A1 - Contract Sales Price or Existing Debt  Purchase: Contract sales price of the property  Refinance: The amount of the existing debt  HUD REO:

Slides:



Advertisements
Similar presentations
Managing FHA Loans In Point – Correctly processing FHA loans emphasizing the MCAW Presented By Calyx Online Training Stephen Breden September
Advertisements

Chapter 8 Federal Housing Policies: Part One. Chapter 8 Learning Objectives Understand how federal legislation has affected the mortgage and housing markets.
Chapter 14 Mortgage Default Insurance, Foreclosure, and Title Insurance.
Welcome Home Buying 101. Home Buying 101 Home Buying 101 Presented by NASA Federal Credit Union Bert Aguilera Mortgage Consultant NMLS # (301) ,
FHA Streamlined(K) & 203(k) Training Presents July 20, 2011.
LEARN HOW TO SELL USING 203(k) LOANS With Tim Pascarella.
FHA 203K Streamline. Why FHA 203K Streamline? Through the FHA 203K Streamline program, borrowers can purchase or refinance their home and include the.
The Final RESPA Rule. Principles of RESPA Reform Help consumers shop for the best loan Shopping leads to greater competition & lower prices 2.
Understanding The Good Faith Estimate, HUD-1 and Short Sales Presented by: First Place Bank and NorthStar Title Services.
Real Estate Law An Introduction to the Closing Real Estate Law An Introduction to the Closing.
FHA Streamlined 203(k). FHA Streamlined 203(k) Review What is the FHA Streamlined 203(k) Loan Program? What are the program guidelines? What types of.
Partners for the Path Ahead FHA Streamlined 203(k) Loan Program 8/7/14.
FHA Streamlined 203(k) Simple Process For Simple Repairs.
© OnCourse Learning. All Rights Reserved. Closing the Real Estate Transaction Learning Objectives  List the preliminaries to closing  List the items.
Town of Davie Neighborhood Stabilization Program (NSP) Applicant Workshop January 30, 2010.
Navigating your entitlement to buy and/or sell a residence under Permanent Change of Station orders.
Mortgage Loans Things everyone should know. Darin Domingue, CEM Deputy Chief Examiner Office of Financial Institutions.
Reverse Mortgages for Real Estate Professionals GBBR Realtor Fair Eric Rittmeyer, CRMP October 16,
Objective 2.03 Analyze financial and legal aspects of home ownership.
SM Mortgage Basics Overview Brought to you by and SM.
Finding and Selecting a Home.  What Are the Steps for Buying a Home? 1.Determine if you should rent or buy 2.Determine how much you can afford to spend.
Buying a Home. Renting a House AdvantagesDisadvantages.
Realizing the American Dream
7e Contemporary Mathematics FOR BUSINESS AND CONSUMERS Brechner PowerPoint Presentation by Domenic Tavella, MBA Mortgages ©2014 Cengage Learning. All Rights.
Welcome to Full FHA 203(k) Training!
Chapter 9 Real Estate Finance Practices and Closing Transactions 2010©Cengage Learning. All Rights Reserved.
Chapter 14 Mortgage Default Insurance, Foreclosure, and Title Insurance © OnCourse Learning.
FHA 203K Program Done In-House & Done Right!. How Can We Help?: Offer Home Buyers the opportunity to create their own Home Makeover and live in the home.
The Buyers’ Bonus Mortgage Program Steve Calem, MBA, CMPS Vice President, Real Estate Lending American Bank Tel:
FHA Streamlined(K) Training Presents May 4, 2011.
AGENDA Program Features Eligible/Ineligible Improvements
Purchase Loans 1 8/4/ Purchase Loans Minimum Cash Investment Under HERA, minimum cash investment = 3.5% of lesser of sales price or appraised value.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
CRISSY NMLS # Presentation for Real Estate Professionals Only HECM for PURCHASE.
CORP. NMLS# For business and professional use only. Not for Consumer Distribution. NDC GFE Guide PMAC Lending Services, Inc., February, 2014 Disclaimer:
CFPB AND THE REO TRANSACTION
REVIEWING ESTIMATED HUD STATEMENTS. What is a HUD statement?  A Housing and Urban Development (aka HUD) statement is a document prepared by a closing.
IReverse Home Loans, LLC(800) a Subsidiary of Hopkins Federal Savings Bankwww.iReverse.com Reverse Mortgage Training Manual.
Chapter 10. Georgia Real Estate An Introduction to the Profession Eighth Edition Chapter 10 Lending Practices.
3-n-1 Financing 1.Purchase 2.Remodel 3.Make Energy Efficient.
© 2009 by South-Western, Cengage Learning SAMIRLANDER Chapter 14.
© 2015 Fidelity National Title Group a a Know before you close. The New Loan Estimate & Closing Disclosure Explained A look at the different sections of.
Renovation Financing Presented By: Kim Renock, CMB, CRO.
Objective 2.03 Analyze financial and legal aspects of home ownership.
BROKER’S GUIDE TO TRID.
Objective 2.03 Analyze financial and legal aspects of home ownership.
FHA’s Energy Efficient Mortgages. Purpose of the EEM  To Help Achieve the National Energy Goals  To Help Create Affordable Housing.
Lima One Capital Broker Program
Understanding the FHA 203K STREAMLINE AfterBefore.
Loan Sizing/Eligible Debt Handbook Chapter 3. Topics Covered  Loan sizing benchmarks per Section 232 Program  Eligible mortgage costs included in 232.
A1 – Percentage of Applicable LTV  This figure comes from the applicable LTV charts Maximum Purchase LTV Factors Owner Occupant95% - 1 unit > 660 Score.
STREAMLINED (k) Make the most of a good thing!. “Go Green” Home sales competitive & tight FTHOs still prevail Buyers seek out best & the most for their.
DC OPEN DOORS JULY  Program issuer is the District of Columbia Housing Finance Agency (“DCHFA”)  Reservations for the MCC will begin being accepted.
Chapter 18 Escrow Procedures. The last step in the loan process is CLOSING, when the loan proceeds are distributed and a deed to the property is transferred.
Lima One Capital Broker Program OnBoarding Presentation Welcome Package.
The Home-Buying Process Finding and Selecting a Home.
Understanding Home Equity Conversion Mortgages ‏ Discover how to Unlock the Equity in your Home.
Understanding 203K Loans. Presented By: Mark Williams HUD Certified 203K Loan Consultant North Carolina Licensed Home Inspector (#1814) President: Integrated.
Introduction to 1x Close Construction to Permanent Loans
The Final RESPA Rule.
DC Open Doors October 2016.
LenderSelect Mortgage Group Education for Renovation
The New Loan Estimate & Closing Disclosure Explained
LenderSelect Mortgage Group Lender Solutions to Save Your Sale
Federal Housing Policies:
Loan Officer, Branch Manger
DC Open Doors October 2016.
Prime Jumbo Program October 2017.
Module 2: The Loan Estimate – Step by Step
Presentation transcript:

