the coupler so that the coupler could be cooled. Typically the 77 K point reached an equilibrium temperature of about 120 K. The waveguide ferrite load was also in the HoBiCaT insulation vacuum and kept at room temperature by the water flow that removes the dissipated RF power. Additional ports were added in the waveguide to improve the pumping of the load by the insulation vacuum. Nevertheless, at power levels above 2 kW the outgassing from the ferrite was so severe that arcing would occur in the load. Thus cold tests were limited to 2 kW TW power. For SW operation the load was replaced by a short. SUMMARY AND OUTLOOK The extrapolation of the test results suggest that the existing TTF-III coupler can very likely be operated safely up to 10 kW TW and 5 kW SW, although the direct verification is still outstanding. Whether long term operation with a cavity at this power level is possible must also still be demonstrated. For example, outgassing may be an issue due to the elevated coupler temperatures. Khabiboulline, NGLS Mtg Apr.13,

5 TTF-III coupler power processing Coupler power processing 1. Before installation 2. With cavity warm 3. With cavity cold Processing in pulsed regime Speed limited by vacuum Most of the time at RF power P>30 kW No multipactoring at RF power P<20 kW Dry air or nitrogen storage is important May not need power processing at P<20kW

TTF III coupler for NGLS 1. Complicated for fabrication 2. Complicated for installation 3. High fabrication cost 4. Power limit 4 kW as is due to overheating 5. N2 gas cooling of central conductor can increase operating power range but eliminate double window reliability 6. Multipactoring at 3-30kW power may be not an issue Khabiboulline, NGLS Mtg Apr.13,

New power coupler design for NGLS Coaxial coupler compatible with cavity Waveguide input 20 kW CW 1.3 GHz TW RF power operation Reliability, one or two windows Clean and simple assembly Safe and simple operation Simple fabrication and low cost Low cryogenic load Reduced power processing time Minimum or now multipactoring at 3-30kW power Khabiboulline, NGLS Mtg Apr.13,

Number of ceramic windows Two windows  Safe operation. Vacuum leak of one window is not so critical.  More fabrication cost  More parts One window  Simpler fabrication, less windows, less parts, no remote operation  Lower cost  Lower reliability. But several machines in operation with one window Khabiboulline, NGLS Mtg Apr.13,

Fixed coupling options without external matcher Khabiboulline, NGLS Mtg Apr.13, Optimum coupling for a high current  Pros: minimum power requirement at high current, less sensitive to micro- phonics at low current  Cons: power more power for low current 2. Optimum coupling for low current Pros: minimum power requirement at low current Cons: power more power for high current 3. Intermediate coupling Pros: less sensitive to micro-phonics at low current Cons: higher Extra power for both currents, more sensitive to micro-phonics at high current