Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,

Slides:



Advertisements
Similar presentations
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Role of Management and Technical Coordination
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HL-LHC: scope, structure and management HL-LHC internal kick-off day 15 April 2011.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
WP10.3 Crab Cavities Overview EUCARD SRF Annual Review Peter McIntosh (STFC, ASTeC, Daresbury Laboratory) 4 – 5 May 2011, Orsay.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Compact Crab Cavity Status E. Jensen for WP4 R. Appleby, T. Baer, J. Barranco, I. Ben-Zvi, G. Burt, R. Calaga, E. Ciapala, S. Da Silva, J. Delayen, L.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
FP7: EuCARD after a year of preparation… A.Jeremie.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 July 2010.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
WP High Beta Cavities Delivery
Plans towards CC in the LHC a US – centric perspective
Review of options for crab cavities in LHC:
WP5 Elliptical cavities
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Crab Cavities Contribution from the U.S.
Uppsala Commitment to ESS and FREIA Planning
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Design Fabrication and Processing Group H. Padamsee
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
CLIC-ILC BDS & MDI work.
ESS RF Development at Uppsala University
Presentation transcript:

Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010, SLAC. 1 LARP CM15 - HL-LHC WP4 HL-LHC WP4-Crab Cavity

Crab Cavities for the HL-LHC CM14 conclusions HL-LHC and Crab Cavities FP7 HL-LHC Design Study WP-4 Planning, Tasks, Deliverables and Milestones Conclusions 2 LARP CM15 - HL-LHC WP4

CM14 Conclusions - Fermilab April LARP CM15 - HL-LHC WP4

LHC and the HL-LHC Luminosity Upgrade MOTIVATION: LHC has now reached nearly 2.0x10 32 cm -2 s -1, (400 bunches on 400) exceeding the goal of cm -2 s -1 by end 2010, and anticipating a total integrated luminosity of > 1 fb -1 by end of 2011 (50 pb -1 achieved to date) Push towards 7 TeV after 2012 shutdown and consolidation After reaching nominal parameters the challenge is to aggressively pursue the experimental goal of 3000 fb -1. This can only be achieved with an LHC upgrade HL-LHC that can reach beyond the ultimate intensities, with  * well below the nominal and having a means to do luminosity leveling through the coast. The IR upgrade will use Nb 3 Sn magnets at Tesla,  * down towards 22 cm. => Compensation of beam crossing angle and luminosity leveling essential. Crab Cavities are the preferred choice… 4 LARP CM15 - HL-LHC WP4

LHC Luminosity Upgrade – HL-LHC HL-LHC is one of CERN’s major projects for the future, along with: LHC and Injector consolidation, Injector intensity upgrade (LIU) and Future linear collider. HL-LHC Project leader Lucio Rossi / Oliver Bruning Overall HL-LHC project planning/costing in progress – FP7 HL-LHC Proposal CERN BE-RF takes responsibility for CC activities, a major project in itself. (E. Ciapala/E. Jensen) A very large part of the CC effort - study, design and technical, already comes and needs to continue come from outside partners.  Strong participation already from US-LARP, Cockroft Institute, and others.. 5 LARP CM15 - HL-LHC WP4

Crab Cavities for the HL-LHC Overall CC project document outlining the strategy, the planning, milestones, breakdown of activities and the costing is in preparation. Mission Statements on HL-LHC and on Crab Cavities have been sent to US DoE An FP7 HL-LHC Design Study Proposal (Mid 2011 to Mid 2015) has been sent to Brussels – This an initial draft proposal. Crab Cavity is Work Package 4 in the overall project Discussions with partners ongoing 6 LARP CM15 - HL-LHC WP4

Strategy & Planning for Crab Cavities Main Goal : Compact Crab Cavities for LHC Local Scheme (Following CC09 workshop recommendation) Four Stages: Complete conceptual designs of the main candidates Down-select to at least two designs, with full spec. and mechanical drawings of the cavities. Conceptual designs for tuner and He tank, the SOM,HOM and LOM coupler and the cryostat. Hardware prototyping and test on above, tooling, construction of prototype bare cavities prototypes, surface treatments and tests to confirm gradient and performance Do full technical design of the complete CC cryomodule 7 LARP CM15 - HL-LHC WP4

Back-up strategy for Crab Cavities Retain a conventional cavity option in the unlikely event of major unforeseen ’show stopper’ with all compacts… Would entail significant civil engineering costs and use of dogleg sections in the IRs, but this would still be acceptable, in view of the importance gaining back luminosity from the crossing angle. A straightforward conventional cavity installation in IR 4 as a global scheme would serve as an alternate option in the worst case. To this end, for the TDR, a full mechanical design of the elliptical cavity, its accessories and the elliptical cavity cryostat is also envisaged. 8 LARP CM15 - HL-LHC WP4

LHC and Luminosity Upgrade Major shutdowns 2016 and 2020/21 (preparation & actual installation) 9 LARP CM15 - HL-LHC WP4

Crab Cavities for HL-LHC – Planning Overall schedule of the crab cavity project synchronized with the expected LHC operation schedule and the HL-LHC project proposal. 10 LARP CM15 - HL-LHC WP4 v v v v v v v

Compact CC Validation LARP CM15 - HL-LHC WP411 Selected for Eu part of DS (preliminary) v For PDR 2013

Compact CC Technical Design LARP CM15 - HL-LHC WP412 Selected for DS (preliminary) v For TDR 2015