A1 - Contract Sales Price or Existing Debt  Purchase: Contract sales price of the property  Refinance: The amount of the existing debt  HUD REO: FHA Sales Contract A2 - ‘As-Is’ Value Sales price of the home Sales price of the home HUD REO – Original listing price by HUD Refinance - if the property has been owned less than one full year, use the lesser of the ‘as-is’ value or the original acquisition cost, plus any debts incurred for renovation, since the acquisition. Refinance - if the property has been owned less than one full year, use the lesser of the ‘as-is’ value or the original acquisition cost, plus any debts incurred for renovation, since the acquisition.

A3. After-Improved Value This value will come from the new 203(k) appraisal. The appraisal should represent the appraiser's estimate of the property's value after completing the proposed project presented in the Consultant’s Work Write-Up or Contractors bids (Streamlined 203(k) only ) A4. 110% After-Improved Value The After-Improved Value multiplied by 110% Condominiums can not go over 100%. Condominiums can not go over 100%.

A5. Borrower Paid Closing Costs & Prepaids (Refinances Only) These figures should come from the Good Faith Estimate. It should include FHA Allowable Closing Costs and Prepaids. A6. Allowable Energy Improvements The Allowable Energy Improvements, will be determined by the Home Energy Rating Systems (HERS) report and will consist of those items that will return a measurable savings in energy costs, over the life of the improvement.

