Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Introduction to SITE PLANNING
Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Introduction/Site Analysis Branford Landfill – Sun Valley Branford Landfill – Sun Valley Abandoned and idle for 40 years Abandoned and idle for 40 years.
Introduction Who we are - Team Intro Riverwalk part of overall revitalization of downtown area.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Master Plan Public Input Meeting April 23 rd 2015 Open House: 4:30 – 5:30 PM Presentation: 5:30 – 6:00 PM Open Forum: 6:00 – 7:00 PM Presented.
Cardener River Corridor Guiding Principles Diversity of Economic Development Scale of Growth –Incentives for Infill and Re-use –Appropriate to existing.
CHARLESTON GAILLARD CENTER ARTS PRECINCT ARTS PRECINCT … designed to bring the arts into the public realm by creating a civic destination for.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
KielRanch. KielRanch Concepts: January Public Meeting.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY, PETALUMA, CA North Bay Watershed Association December 7, 2007.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA Academic Senate 19 JANUARY 2011.
Becoming Part of the Solution... …by committing to preserve the beauty that surrounds us, and to heal the planet for future generations.
Habitat Summer 2010 Workshop in Biology and Multimedia for High School Teachers.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Green Building and Sustainable Architecture
Cydney McGlothlin, Architect, University of Florida, Gainesville FL
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
USDA Sustainable Landscape Partnership U.S. Forest Service Natural Resources Conservation Service Agricultural Research Service Agriculture Marketing Service.
Dr. Lou Mills November 15,  Quantitatively or Qualitatively?  LEEDS, BREEM, ASLA Sites Sustainability Initiative, Other techniques?  What is.
GreenLITES Project Design Certification Program Recognizing Outstanding Leadership In Transportation and Environmental Sustainability AASHTO Meeting October.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
Linda K. McCarthy, Executive Director Missoula Downtown Association Missoula, Montana
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Land Use Study for the Community of Winchester July 9, 2012.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
Going Green. Green Building and Sustainable Architecture What is Sustainability? Sustainable Design Sustainable Building Life Cycle Pre-Building Phase.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
City of Auburn Streetscape: A Complete Street Presented by: Ed Armstrong, RLA.
City of Palm Coast EAR Public Input Process Update Prepared for the Palm Coast City Council By The FCRC Consensus Center November 24, 2009 Update Prepared.
Planning for the Waller Creek District Oklahoma City Chamber of Commerce Delegation April 4, 2013.
Sustainability is Good for Business HOTEL MANAGEMENT Rebecca Keens – Student Volunteer.
TOWN OF DAVIE TOWN OF DAVIE Agricultural & Environmental Advisory Committee Committee Goal Setting & Priorities.
Sustainability is Good for Business PRESENTATION TO HOTEL MANAGEMENT Sustainable Hotel Gardens.
Sample Codes of Ethics in Adventure Tourism
Complete Streets Plan Philadelphia Vision Zero Presented by Raj Mohabeer PLA, ASLA, AICP, LEED®AP December 3, 2015 Detroit’s.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Fitzgerald Marine Reserve CA Coastal Trail California Coastal Commission May 12, 2011.
LANDSCAPE ARCHITECTURE. Are you interested in nature and preserving Mother Earth?
Planning Commission Study Session: Preferred Plan July 23, 2015.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
Green Building and Sustainable Architecture
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
1 The Future of Organics Management in Palo Alto City of Palo Alto Public Works Operations March 8, 2010.
Assign Priority Calendar Category Community Projects Staff Projects Update/Establishes Polices/Ordinances Strategic Plan Goal? Yes – Assign Goal No – Not.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
California Health Care Facility, Folsom
Highland Park Country Club
2006 Facilities Master Plan Update Cañada College
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
Water Reclamation Plant Feasibility Study Update May 28, 2014
Elaborating The Committee Charter:
ROOSEVELT CITY GENERAL PLAN 2010
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
Presentation transcript:

Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 1

PROJECT TEAM Paul J. Schneider, P.E. Principal-In-Charge, QC SIEGFRIED Robert Norbutas, ASLA Project Manager, Landscape Architect SIEGFRIED Julie Weiss Project Manager, RWQCP CITY OF PALO ALTO Phil Bobel Director, RWQCP CITY OF PALO ALTO 2 Francesca Demgen Habitat Specialist URS Allison Chan Associate ESA Environmental Erik Zigas Director ESA Enviornmental

