16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.

Slides:



Advertisements
Similar presentations
JIT, TPS, and Lean Operations
Advertisements

Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
JIT, TPS, and Lean Operations
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2008 Prentice Hall, Inc.16 – 1 Operations Management Chapter 16 – JIT and Lean Operations PowerPoint presentation to accompany Heizer/Render Principles.
© 2006 Prentice Hall, Inc.16 – 1 Operations Management Just-in-Time and Lean Production Systems Just-in-Time and Lean Production Systems © 2006 Prentice.
JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT/Lean Production Chapter 13.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
JIT/Lean Production Chapter 13. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Just-in-Time.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Production - Objectives
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
JIT – Just-In-Time Production
ISEN 315 Spring 2011 Dr. Gary Gaukler. Push and Pull Production Control “Push” system: Determines when and how much to produce based on forecasts of future.
JIT and Lean Operations
Introduction to lean philosophy
Lecture 27 Just-in-Time Manufacturing
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 24 1.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 25 1.
© 2008 Prentice Hall, Inc.16 – 1 Operations Management Chapter 16 – JIT and Lean Operations Presented by :- Robin Shweiki Supervised by: Dr Yousef abu.
“Without the Cost of Waste …”
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lecture 28 Just-in-Time Manufacturing (Continued)
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 15 Lean Operations / JIT.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
JIT/Lean Production Chapter 13.
JIT and Lean Operations
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Operations Management
Operations Management
Just-In-Time and Lean Production
JIT, TPS, and Lean Operations
JIT, TPS, and Lean Operations
Chapter 16 JIT, TPS, and Lean Operations.
Operations Management
Presentation transcript:

16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles of Operations Management, 8e, Global Edition PowerPoint slides by Jeff Heyl

16 - 2© 2011 Pearson Education JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate waste, remove variability, and improve throughput

16 - 3© 2011 Pearson Education Just-In-Time, TPS, and Lean Operations  JIT is a philosophy of continuous and forced problem solving via a focus on throughput and reduced inventory  TPS emphasizes continuous improvement, respect for people, and standard work practices  Lean production supplies the customer with their exact wants when the customer wants it without waste

16 - 4© 2011 Pearson Education Eliminate Waste  Waste is anything that does not add value from the customer point of view  Storage, inspection, delay, waiting in queues, and defective products do not add value and are 100% waste

16 - 5© 2011 Pearson Education Ohno’s Seven Wastes  Overproduction  Queues  Transportation  Inventory  Motion  Overprocessing  Defective products

16 - 6© 2011 Pearson Education Eliminate Waste  Other resources such as energy, water, and air are often wasted  Efficient, sustainable production minimizes inputs, reduces waste  Traditional “housekeeping” has been expanded to the 5 Ss

16 - 7© 2011 Pearson Education The 5 Ss  Sort/segregate  Sort/segregate – when in doubt, throw it out  Simplify/straighten  Simplify/straighten – methods analysis tools  Shine/sweep  Shine/sweep – clean daily  Standardize  Standardize – remove variations from processes  Sustain/self-discipline  Sustain/self-discipline – review work and recognize progress

16 - 8© 2011 Pearson Education The 5 Ss  Sort/segregate  Sort/segregate – when in doubt, throw it out  Simplify/straighten  Simplify/straighten – methods analysis tools  Shine/sweep  Shine/sweep – clean daily  Standardize  Standardize – remove variations from processes  Sustain/self-discipline  Sustain/self-discipline – review work and recognize progress  Two additional Ss  Safety – build in good practices  Support/maintenance – reduce variability and unplanned downtime

16 - 9© 2011 Pearson Education Remove Variability  JIT systems require managers to reduce variability caused by both internal and external factors  Variability is any deviation from the optimum process  Inventory hides variability  Less variability results in less waste

© 2011 Pearson Education Sources of Variability 1.Incomplete or inaccurate drawings or specifications 2.Poor production processes resulting in incorrect quantities, late, or non-conforming units 3.Unknown customer demands

© 2011 Pearson Education Sources of Variability 1.Incomplete or inaccurate drawings or specifications 2.Poor production processes resulting in incorrect quantities, late, or non-conforming units 3.Unknown customer demands Both JIT and inventory reduction are effective tools in identifying causes of variability

© 2011 Pearson Education Improve Throughput  The time it takes to move an order from receipt to delivery  The time between the arrival of raw materials and the shipping of the finished order is called manufacturing cycle time  A pull system increases throughput

