How it works the Kanban ? The definitive slideshow to understand how it works the Kanban Method Example 1 – Point of Use / Warehouse.

Slides:



Advertisements
Similar presentations
Scribe, Watch act 4 scenes, Begin reading act 5 HW: make-up work, redo work Monday: Scribe, Watch act 4 scenes, Begin reading act 5 Tuesday: Scribe, PLN.
Advertisements

Socratic seminar 13- end, collect SR, LL conference HW: quiz over Monday: Socratic seminar 13-end, collect SR, LL conference Wednesday: ACT day,
PLN 4; double post finish intro and 1 st body CSAP exercises HW: typed, double spaced intro and first body paragraphs Monday: finish intro and 1 st body,
3 rd body- write 3 rd body CSAP Sign up for PLN presentations Hw: intro- 3 rd body written Monday: finish 3 rd body- write 3 rd body, CSAP Tuesday: writing.
Weather diary 31ST March-6 April hungary,Marcali.
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Problem of the Week! Max was in charge of getting the equipment for the 14 people on his baseball team. He made sure he had 8 bats and 38 baseballs. He.
Who? 8 th grade Students What? Take a New York State Assessment in Math Where? Sequoya Middle School When? May 11 th and 12 th (Wednesday and Thursday)
Ryerson Community School and Vocal Music Academy News and Important Dates.
Swim Lessons Fall 2008 Please call for private lessons or lessons for children with special needs. We will do our best to accommodate your requests and.
BA271 Week 9 Lecture Using forms in Access. Status Report … Review where we are … –Midterm – Graded! –Final websites – Graded! –Access #1 – Graded! –Access.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
GEOMETRY – WEEK 1 (JAN. 6 TH – 10 TH ) Monday – Non-Student Day Tuesday – Introduction; Review for Ch. 6, 1-15 Wednesday – Warm-up 1-5; Notes, Section.
Time Zones The World is divided up into 24 time zones. Each time zone is approximately 15 degrees of longitude wide. The time within each time zone has.
ALGEBRA II – Week 1 ( Jan. 6 th – 10 th )  Monday – Non-student Day  Tuesday – Overview; Note sheet 1-17  Wednesday – Warm-up 1-4; Notes, Section 7-1;
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
MY fLIGHT pLAN By Josephine. DeStInAtIoNDuRaTiOnTiMe ZoNe Surabaya  Singapore2 hours 13 minutesSingapore is 1 hour ahead of Surabaya Singapore  Suva11.
MY FUTURE AMAZING JOURNEY BY : DEWI. Surabaya to Jakarta Facts: I will start my journey on Sunday the 2nd of February a.m Lenght of the flight:
3 rd Six Weeks November 18, 2013 through January 16, 2014.
YEAR 11 – EXAM PERIOD Monday 1 st June - Friday 5 th June WEEK 4.
Keystone Exams Directions December Importance of the Keystone Exams The Keystone Exams have replaced the PSSA Exams we used to do. Our scores affect.
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
 pop-up poetry  Conference reflection:  Writing conference  Hw: paper redos- by Monday 3/8  Monday: pop-up poetry, writing conference  Tuesday: writing.
Mrs. Sokolowska.   ska
YEAR 11 – EXAM PERIOD Monday 8 th June - Friday 12 th June WEEK 5.
The Cay Timeline. Week 1 Monday – Read Chapter 1 Tuesday – Read Chapter 2 Wednesday – Questions on 1 and 2 (notes) Thursday – Todays’ meet Friday – Discuss.
PART OF SPEECH DEFINITION SYNONYM SENTENCE WORD ORIGIN NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Monday September 24 Copy ALL of the schedule in your planner. MondayTuesday/WednesdayThursday/Friday Constants worksheet, exit slip on constants (if time)
Lecture 11.   Modular arithmetic is arithmetic in which numbers do not continue forever.  Modulo 7 has numbers 0, 1, 2, 3, 4, 5, and 6.  Modulo 5.
This Week – 7A This Week – 7A Monday Year Parish Mass.
April 27-May 1 Monday: Brain Break Day Choose a table for Scrabble We’ll go over the rules once everyone is here.
Garside: SNC2D. The following schedule is for Period 2 Class:
DATE# OF OCCURRENCES ADDITIONAL COMMENTS Frequency Data Collection Form Name: ____________________________________________ Target Behavior: ____________________________________.
Strategy Part of Speech noun Definition A careful plan or method for achieving a goal. Sentence The student’s strategy for winning the reading contest.
Question of the Day! Week 18 5/22 – 5/26. Question of the Day! Monday, May 22nd Which type of cloud is easiest to spot and why?