INTRODUCTION OF SIEGFRIED TEAM ABOUT US Siegfried has been in business for over 55 years We provide a multidisciplinary approach to all of our projects Our design teams have previous experience with RWQCP projects We currently have multiple projects for the City of Palo Alto OUR SERVICES Landscape Architecture Civil Engineering Structural Engineering Land Surveying Master Planning TEAM CAPABILITIES ESA (Environmental/Tree Survey) URS (Biologist/Native Species Specialist) 3

TEAM PROJECTS PROJECTS Eleanor Pardee Park El Camino Park Stockton RWQCP EBMUD 39 th Street Reservoir Stockton EBMUD Bike Trail ESA (Environmental/Tree Survey) URS (Biologist/Native Species Specialist) 4

ROLES/DECISION MAKING PROCESS 5

PROJECT HISTORY, GOALS, DRIVERS HISTORY 1970 RWQCP Construction required screening Baylands Master Plan (’78, ’87, ’88, ’07, ’08) Revisions to planting and irrigation (’69, ’78, ’86) GOALS Meet Baylands Master Plan requirements Screening of RWQCP that is beautiful and productive RWQCP becomes a demonstration site for Bay-Friendly certified and sustainable designs Satisfy Advisory Committee wishes, needs, and concerns Create a current tree and irrigation inventory Create a coherent overall landscape plan Beautification/Sustainability Create functional, aesthetic design for the Recycling Center DRIVERS Baylands Master Plan Need for re-vegetation Public commitment Sustainability and public education of recycled water uses Enhance the local ecosystem 6

OVERALL PROJECT TIMELINE Conceptual RWQCP Landscaping Plan approved by City Council by October, Development of final plan commences. Approximately four Advisory Committee meetings and updates in-between as necessary RWQCP Conceptual Landscaping plan process respects need to potentially adjust final plan to accommodate Recycling Center design and potential Compost Facility project. 7

RECYCLING CENTER TIMELINE 10/10 Schematic Design and Public Input CEQA Process Final Design Bidding/Award Construction 12/10 5/11 1/11 6/11 4/11 11/11 8

INVENTORY PROGRESS TASK PROGRESS TASK 1 Tree and Biological Survey GPS Locations Identification, Condition, and Size Generation of Documents TASK 2 Irrigation Survey Analyzed Historical Irrigation Plans Performed Field Investigations Developing Narrative and Analysis of Existing Systems Generation of Documents 9

PROJECT DESIGN AREAS 10

GENERAL LANDSCAPE GOALS Beautification and meeting Bay- friendly landscape requirements Demonstrate sustainable designs and utilize plants that require low water Create a Baylands atmosphere within the RWQCP Centralize the irrigation control Enhanced ecosystem CONCERNS Having expanses of high water use lawn areas Neglecting the planting beds and introducing invasive species Aspirations/Needs/Concerns 11

RECYCLING CENTER GOALS To relocate the Recycling Center next to the RWQCP We will ensure proper perimeter fencing and security Create an efficient layout Have sensitivity to existing mature trees Create a “Baylands” bike path Introduce public art into the plan Create a provision for a future through road CONCERNS Having an industrial land plan with excessive paving Screen visibility Aspirations/Needs/Concerns 12

PERIMETER LANDSCAPE SCREENING GOALS Create facility screening Integrate the screening into the adjacent Baylands Having considerations for public art in the design Creating pathway connections Ensuring low maintenance designs Enhancing the ecosystem CONCERNS Using invasive species Creating short-term solutions Having high maintenance solutions Aspirations/Needs/Concerns 13

MOAT AND DEMONSTRATION AREAS GOALS Designing Bay friendly and sustainable demonstration areas for educational opportunities Having an inviting atmosphere and with an added water features Creating defined and safe gathering spaces and pedestrian connections with increased ease of wayfinding Making a “clean water” moat CONCERNS Eliminating the “green” water Installing high water use plants Unsafe connections and putting the public in the wrong place Having a high maintenance design Aspirations/Needs/Concerns 14

RECYCLED WATER TANK GOALS Design a Bay friendly and sustainable demonstration area Having a recycled water educational area Creating a pondless water feature Defining the public and employee gathering spaces Increase the ease of wayfinding CONCERNS Having a negative view upon entry Having unused space at the recycled water tank Having an unclear definition of the public spaces Aspirations/Needs/Concerns 15

HABITAT CORRIDOR GOALS Beautification and screening Re-introducing native plants Encouraging animals and birds to return to the habitat corridor Creating a landscape connection to the adjacent Renzel Marsh Having proper irrigation control CONCERNS Introducing non-native and invasive plant materials Public access paths Aspirations/Needs/Concerns 16

QUESTIONS AND CONCLUSION Landscape Design Stakeholder Meeting Palo Alto Regional Water Quality Control Plant 17