EXPERIENCE WITH INTRODUCING EED RULES FOR PUBLIC PROCUREMENT Irena Križ Šelendić Head of Service Ministry of Construction and Physical Planning Croatia.

Slides:



Advertisements
Similar presentations
Voluntary instruments Daniel Hajek 1.Environmental labelling 2.EMAS 3.Cleaner productions 4.Green public procurement 5.Voluntary agreements Voluntary.
Advertisements

Implementing the SET-plan proposed Energy Efficiency Directive The proposed Directive establishes a common framework for promoting energy efficiency in.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
Integrated Municipal Energy Services Committee EESE Board Statute: Encourage Municipalities to increase investments in energy efficiency and sustainable.
Massimiliano Di Pace1 EU TRADE POLICY Eu provides also initiatives, financing and services to support Eu companies’ efforts for internationalisation The.
Dr. techn. Bedri Dragusha CEO of KEEA The Role of Energy Efficiency in Sustainable Development.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
ENERGY EFFICIENCY IN CROATIA St. Pölten, December 7, 2007 THE STATE ENERGY EFFICIENCY PROGRAM AND THE MARKET DEVELOPMENT FOR GREEN BUILDING IN CROATIA.
Report about controlling activity and its results in the programme in 2013 TOP Monitoring Committee Meeting
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Public Procurement Exchange Platform Efficient implementation of Procurement - Centralized Purchasing Mr. Safet Hoxha, President of PPRC Mr. Ilaz Duli,
REGIONAL POLICY EUROPEAN COMMISSION The EU Recovery Plan and the proposal amending the European Regional Development Fund Regulation.
Case Jyväskylä Life cycle procurement: Sharing the risks and savings SCI Network meeting, Malmö Sanna Ahvenharju, Gaia Consulting Oy Based on.
© European Bank for Reconstruction and Development 2011 | EBRD Financing for Sustainable Energy Investments Remon Zakaria Business Development.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Supervision and Oversight in Procurement as a Tool of Efficient Project Implementation.
PUBLIC SECTOR FINANCIAL CONTROL OF THE REPUBLIC OF LITHUANIA By Ms Daina Vaivadienė Chief Specialist of the Internal Audit and Financial Control Methodology.
FIDIC MDB Conference Brussels June 2012 © European Bank for Reconstruction and Development 2010 | EBRD Procurement considerations when financing.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
PUBLIC PRIVATE PARTNERSHIP – CROATIAN EXPERIENCE Kamilo Vrana, B.Sc.E.E. Managing Director Beograd, November 18, 2010.
Rahandusministeerium Project Preparation Fund for Structural Funds Peter Gornischeff Ministry of Finance of Estonia.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
SEMINAR on the EEA Financial Mechanism THE EUROPEAN COMMISSION DIRECTORATE- GENERAL REGIONAL POLICY Brussels 13 June 2005 Audit of the Cohesion Fund Lena.
Best Practices on Building Energy Efficiency 49 th EWG and Associated Meetings Gyeongju, Republic of Korea 24 th Jun 2015 Kumareshan Energy Commission,
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Public Private Partnership + EU Funds in Poland general overview and the future outlook.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
Environmental Investment Centre (EIC) Rävala pst 8, TALLINN Tel: Fax:
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
A new impetus for Europe's energy efficiency policy Paul Hodson Head of Unit DG Energy, European Commission 09/10/2012.
Ministry of Economy, Energy and Tourism 1 OP Competitiveness Progress of Implementation 2010.
Role of the Fund in supporting ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES PROJECTS in Croatia - general informations REPUBLIC OF CROATIA ENVIRONMENTAL.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Designing the Green Economy: Support & Constraints under International Trade and Investment Law.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects.
Green Investment Scheme in Russia: Perspectives and Constraints Julia Dobrolyubova Expert on Climate Change and Kyoto Protocol REC/CEU GIS Workshop
Social inclusion of excluded young people and prevention of re-offending behavior
TEN-T Executive Agency and Project Management Anna LIVIERATOU-TOLL TEN-T Executive Agency Senior Programme and Policy Coordinator European Economic and.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
Energy Efficiency Act from 2004 Provides legal base and legal obligations for certain parties for energy efficiency improvements - Buildings with gross.
European Investment Bank – JESSICA and Investment Funds Energy Efficiency in Buildings: New financial instruments Frank Lee Head of Holding Funds and Advisory,
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
CROATIAN EXPERIENCE IN OPERATING AN ENERGY EFFICIENCY FUND under the regime of the EED Article 7 Vesna Bukarica, Ph.D. Head of Energy Efficiency Sector.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
The Central purchasing in Bulgaria: Current status and prospective TAIEX Seminar 9-10 December 2015 Ivanina Beleva Director of the Central Purchasing Body.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Energy Efficiency in Public and Private Sector Serbia and Western Balkans Belgrade, 15 December 2015.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Твининг пројекат Европске Уније Успостављање механизма за спровођење ММR *** Twinning project Establishment of a mechanism for implementation of MMR Пројекат.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Renewable energy support schemes in the Republic of Moldova
Energy Audit for SMEs Ing. Domenico Santino
Energy Efficiency Opportunities for Manufacturing Industries
PRESENTATION OF MONTENEGRO
ENERGY EFFICIENCY IN BUILDINGS SECTOR IN CROATIA
EPC CONCEPTS and BUSINESS CASES
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Training programs in IngREes project
ISO International Energy Management System
Financing Sustainable Energy in Ukraine: EBRD Experience
On the procedures for the award of concessions for the ports of nautical tourism in the Republic of Croatia – de lege lata et de lege ferenda Dr. Nina.
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
MINISTRY OF ECONOMY AND FINANCE
Pedro Cruz Yábar Brussels, 21st June 2016
The meeting of INTOSAI Working GROUP on Public Procurement Audit July 4-5 Lisbon Abstract of State Audit Bureau of Kuwait in conducting the public procurement.
Synergies between NDCs & SDGs; Integration into National Planning
What has worked and what needs to be improved?
Presentation transcript:

EXPERIENCE WITH INTRODUCING EED RULES FOR PUBLIC PROCUREMENT Irena Križ Šelendić Head of Service Ministry of Construction and Physical Planning Croatia Kiev 19 May 2016

ARTICLE 6 EED PURCHASING BY PUBLIC BODIES MS shall ensure that central governments and other public bodies at regional and local levels, purchase only products, services and buildings with high energy-efficiency performance insofar as that is consistent with cost-effectiveness, economical feasibility, wider sustainability and technical suitability MS shall encourage public bodies, when tendering service contracts with significant energy content, to assess the possibility of concluding long- term energy performance contracts that provide long-term energy savings

PUBLIC PROCUREMENT ACT Pursuant to Article 82 of the Public Procurement Act, the criteria for bid selection in the public procurement procedure are: 1. THE ECONOMICALLY MOST FAVOURABLE BID or 2.THE LOWEST PRICE If the economically most advantageous tender is selected the criteria may be: quality |price |technical merit | cost-effectiveness | environmental characteristics |running costs | aesthetic and functional characteristics |etc.

PROGRAMME OF ENERGY RENOVATION OF PUBLIC SECTOR BUILDINGS 2014 – 2015 The Government of the Republic of Croatia adopted on 31 October 2013 the Programme of energy renovation of public sector buildings for the period 2014 – 2015 Program goals: →To contract and completely renovate 200 public sector buildings – approx m 2 of heated floor area →To reduce energy consumption in refurbished buildings for % (ca. 150 kWh/m 2 per year) →To reduce CO 2 emission by approx t per year →To mobilise investments amounting to approx. 400 mil. kn (≈ 53. mil € ) →To boost energy services market (ESCo)

PROGRAMME OF ENERGY RENOVATION OF PUBLIC SECTOR BUILDINGS 2014 – 2015 Program goals: →Fulfillment of requirements in accordance with the Article 5 of EED to renovate 3% of total floor area (heated and/or cooled) of buildings owned and used by central government each year Photo by Marko Vrdoljak. This photo is the property of The Zagreb Tourist Board.