Elliptical CC Technical Design LARP CM15 - HL-LHC WP413 Selected for FP7 DS (preliminary) v For TDR 2015

WP4: Prelim. Tasks List (2 nd draft) LARP CM15 - HL-LHC WP414 Task 4.1: Coordination and Communication Coordination and scheduling of the WP tasks Monitoring the work, informing the project management and participants within the JRA WP budget follow-up CERN, LARP, ULANC Task 4.2: Support studies Tunnel preparation SPS and LHC Local IR layout and spatial integration Effect of phase noise, LLRF system conceptual design RF power system specification Operational aspects (how to commission/make invisible) Interlocks and fast Feedback CERN, KEK, LARP Task 4.3: Compact Crab Cavity design Complete cavity and cryomodule specifications Design optimisation for novel schemes Conceptual design of SOM, HOM and LOM couplers Conceptual design of helium tank and cryostat Multipacting simulations on cavity & couplers FEM simulations: mechanical & thermal aspects Initial down-selection of the CC options Completion of a full technical design on the initial down-selected options, with mechanical drawings and specification. Design of tooling, dies and cavity fabrication equipment ULANC, LARP, CERN, JLAB

WP4: Prelim Tasks List (2 nd draft) LARP CM15 - HL-LHC WP415 Task 4.4: Elliptical Crab Cavity Technical design Coupler development and testing Tuner design and mock up on copper models Study of mechanical effects: resonances, microphonics. Cavity performance with couplers and horizontal cryostat Performance difference between 2 K & 4 K Cryostat and He Tank Design Complete the full technical design CERN, CEA, CNRS, KEK Task 4.5: Compact Crab Cavity Prototyping and Test Procurement /fabrication of tooling, dies and equipment. Construction of models to refine manufacturing techniques and tooling. Fabrication of prototype niobium cavity Cleaning and electro-polishing on the bare niobium cavity. (i.e. no couplers, antennas or other accessories), including cavity surface inspection. Development and procurement of all test equipment and instrumentation. Low power tests and measurements on the bare cavity in a test cryostat to test for compliance with design gradient and cavity performance specs. Make the final CC design down-selection CERN, CEA, CNRS, ULANC, STFC, LARP

Deliverables and Milestones LARP CM15 - HL-LHC WP416 Deliverables of tasks Description/titleNature Delivery month 1 Valid proposal on handling machine protection issues 6 2 Valid proposal on ensuring an acceptable minimum of perturbation to normal LHC operation 18 3 Specification documents on conceptual design of High Power and Low Level RF systems Integration drawings for SPS and LHC CC installations 5 Conceptual design of SOM, HOM and LOM couplers 24 6 Conceptual design of He tank and cryostat for CCs 24 7 Preliminary Design Report (PDR) 28 8 Technical design of a complete elliptical cavity in its cryostat with ancillaries 40 9 Technical Design Report (TDR) TDR48 MilestoneDescription/titleNatureDelivery mo (appr.)Comment 1Machine protection concerns satisfied6 2 Operating scenario during LHC ramping specified 12 3CC Technology validation24 For PDR (W28 - Nov 2013) 4 Completion of technical design of elliptical cavity in its cryostat 40 For TDR (W48 - Mid 2015) 5Decision – Local or Global40 For TDR (W48 - Mid 2015) For Eu proposal deliverables will have to be revised! (# activities, cost, outside scope..)

First estimate on man-power: LARP CM15 - HL-LHC WP417 Work package number WP4Start date or starting event:M1 Work Package title Crab Cavity Design Activity typeRTD Participant idCERNULANCCEACNRSSTFCBNL FNA L JLAB Person-months per beneficiary: Participant idLBNLSLACKEK Person-months per beneficiary: will have to be revised! Show Excel: “Crab Cavities for LHC spending profile DS_Oct20.xlsx”.

EuCARD HL-LHC Design Study Proposal Potential Partners 18 LARP CM15 - HL-LHC WP4 US LARP Collaboration

Looking Beyond - Production of CCs  A substantial program involving: Completion of specifications for cavity production, couplers, cryostats and other components, Launching series production of cavities, couplers and other cavity components, Launching series production of cryostats, Launching series production of RF and power equipment, Successful low power testing of series bare cavities, Completion of clean room assembly of series cavities and their ancillaries in their cryostats, Successful power testing of the completed series cryomodules in the dedicated test stand, Test in SPS of a completed CC cryomodule. 19 LARP CM15 - HL-LHC WP4 Other systems: RF SYSTEM – RF POWER, LLRF CRYOGENICS CONTROLS

Conclusions & Outlook – LHC crab cavities Main objective for LHC is full local scheme with compact cavities ‘Conventional’ SC Cavity 800 MHz is retained as an option. Crab Cavity work firmly implanted in the HL-LHC project Project breakdown, planning and costing in preparation CCs are in the EuCARD HL-LHC Design Proposal as WP 4 DS Scope to include prototyping of novel CCs Resources to be allocated by CERN, EU and partners, hopefully including LARP Request for DoE support initiated Resources now to be negotiated in US context Feedback from US partners needed in defining specific contributions and support for the different tasks, within LARP. Working together to get DoE support for US colleagues in hardware prototyping and beyond the design stage proper. 20 LARP CM15 - HL-LHC WP4

Thanks for your attention CC presentations at CM15 Crab Status & Plans - Rama Calaga HWSR Cavity Development - Z enghai Li Crab SPS Studies – Hyung Jin KIM NOTE: LHC Crab Cavity workshop CC10 CERN, December LARP CM15 - HL-LHC WP4