Scenarios where Energy Efficiency Improvements can be used… If borrower is having difficulty qualifying, approved energy efficient improvements are not included in the borrower’s debt to income ratio. If the loan amount exceeds the maximum mortgage for the area, the borrower can exceed the loan limits by the exact dollar amount of approved energy efficient improvements. If borrower is doing a Streamlined 203(k), the approved energy efficient improvements are not included in the $35,000 maximum (line B14).

B1 Total Cost of Repairs (includes repairs in A6 and REO lead based paint stabilization) Once the signed Specifications of Repairs, has been reviewed or completed by the HUD Consultant, they sign a template Draw Request form (HUD-9746-A) stating that they have personally inspected the property. This needs to be an original signature and not reproduced or “e-signed”. On a Standard 203(k) the total costs estimated amount on the Draw Request form (Line 36), is entered on B1. The contractor’s estimates would be used on a 203(k) streamline since the draw request form isn’t required. If this is a HUD REO property, the estimated costs for lead based paint stabilization are included which may be different from the HUD credit.

 Protects the borrower from any unforeseen problems or those items that could not have been anticipated or revealed before commencement of the renovation process.  Can be used for health, safety, and necessity items or for additional improvements with Standard 203(k).  This amount should be between 10% and 20% of the renovation amount as determined by the DE Underwriter after considering the recommendation of the FHA Consultant.  If the utilities are off when the property is inspected, the contingency reserve must be 15%.

 The contingency reserve amount, can be paid in cash. In this case, if the contingency reserve is paid in cash, enter a "0" on this line.  In the remarks sections, make a note that the contingency has been paid in cash and list the dollar amount paid, as it must be placed in the repair escrow account at closing.  If the contingency reserve comes from someone other than the borrower, document the file with the donor’s name. Funds put up in cash, can be returned to the contributor, if they are not used.

Inspection Fees The number of inspections allowed on a project will depend on the scope of the work. Title Update Fees Lien waivers are acceptable for interim draws where the lien law does not require a title endorsement. A final title update/endorsement is required for the final disbursement.

The borrower is permitted to finance up to 6 months of mortgage payments on a Standard 203(k). This is allowed ONLY when the property is vacant and the work is not completed If the property is occupied or the work is complete before using all of these funds any unused mortgage payments will be paid down on the principal. Principal, interest, taxes and insurance for the hazard and monthly MIP payments can be included in the mortgage payment.

B5. Subtotal (B1-B4) B6. Architectural and Engineering Fees Blueprints and drawings for additions and structural changes that are needed can be prepared by outside professionals. The costs can be financed by the borrower

The consultant, will complete an inspection of the property to determine what work needs to be completed. The borrower will work with the consultant to incorporate what they want to do to the property. The consultant will complete the work write-up, in an acceptable format, and prepare the cost estimate so the after-improved appraisal can be completed and the borrower can shop for a contractor. Mileage can be charged when over 30 miles round trip at the IRS rate of 56 cents/mile.

Cost of RepairsFee < $7,500.00$ < $15,000.00$ <$30,000.00$ < $50,000.00$ < $75,000.00$ <$100,000.00$ > $100,000.00$1, NOTE: An additional $ can be charged by the Consultant, if the Borrower wishes to have them complete, a feasibility study, prior to submitting a sales contract, to a seller. Also, an additional fee of $25 can be charged for each additional unit.

B8. Permits Building permits can be financed and should be shown on this line. All permits must be in place prior to the first release. B9. Other Fees (explain in Remarks) Any fees that are necessary, in order to complete the reconstruction (i.e. Construction fees and structural certifications), can be financed and should be shown on this line. Explain what the fees are in the remark section.

B10.Subtotal (B5-B9) B11.Supplemental Origination Fee The supplemental origination fee, is calculated as 1½ % of the amount in B10, or $350 whichever is greater and should be shown on this line.