© 2011 Pearson Education Improve Throughput  By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement  Manufacturing cycle time is reduced  Push systems dump orders on the downstream stations regardless of the need

© 2011 Pearson Education Just-In-Time (JIT)  Powerful strategy for improving operations  Materials arrive where they are needed when they are needed  Identifying problems and driving out waste reduces costs and variability and improves throughput  Requires a meaningful buyer-supplier relationship

© 2011 Pearson Education JIT and Competitive Advantage Figure 16.1

© 2011 Pearson Education JIT and Competitive Advantage Figure 16.1

© 2011 Pearson Education JIT Partnerships  JIT partnerships exist when a supplier and purchaser work together to remove waste and drive down costs  Four goals of JIT partnerships are:  Removal of unnecessary activities  Removal of in-plant inventory  Removal of in-transit inventory  Improved quality and reliability

© 2011 Pearson Education JIT Partnerships Figure 16.2

© 2011 Pearson Education Concerns of Suppliers  Diversification  Diversification – ties to only one customer increases risk  Scheduling  Scheduling – don’t believe customers can create a smooth schedule  Lead time  Lead time – short lead times mean engineering or specification changes can create problems  Quality  Quality – limited by capital budgets, processes, or technology  Lot sizes  Lot sizes – small lot sizes may transfer costs to suppliers

© 2011 Pearson Education Distance Reduction  Large lots and long production lines with single-purpose machinery are being replaced by smaller flexible cells  Often U-shaped for shorter paths and improved communication  Often using group technology concepts

© 2011 Pearson Education Increased Flexibility  Cells designed to be rearranged as volume or designs change  Applicable in office environments as well as production settings  Facilitates both product and process improvement

© 2011 Pearson Education Impact on Employees  Employees may be cross trained for flexibility and efficiency  Improved communications facilitate the passing on of important information about the process  With little or no inventory buffer, getting it right the first time is critical

© 2011 Pearson Education Reduced Space and Inventory  With reduced space, inventory must be in very small lots  Units are always moving because there is no storage

© 2011 Pearson Education Reduce Setup Costs  High setup costs encourage large lot sizes  Reducing setup costs reduces lot size and reduces average inventory  Setup time can be reduced through preparation prior to shutdown and changeover

© 2011 Pearson Education Table 16.3 Better scheduling improves performance JIT Scheduling JIT Scheduling Tactics Communicate schedules to suppliers Make level schedules Freeze part of the schedule Perform to schedule Seek one-piece-make and one-piece move Eliminate waste Produce in small lots Use kanbans Make each operation produce a perfect part

© 2011 Pearson Education Kanban  Kanban is the Japanese word for card  The card is an authorization for the next container of material to be produced  A sequence of kanbans pulls material through the process  Many different sorts of signals are used, but the system is still called a kanban

© 2011 Pearson Education Kanban 1.User removes a standard sized container 2.Signal is seen by the producing department as authorization to replenish Part numbers mark location Signal marker on boxes Figure 16.8

© 2011 Pearson Education Kanban Figure 16.9 Kanban Final assembly Work cell Kanban Material/Parts Supplier Finished goods Customer order

© 2011 Pearson Education JIT Quality  Strong relationship  JIT cuts the cost of obtaining good quality because JIT exposes poor quality  Because lead times are shorter, quality problems are exposed sooner  Better quality means fewer buffers and allows simpler JIT systems to be used

© 2011 Pearson Education JIT Quality Tactics Use statistical process control Empower employees Build fail-safe methods (poka- yoke, checklists, etc.) Expose poor quality with small lot JIT Provide immediate feedback Table 16.4

© 2011 Pearson Education Toyota Production System  Continuous improvement  Build an organizational culture and value system that stresses improvement of all processes, kaizen  Part of everyone’s job  Respect for people  People are treated as knowledge workers  Engage mental and physical capabilities  Empower employees

© 2011 Pearson Education Toyota Production System  Standard work practice  Work shall be completely specified as to content, sequence, timing, and outcome  Internal and external customer-supplier connection are direct  Product and service flows must be simple and direct  Any improvement must be made in accordance with the scientific method at the lowest possible level of the organization

© 2011 Pearson Education Building a Lean Organization  Develop partnerships with suppliers  Educate suppliers  Eliminate all but value-added activities  Develop employees  Make jobs challenging  Build worker flexibility

© 2011 Pearson Education Lean Operations in Services  The JIT techniques used in manufacturing are used in services  Suppliers  Layouts  Inventory  Scheduling