PARTICIPANTS IN THE PROGRAMME Adopted Program 6 Croatian Government Ministry of Construction and Physical Planning Developed Program and monitors implementation Agency for Transactions and Mediation in Immovable Properties Implements the Programme and signs contracts on energy performance Environmental Protection and Energy Efficiency Fund Provides funds for co-financing Energy Service Client (ESC) Building owner/user submits application of the building for the Programme Energy Service Provider (ESP) Carries out energy renovation LEGAL FRAMEWORK : Energy Efficiency Act │Building Act │ Public Procurement Act │Regulation on Contracting and Implementation Energy Service in the Public Sector

BASIC SETTINGS AND CHARACTERISTICS OF THE PROGRAM ESC orders ESP provides the energy service ESP commits to achieve verifiable savings in energy and water by implementing EE measures Energy efficiency measures imply: I.Preparation of project documentation II.Energy renovation of the building (construction works, incorporation of equipment and materials, ) III.Monitoring and investment maintenance of all building elements and incorporated equipment that underwent energy renovation Programme promotes integreted renovation concept that includes upgrades to the buildings envelope, heating /cooling system, water heating system, ventilation, lighting and water supply. Building construction measures that address the building envelope are mandatory !

BASIC SETTINGS AND CHARACTERISTICS OF THE PROGRAMME ESP invests and takes technical and economic risk so ESC does not have any additional costs ESC commits to ensure payment of the energy service fee to ESP during the contract period Payment of services is based on verifiable savings Energy savings are proven by the Design The service fee shall not exceed the savings!

PROGRAMME STEPS 1.Application for the building – ESC submits to Agency the Form for owners containing basic data on the building and the Approval-consent to Agency for carrying out renovation 2.Energy audit - Agency conducts preliminary analysis of the fulfilment of the requirements under the Programme. In case that certification has not been carried out, Agency orders the energy audit and EC and / or project assignment 3.Cost effectiveness analysis - Agency compares data from the energy audit with data from EMS (Energy Management Information System), analyses the cost effectiveness and passes a decision on initiating the public procurement procedure 4. Public procurement - Agency establishes the bidding conditions, develops the bidding documentation, conducts a public procurement and chooses the best bid according to the criterion of Economically most favourable bid

CHOOSING THE ECONOMICALLY MOST FAVOURABLE BID BIDS SCORING No.SCORING CRITERION MAXIMUM NUMBER OF POINTS 1 Decrease in energy consumption [%]40 2 Net present value of energy service fee - NPV of fee [kn] 20 3 Portion of renewable energy sources [%]15 4 Profitability of investments [kn / kWh]15 5 Automatization of energy consumption measurement 5 6 Price of the bid [kn]5

PROGRAMME STEPS 5.Contracting - ESC, ESP and Agency conclude an EPC. The duration of the contract is up to 14 years 6.Design - ESP must prepare the project documentation (the Design) that has to encompass and elaborate all the measures aimed at achieving savings, and prove the achievement of all values from the bid 7.Project Verification - ESP submits the Design to the Expert Commission appointed by the Agency. The Expert Commission verifies Design compliance with regulations of the Republic of Croatia and verify whether the Design proves the values from the bid 8.Financing – ESP may use loans of commercial banks or of CBRD

PROGRAMME STEPS 9.Co-financing of the Programme - ECO found co-finance with grant funds 40% of eligible costs to the ESC (in line with ECO fund rules) 10.Renovation – ESP is required to carry out energy renovation on building in compliance with verified design. Agency supervises Works through the expert supervision selected by a public procurement 11.Takeover of works – completion of Renovation - upon completion of energy renovatio the final report is signed by the supervising engineer and the new EC is issued. ESC, ESP and Agency sign a Protocol on takeover of works. and define the end date of renovation works 12.Monitoring and control of savings– during the entire period of EPC, ESP shall carry out measures of monitoring and control of savings (training of users, regular check- up of the savings, investment maintenance of building elements and incorporated equipment that underwent energy renovation)

PROGRAMME IMPLEMENTATION CONTRACTED EPC to be signedPPP in progress No. 18 EPC5 EPC6 PPP Area m m m 2 Energy savings kWh/y kWh/y  Contract value (including VAT) Kn ( €) Kn ( €) Kn (estimated value without VAT) Buildings

BEST PRACTICE Clinical Hospital Centre Split - site Križine Area : m 2 Contract value: Kn including VAT Energy savings : kWh / year

THANK YOU FOR YOUR ATTENTION Irena Križ Šelendić M.C.E. Head of Service Directorate for construction and energy efficienc in the building sector Ministy of Construction and Physical Planing Zagreb, Croatia Tel: Cell: Web: Photo by Marko Vrdoljak. This photo is the property of The Zagreb Tourist Board.