The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.

Slides:



Advertisements
Similar presentations
Proposed Amendments to Chapter 32, Article V, Solid Waste Management Ordinance Case No. PH-ORD-041 Presented by the Orange County Environmental Protection.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Oregon Cleanup Program Top Priorities. Goal: cleanup contaminated property so human health and the environment are protected and contaminated properties.
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
Introduction to Brownfields New Partners for Community Revitalization, Inc. June 29, 2009.
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
Reuse / Revitalization. What is Reuse / Revitalization? Restoring contaminated and potentially contaminated sites to productive use.
REVITALIZING CONTAMINATED LANDS: ADDRESSING LIABILITY CONCERNS Susan Kunst Boushell EPA’s Office of Site Remediation Enforcement March 25, 2015.
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
1 Indiana Department of Environmental Management Budget Presentation FY
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
CT DEP'S PERSPECTIVE ON SITE CHARACTERIZATION June 6, 2002 Presented by: Christine Lacas, Supervising Environmental Analyst Permitting, Enforcement & Remediation.
The Throwaway Society Chapter What is the difference between trash and litter? 2. How much trash do you think you produce each day? 3. How much.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
Brownfields Redevelopment in Indiana… Partnerships That Make A Difference! Indiana’s Brownfields Program Indy Brownfields Forum April 14, 2005 Andrea Robertson.
The Role of the Licensed Site Remediation Professional (LSRP) Paul Sakson, LSRP Paul D. Sakson Associates, Inc.
USING LAW FOR HEALTHY HOMES Priscilla Keith, JD Dana Reed Wise Health and Hospital Corporation of Marion county Indianapolis, Indiana.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Department of Public Works Land Management Division Land Management Division Engineering and Construction Engineering and Construction Road and Bridge.
Streamlining Development Permitting March 8, 2011.
Adem.alabama.gov Regulatory Update Gerald Hardy Chief ADEM Land Division Southern Section AWMA Conference August 10, 2007.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Web Resources Michael Gage New Jersey Department of Environmental Protection County Environmental and Waste Enforcement Special Investigations and Oversight.
Maryland Department of the Environment Harbor Point – Regulatory Overview Horacio Tablada, Director Land Management Administration November 14, 2013.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
Today’s Lecture Announcements Phase I Environmental Site Assessment
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
BROWNFIELDS: “Financial and Technical Support for Redevelopment” HAYWOOD COUNTY, NORTH CAROLINA BROWNFIELDS COALITION Presented to: TOWN OF WAYNESVILLE.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Former DuPont Barksdale Works Project Update July 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Enforcement Actions “How to Prepare a Case” Presented by: Leonard Grossberg, M.P.A., R.E.H.S. City of Vernon, LEA Sr. Environmental Health Specialist
1 Indiana Department of Environmental Management Budget Presentation FY
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Division of Waste Management Dexter R. Matthews, Director Mission: to prevent harmful releases of waste to the environment and clean up existing contamination.
FDIC Perspective on Environmental Risk Presented by: Gordon Stoner Legal Division Federal Deposit Insurance Corporation May 6, 2008.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
The Voluntary Investigation and Cleanup Program Investing in the environment and your economic future Gerald Stahnke, VIC Program Project Manager Minnesota.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
EPA Staying Flexible: Adaptive Management Approaches for Superfund Redevelopment An Enforcement Perspective Helena Healy Branch Chief Office of Site Remediation.
WELCOME OPEN HOUSE POSSIBLE ANNEXATION JULY 23, 2015 RECREATION CENTER AND NATATORIUM PEARLAND.
Copyright © 2009 Holland & Knight LLP All Rights Reserved Uniform Environmental Covenants Act November 18, 2009 Amy L. Edwards, Esq. (202) Brownfields.
An Introduction to the Voluntary Cleanup Program Texas Commission on Environmental Quality Environmental Trade Fair & Conference May 3, 2016 Gene Muller,
Estimating the Costs of Implementing Institutional Controls Brownfields 2009 New Orleans November 17, 2009 John Pendergrass.
Uniform Environmental Covenants Act Alphabet Soup: Making Sense of IC’s, LUC’s, AUL’s and UECA Kurt Strasser November 13, 2006.
Avoiding Future Shock: Long Term Solutions for Brownfields Ignacio Dayrit, City of Emeryville Brownfields 2004.
THE UNIFORM ENVIRONMENTAL COVENANTS ACT—THE EPA PERSPECTIVE BROWNFIELDS 2009 Michael A. Hendershot Senior Assistant Regional Counsel United States Environmental.
Institutional and Engineering Controls Implemented as Part of Remediation style Institutional and Engineering Controls Implemented as Part of Remediation.
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Wisconsin’s New Approach to Land Use Controls Presented by Mark F. Giesfeldt Wisconsin Department of Natural Resources.
Protecting Cultural Sites Shoshone-Bannock Tribes Environmental Waste Management Program By Zannita Armell.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
November 14, Still Afraid of CERCLA? Tools and Techniques for Managing Environmental Liability Concerns Susan Bromm, Director Office of Site Remediation.
Brownfields 101: Liability EPA Brownfields 2006 Conference November 12, 2006 Barbara Kessner Landau, Esq. Bernstein, Cushner & Kimmell, P.C.
Who I am Darren Bowling Phone: Michigan Department of Environmental Quality (DEQ) Remediation and Redevelopment.
Apalachee Regional Planning Council BROWNFIELDS 101 9/28/2017.
A TOUR OF FLORIDA’S BROWNFIELDS REDEVELOPMENT PROGRAM
Implementing RCRA Land Revitalization Measures
City Council Meeting August 27, 2018
Official Plan and Zoning By-law Amendment Application
Relationship between World Bank and Romanian EA requirements
Presentation transcript:

