Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia 17-18 Dec. 2012, Berlin, Germany Unwanted Beam Workshop.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
ALICE : Superconductive Energy Recovery Linac (ERL)
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Outline 1.ERL facility for gamma-ray production [A. Valloni] 2.ERL facility - Tracking Simulations [D. Pellegrini] 3.SC magnet quench tests [V. Chetvertkova]
ESS DTL beam commissioning
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
POSTECH PAL Development of S-band RF gun and advanced diagnostics in PAL 박용운 (Yong Woon Park, Ph.D.) 포항 가속기 연구소 (Pohang Accelerator Laboratory, PAL) 포항공과대학교.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Synchronisation Activities for 4GLS Supported by EUROFEL DS3 G J Hirst CCLRC Central Laser Facility.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
ICFA Workshop on Future Light Source, FLS2012 M. Shimada A), T. Miyajima A), N. Nakamura A), Y. Kobayashi A), K. Harada A), S. Sakanaka A), R. Hajima B)
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
ApEx needs for CeC PoP Experiment December 11, 2015.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Seesion1 summary Unwanted Beam Workshop (UBW 2012) Dark Current Issues for Energy Recovery Linacs.
Overview Preparatory work at the MML BBA to define the reference orbit
Beam Commissioning Adam Bartnik.
Novosibirsk ERL facility G.N. Kulipanov and NovoFEL team
Beam based measurements
Plans of XFELO in Future ERL Facilities
Options and Recommendations for TL and Dumps
Status and prospects of VEPP-5 Injection Complex
G.N. Kulipanov and NovoFEL team
Joint Accelerator Research JGU & HZB
Revised Commissioning Strategy
The Cornell High Brightness Injector
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
Machine Operation and Progresses in SSRF
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Capture and Transmission of polarized positrons from a Compton Scheme
ERL accelerator review. Parameters for a Compton source
LHC (SSC) Byung Yunn CASA.
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
CLIC Feasibility Demonstration at CTF3
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop

N.A.Vinokurov, V.S.Arbuzov, P.D.Vobly, V.N.Volkov, M.G.Vlasenko, Ya.V.Getmanov, E.I.Gorniker, E.N.Dementyev, B.A.Dovzhenko, B.A.Knyazev, E.I.Kolobanov, A.A.Kondakov, V.R.Kozak, E.V.Kozyrev, V.V.Kubarev, G.N.Kulipanov, E.A.Kuper, I.V.Kuptsov, G.Ya.Kurkin, L.E.Medvedev, L.A.Mironenko, V.K.Ovchar, B.Z.Persov, A.M.Pilan, V.M.Popik, V.V.Repkov, T.V.Salikova, I.K.Sedlyarov, G.V.Serdobintsev, S.S.Serednyakov, A.N.Skrinskiy, D.A.Skorokhod, S.V.Tararyshkin, V.G.Cheskidov, K.N.Chernov, M.A.Scheglov, O.A.Shevchenko NovoFEL Team 2

OUTLINE Scheme of NovoFEL facility First Stage (one-pass ERL) Second Stage (two-pass ERL) Four-pass ERL Main factors of beam losses low energy FEL lasing multi-pass operation Diagnostic system Status of four-pass ERL Conclusion 3

Novosibirsk FEL

1 – injector, 2 – linac, 3 – bending magnets, 4 – undulator, 5 – dump Energy Recovery Linac 5

Lasing (1) Lasing (4) Lasing (2) groups of undulators and IR FELs (under construction and fabrication) One track in vertical plane (terahertz FEL) Common for all FELs accelerator system 6 Two tracks in a horizontal plane (IR FEL) Four tracks in a horizontal plane Full scale Novosibirsk FEL 6

7

First stage of NovoFEL (one-pass ERL) Electron beam from the gun passes through the buncher (a bunching RF cavity), drift section, 2 MeV accelerating cavities and the main accelerating structure and the undulator, where a fraction of its energy is converted to radiation. After that, the beam returns to the main accelerating structure in a decelerating RF phase, decreases its energy to its injection value (2 MeV) and is absorbed in the beam dump. 8

First stage of NovoFEL  Wavelength, mkm  Repetition rate, MHz11.2  Pulse duration, FWHM, ps ~70  Average power, kW0.4  Pulse energy, mJ0.04  Minimum relative linewidth, FWHM

2 nd stage FEL undulator Main linac 1 st stage FEL undulator Horizontal tracks 10

Second Stage  Wavelength, mkm  Electron energy, MeV22  Average current, mA30 11

Third stage  Wavelength, mkm5-30  Electron energy, MeV42  Average current, mA100 12

Third track 13

Third trackFourth track 14

Magnetic elements with Long Edge Fields Edge fields of different elements can intersect Residual induced magnetic fields Noticeable effect of Earth magnetic field High space charge of the bunch. High energy spread in mode with FEL lasing Magnetic elements are used to control two different types of the bunches – ac. and dec. Unknown initial parameters in injector Time variation of the parameters (phases of RF) due to transition period Main problems with operation 15

I = 250 A I = 10 A Representation of real quadrupole with ideal one 16

Intersection of the magnets with long edge fields 17

Representation of real RF cavity field in Trace-3D Solid red line – real field distribution, dotted red line – Trace-3D cavity field distribution with L eff = 70 cm, black boxes – cavity boundary position. 18

External magnetic field correction Using the wire field correction allowed to exclude vertical correctors At the energy 10 MeV, the deviation after 30 m will be about 0.7 m 19

Interaction of electrons with radiation in FEL leads to large energy spread. Moreover the relative energy spread increases at deceleration. Therefore the longitudinal acceptance is very important parameter of ERLs which work for FELs Before FELAfter FEL Energy spread 20

Beam position monitors Vacuum pump and controls Thermo control sensors Beam current sensors Radiation sensors FEL light analysis system (monochromator and Fourier spectrometer) System of the radiation control and localization with optical fiber Diagnostic system 21

Beam position monitors  BPMs system of the NovoFEL is designed to detect and separate two bunches following each other.  This system can be used to calculate the lengths of turns for multipass ERL.  There are two different modes of operation – “laboratory” and “reference”.  BPM works as warning system 22

1-st stage: 37 BPMs 23

3-d stage: 152 BPMs 24

BPM signal of single electron bunch. The sinusoidal RF signal (green) makes possible direct measurement of the orbit lengths. Orbit length measurement 25

Radiation control  Large area of the losses localization  Calibration of sensors depends on the place 26

Thermocontrol Example of the program for temperature control  Small area of the losses localization  Calibration of sensors depends on the place 27

1 2 3 Spectrum is measured in real time Measurement spectrum of radiation 28

Accidents 29

30 Third Stage NovoFEL: four pass ERL 95% of the beam current goes to the dump 1,5% 3,5% 30

Conclusion Unwanted beam losses can exist due to low energy effects, generation and insufficiently flexibility of system in multipass mode. Protection system, well working in regular mode, should be changed for tuning and adjusting mode. At this time, in Novosibirsk FEL based on one-turn ERL operates with the highest power in terahertz region; FEL based on the first in the world two-passes ERL operates in infrared region; at the four-pass ERL is achieved the 95% recuperation and 1 mA current. The commissioning of the NovoFEL ERL proves the opportunity of the operation multipass ERLs. 31

Thank you for your attention! 32