Algebra II – Week 1 (Jan. 5 th – 9 th ) Monday – Introduction; Textbook, Pgs , 5-43 odd Tuesday – Warm-up; 1-4; Notes, Section 6; Workbook, Pg.
Monday December 3rd 1. Check for an titled “assignments” make corrections 2. Open Fall of the Roman Empire letter project your reason.
Week of December 3, 2012 Mrs. Miller’s Classes. Zero Hour8:00 to 8:27 Monday – 6 th Grade Math Tutorials Tuesday – 6 th Grade Math Tutorials Wednesday.
My World Travel By: Ryan, 5C. Surabaya- Singapore I left Surabaya at, Monday, 13 th August 2012, AM. It took 1 hours 54 minutes to travel from Surabaya.
January Book Project January 5 th - January 23rd.
 scribe,  grammar,  wiki conference,  Finish reading act 2.4-5,  act 2 quiz?  Hw: corrections due on Friday  Monday: scribe, grammar, wiki conference,
W ARM -U P J ANUARY 9, 2014 Turn in the work that is on the board in the folder in the back I will go over questions before we take the quiz.
Weekly Centers.
7 th Grade Language Arts Monday, October 5, 2015 No DOL this week Harris and Me Begin writing assessment- “Seventh Grade” Must be submitted by Friday at.
This Week – 2B This Week – 2B Elective Music Performance Evening – Years 10 & 12 - Monday, 5.30 – 7.30pm in Hall CCC RL Gala Day - Monday.
Tuesday December 4th 1. Review Game 2. Open Fall of the Roman Empire letter project Take notes from video 3. Fall of Roman Empire Video (40)
Start new page for this week. Label it WEEK 19. Monday, 1/4 Pages : Answer the 3 “Map Focus” Questions. Paper Passer-outers for the week (exempt.
TODAY IS MONDAY THE 16 th OF NOVEMBER 2015 ON MONDAY WE ARE WORKING WITH THE LAPTOP.
PeriodTimeMinutes 3 rd Period8:00 – 8: rd Period8:45 – 10:1590 Break10:15 – 10: th Period10:30 – 11: th Period11:10 – 12:4090 PeriodTimeMinutes.
ANNOUNCEMENTS ANNOUNCEMENTS FRIDAY, NOVEMBER 13, 2015 TODAY IS AN “A” DAY.
Monday October 5, 2015 WARM-UP: QUESTION #1 WEEK OF OCT 5 QUESTION - DESCRIBE HOW THE RESPIRATORY SYSTEM AND THE CIRCULATORY SYSTEM WORK TOGETHER. Unit.
Dhani 5A. Length of flight 1 hour,43 minutes Time zone Singapore is 1 hour ahead of surabaya Departure 10 January 2012 Tuesday 5:00 am Arrive 05:00+01:43+01:00=7:43.
Week #27Monday, March 4th, 2014 Due: This week will end with our 3 rd quarter memory review test on the following verses: Romans 5:3Romans 8:28 1 Corinthians.
Dr. Martin Luther King Jr. School #9 Expanded Learning Opportunities.
This Week – 8B This Week – 8B Foundation Day Singing Practice Tuesday Period 1 - Year 7 Period 2 - Year 8 Period 3 - Year 9 Period 5 - Year 10.
Mustang LEAD Advisory Period 4 th Six Weeks January 21, Through February 28, 2014.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
Pace’s Practical Tips Mrs. Pace’s Page Welcome to 5 th Grade Team 5I - Guess Who?
Monday 2/8 Page 353: Define the Content Vocabulary Tejano decree barricade annex Paper passer outers (exempt from bellwork): 1 st Hour – Annabel 2 nd Hour.
Problem of the Week! Delvin exercised 3 days each week. He ran 2 miles on his treadmill, rode his bike for 30 minutes and lifted weights for 15 minutes.
Mrs. Miller’s Classes.  Monday – 6 th Hour Math Tutorials  Tuesday – 6 th Grade Math Tutorials  Wednesday – 7 th Grade Math Tutorials  Thursday –
8 th Grade Language Arts Monday, October 5, 2015 No DOL this week Far North Begin essay assessment- “Charles” Must be submitted by Friday at 9 P.M.
Standard Grade Prelim Revision The topics we will be revising are: 1. Wednesday 17 th November – Pythagoras 2. Monday 22 nd November – Statistics 3. Tuesday.
Problem of the Week! Sam arrived at the Shoprite store at 4:00 in the afternoon. He shopped for 2 hours buying school supplies. Pencils were 15 cents each,
Watercolor Cards Unit Art with Ms. Gay Project Guidelines: You will be creating a watercolor card. This can be a “thank you” card for a teacher (or anyone.
My Plan to Go to Around the world By: Benedict/5C.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Need Help With Trig graphs? Then this workshop is for YOU! Where: MS109 When: Wednesday March 16 th and Thursday March 17 th When: 11:30 – 12:30 All Math.
Presentation transcript:

How it works the Kanban ? The definitive slideshow to understand how it works the Kanban Method Example 1 – Point of Use / Warehouse