The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental Quality November 2009

Overview Rochester’s Permit Based IC Rochester’s Permit Based IC –Description & process –Functionality –System management issues Interface with NYSDEC Interface with NYSDEC Process & Cost Analysis Results Process & Cost Analysis Results

IC Categories Proprietary Controls Proprietary Controls –Easements and convenants Enforcement & Permitting with IC Enforcement & Permitting with IC –Consent orders Informational Devices Informational Devices –Deed notices and databases Governmental Controls Governmental Controls –Zoning and local permits

Creation of the City’s Environmental Institutional Control (IC) System 1940s – 1970s: City Operates a 230-Acre Municipal Solid Waste Landfill. Solid Waste Incinerated and Ash Buried. 1940s – 1970s: City Operates a 230-Acre Municipal Solid Waste Landfill. Solid Waste Incinerated and Ash Buried. 1970s-1980s: Landfill Closes and Redevelopment Begins Mostly as Industrial Park and a City High School Complex. 1970s-1980s: Landfill Closes and Redevelopment Begins Mostly as Industrial Park and a City High School Complex. Late 1980’s: New York State Department of Environmental Conservation (NYSDEC) Classifies Former Emerson Street Landfill As Hazardous Waste Site – Redevelopment Slows. Late 1980’s: New York State Department of Environmental Conservation (NYSDEC) Classifies Former Emerson Street Landfill As Hazardous Waste Site – Redevelopment Slows : City Performs Environmental Investigations & Interim Remedial Measures to Address Hazardous Waste : City Performs Environmental Investigations & Interim Remedial Measures to Address Hazardous Waste : City Petitions NYSDEC for removal of >90% of Former Emerson Street Landfill from Hazardous Waste Registry : City Petitions NYSDEC for removal of >90% of Former Emerson Street Landfill from Hazardous Waste Registry : NYSDEC Delisting Action Conditioned – City Must Implement Developmental Control System : NYSDEC Delisting Action Conditioned – City Must Implement Developmental Control System

1970 Aerial Photograph of Former Emerson Street Landfill Emerson St. Canal Active Landfilling

Emerson St. Canal 2001 Aerial Photograph of Former Emerson Street Landfill

Primary Purpose of City’s Environmental IC System Develop Written Environmental Management Plan (EMP) to Alert Owners, Prospective Purchasers, Designers, and Contractors of Existing Environmental (& Geotechnical) Site Conditions. Develop Written Environmental Management Plan (EMP) to Alert Owners, Prospective Purchasers, Designers, and Contractors of Existing Environmental (& Geotechnical) Site Conditions. Protect Workers and the Health and Safety of Occupants. Protect Workers and the Health and Safety of Occupants. Ensure that new Facilities Mitigate Environmental Conditions in their Design and Construction (e.g. sub- slab vapor mitigation system). Ensure that new Facilities Mitigate Environmental Conditions in their Design and Construction (e.g. sub- slab vapor mitigation system). Ensure Proper Characterization and Management of Regulated Solid Waste and other Site Contaminants. Ensure Proper Characterization and Management of Regulated Solid Waste and other Site Contaminants.