Discount points on the portion of the mortgage amount allocated to rehabilitation can be financed on a 203(k). The number of discount points, being financed on the rehabilitation costs cannot exceed those being charged on the total mortgage amount and is a portion of the total discount charged. The borrower may choose to finance the discount attributable to that rehab portion of the loan or pay it in cash.

Only those items in this subtotal and below can be released at the closing if there is a paid receipt or invoice to be paid (Total B6 thru B9 + B11 and B12)

 Total Rehabilitation Funds (B5 + B13- A6)  Streamlined (k) can not exceed $35,000.

C1Lesser of Sales Price (A1) or As-Is Value (A2) $______________ C2Total Rehabilitation Cost (B14) $______________ C3Lesser of sum of C1+C2 or 110% of after improved value (A4) __________________ C1 __________________ C1 +__________________ C2 =__________________ Total OR __________________ A4 (whichever is less) $______________

C4Maximum Mortgage Amount ____________________ C3 ____________________ C3 Required Adjustments +/-____________________ Required Adjustments +/-____________________ =___________________ Total X LTV factor 96.5% OR less ____________-______ allowable down payment (like HUD $100 down)$___________________

$________________________ A1 (Existing Debt) +$________________________ B14 (Rehabilitation Cost) +$________________________ A5 (Borr Paid CC & PPds) $________________________ Discount on total loan amt minus B12 financed discount on the rehabilitation -$________________________ FHA MIP refund The discount on the refinance, is calculated by multiplying the number of discount percentage points, by the whole loan amount. The discount on the repairs, has already been calculated and added to the loan, on Line B12. By subtracting the discount on repairs, from the total discount to be collected, an accurate cash discount amount is determined.

D2. Lesser of sum of "As-Is" Value (A2) + Rehabilitation Costs (B14) OR 110% After-Improved Value (A4) Note : Reminder that if the property is owned less than 1 year, you must use the lesser of the current "As Is Value" or the original cost of the property, plus documented renovation since acquisition. $_______________________ A2 (As-Is Value) $_______________________ A2 (As-Is Value) + $_______________________ B14 (Rehabilitation Costs) = $_______________________ OR OR $_______________________ A4 $_______________________ A4

D3. $____________________D2 x LTV Factor (97.75%) D4. Maximum base mortgage amount lesser of D1 or D3

Section E: Energy Efficiency Mortgage (EEM) Amount (C4 or D4) + A6 This is the final step, in the calculation of the mortgage amount, used ONLY when an energy efficiency mortgage, is being done in conjunction with the 203(k) rehabilitation loan. The calculation of mortgage amount completed in C4 or D4, is the mortgage amount, for which the Borrower must credit qualify. The amount calculated in E1, MAY exceed the statutory loan limit, but it cannot exceed 110% of the After Improved Value from A4.

Section: Remarks This area, is to be used to communicate additional information, on the details of the loan. This is the place, to convey the information about the specific items that have been paid in cash and by whom, so that if they remain unused, they can be given back to the donor. Only cash put up by the borrower, will be returned to the borrower! This is also the spot for the Underwriter to comment about reducing the mortgage amount or other changes to the calculated numbers.

The ‘Total Escrowed Funds’ box, in section F, should include the following: $_____________________________ B14 - Total Rehab Costs plus$_____________________________A6 - Energy Improvement Escrow Funds Plus$_____________________________ Cash Escrowed Items =$_____________________________ Total Repair Escrow Funds ML added two boxes to the remarks section, to state the interest rate, on the loan and the number of discount points, being charged, excluding the origination fee.

Problem #1 – Purchase transaction  Purchase is $100,000  After Improved Value is $200,000  Estimate of repairs $60,000  15% Contingency reserve will be required  Four inspections at $125  One title update $75  Architectural fee $1,000  The consultant fee $800  Building Permit will cost $250

Problem #2 – Refinance transaction  Borrowers have lived in property for 5 years and currently have a conventional loan.  Existing debt is $150,000  “As-Is” appraised Value is $180,000  The estimated “As-Completed” value of the property is $300,000  Closing costs are $6,750 and prepaids are $3,250  Estimates cost of repairs is $70,000  15% contingency reserve  Five inspections at $125 a piece and one title update at $75  The consultant fee $700  Building permit fees are $350