What you need prior to start ? (therotical aspects) Why Use Kanban ? Theory of Kanban How to calculate the right number of Kanban Visit

What you need prior to start ? Define the Point of Use A place to put Kanban The right number of Kanban A runner/collector of Kanban

Real Example A point of use (POU) needs balls in 6 pcs / boxes Consumption is 18 balls / day The runner pass every day at 10:00 am The Lead Time to recieve from warehouse = 2 days Safety Stock fixed at 20% This means => 8 Kanban Cards in WIP

Monday 8:00 AM – Start Work POU Warehouse

Monday 8:00 AM – Start Work POU Warehouse Kanban Container is Empty

Monday 8:15 AM POU Warehouse

Monday 8:15 AM POU Warehouse First box of balls is open for use

Monday 8:17 AM POU Warehouse First box of balls Is open for use Kanban is located in the collection point

Monday 9:00 AM POU Warehouse

Monday 10:00 AM POU Warehouse

Monday 10:00 AM POU Warehouse The collector arrives

Monday 10:15 AM POU Warehouse Bring the Kanban to the Warehouse

Monday 11:00 AM POU Warehouse In Process – Recieved Monday at AM

Monday 11:01 AM POU Warehouse 1 st box is finished In Process – Recieved Monday at AM

Monday 11:05 AM POU Warehouse 2nd box is opened Kanban moved In Process – Recieved Monday at AM

Monday 12:00 PM POU Warehouse In Process – Recieved Monday at AM

Monday 12:00 PM POU Warehouse In Process – Recieved Monday at AM

Monday 14:00 PM POU Warehouse 2nd box is finished In Process – Recieved Monday at AM

Monday 14:00 PM POU Warehouse 3rd box is opened Kanban Moved In Process – Recieved Monday at AM

Monday 14:15 PM POU Warehouse In Process – Recieved Monday at AM

Monday 17:00 PM – End of Work POU Warehouse 3rd box is finished In Process – Recieved Monday at AM

Tueday 8:00 AM – Start Work POU Warehouse In Process – Recieved Monday at AM

Tuesday 8:15 AM POU Warehouse In Process – Recieved Monday at AM

Tuesday 9:00 AM POU Warehouse In Process – Recieved Monday at AM

Tuesday 10:00 AM POU Warehouse In Process – Recieved Monday at AM The collector arrives

Tuesday 10:15 AM POU Warehouse In Process – Recieved Monday at AM Bring Kanban to Warehouse

Tuesday 10:30 AM POU Warehouse In Process – Recieved Monday at AM

Tuesday 17:00 PM – End of Work POU Warehouse In Process – Recieved Monday at AM

Wednesday 8:00 AM – Start of Work POU Warehouse In Process – Recieved Monday at AM

Wednesday 8:15 AM POU Warehouse In Process – Recieved Monday at AM

Wednesday 8:30 AM POU Warehouse Stick Kanban on the box

Wednesday 8:45 AM POU Warehouse In Process – Recieved Tuesday at AM

Wednesday 9:00 AM POU Warehouse In Process – Recieved Tuesday at AM Box From Warehouse to POU

Wednesday 9:30 AM POU Warehouse In Process – Recieved Tuesday at AM

Wednesday 10:00 AM POU Warehouse In Process – Recieved Tuesday at AM The collector arrives

Wednesday 10:15 AM POU Warehouse In Process – Recieved Tuesday at AM Bring Kanban to the Warehouse

Wednesday 17:00 PM – End of Work POU Warehouse In Process – Recieved Tuesday at AM Empty in the POU – a warning to warehouse is given

Wednesday 17:00 PM – End of Work POU Warehouse In Process – Recieved Tuesday at AM EMPTY is always a Visual Warning

Thursday 8:00 AM – Start of Work POU Warehouse Because of warning the material in in POU at 8:00 AM

Thursday 8:15 AM POU Warehouse

Thursday 8:30 AM POU Warehouse

Thursday 10:00 AM POU Warehouse The collector arrives

Thursday 17:00 PM – End of Work POU Warehouse

Friday 8:00 AM – Start of Work POU Warehouse

Friday 17:00 PM – End of Work POU Warehouse Next Week the same cycle...

Some Considerations The WIP is under control (48 balls in 8 boxes) Is the system too risky of stock-out in the POU and why? Looking carefully at the lead time, if the collector comes at AM, the POU start at 8.00 AM and the warehouse brings the boxes at 9.00 AM the lead time to consider is not 2 days but 2 days and 3 hours. In this case the correct lead time to use is round 2.5 days and the kanban system need is: 9 Kanban Cards rather than 8 Kanban Cards

Some Considerations At the beginning of Kanban Implemetation starts with a safe number of kanban cards and then reduced it when the system will be stable and reliable.

Thank you for your attention Visit us on