Fundamental IC Requirement: Parcels with ICs

Key Features of IC System Use Electronic Red Flags to Link IC’s to the City’s Permit Application Process. Use Electronic Red Flags to Link IC’s to the City’s Permit Application Process. Rationale: Rationale: –City Permits are Required for Most Intrusive Activities. –IC’s are Highly Visible to both City staff and Applicant at the Initial Stages of the Project. City Permit Application Process Stops until City DEQ (or NYSDEC) Determines If Permit Activities Trigger the IC. City Permit Application Process Stops until City DEQ (or NYSDEC) Determines If Permit Activities Trigger the IC.

City of Rochester Environmental Institutional Control Process

IC Examples

IC Flag

Permit Event List

Permit Detail Screen Permit Description

City & Applicant Signatures IC Permit Conditions

City IC System Summary City IC System in Place since 1996 Approximately 125 Parcels Flagged with ICs Permit-Based Process Results in Good Documentation and timely City Response Permit-Based ICs: Code Enforceable City DEQ In-Depth Technical Knowledge of Site Conditions City DEQ Uses Discretion in Referring Permit Applicant to Regulatory Agencies (City Managed Sites)

Interface with NYSDEC remedial programs Established IC for City managed sites Established IC for City managed sites Accepted by the NYSDEC, Monroe County Health Department, and some lenders Accepted by the NYSDEC, Monroe County Health Department, and some lenders 2003 Statory Mandate for Local Municipality Tracking of NYSDEC Brownfield Cleanup Program Environmental Easements Statory Mandate for Local Municipality Tracking of NYSDEC Brownfield Cleanup Program Environmental Easements. Recent NYSDEC Request for ICs for Petroleum Spill Sites. Recent NYSDEC Request for ICs for Petroleum Spill Sites.

City IC System Reviews 2004 EPA BF grant supported IC system review (QC and effectiveness) 2004 EPA BF grant supported IC system review (QC and effectiveness) 2005 ICMA/EPA Cost Tracking Project 2005 ICMA/EPA Cost Tracking Project Basic Categories of City IC costs: Basic Categories of City IC costs: –Guidance document/site management plan preparation, approval, & updates –Activity use limitation preparation, request, & “flag” set up –Permit application processing & referral –Site reviews & support by technical staff

2004 IC System Review Issues Flags can be Ignored or Not Observed – Make Highly Visible Flags can be Ignored or Not Observed – Make Highly Visible Flags are Erroneous Flags are Erroneous Flags are “Missing” Flags are “Missing” City Staff Training City Staff Training Real Property Changes - Subdivision of Parcel with IC Real Property Changes - Subdivision of Parcel with IC

IC Quality Control Measures Permit Activity Report Permit Activity Report Parcel Status Report Parcel Status Report Review of Subdivision Changes Review of Subdivision Changes Real-Time GIS Shapefile of Current ICs Real-Time GIS Shapefile of Current ICs Staff Training Staff Training

2005 IC City Cost Analysis –Based on an IC subset of 110 parcels in a population of 66,000 parcels –Three month period –City managed cleanup sites only –Limited to City staff transactions –Excludes permit applicant’s costs to meet IC conditions (Eg. HASP, SMP etc.)

Cost Analysis Summary Cost CategoryQuarterly CostAnnual Estimate Consultant Costs to prepare IC site EMP $3,000-$5,000 per site Transaction Staff Costs$2,000 $8,000 - $10,000 Staff Training $800 - $1,000 Staff Field Inspections$100 $500 - $5,000 Staff Quality Control$100 $500 - $1,000 Staff Total $9,800 - $17,000

Cost Factors & Projections Very limited field inspections during sample period Very limited field inspections during sample period 2005 data 2005 data Experienced City staff familiar with IC process and sites Experienced City staff familiar with IC process and sites NYSDEC site additions (30-50 per year) are expected to increase City costs by the current amount every 3 to 4 years ($15k-$30k-$45k etc.) NYSDEC site additions (30-50 per year) are expected to increase City costs by the current amount every 3 to 4 years ($15k-$30k-$45k etc.)