CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CRYOGENICS AND POWERING
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
R.Schmidt, HC 28/5/ Access to underground areas during powering Risk: accidental massive helium release (as on 19 September) when superconducting.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Introduction, Andrzej Siemko
Powering LHC magnets version 30/3/2007.
Minimum Hardware Commissioning – Disclaimer
Markus, Mathieu, Enrique, Rudiger, Serge
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Circuit-protection aspects of different preliminary magnet-design options
Powering the LHC Magnets
MPE main activities planned for LS2
Renovation of the 45-year old PS magnets
Status of ELQA equipment and related software
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
3 issues identified in review
TEST PLANS for HL LHC IT STRING
+ many slides from various colleagues (KH, Rudiger, Paul, …)
(damaged board on RQD/F)
Brief report of the hardware commissioning activities
Powering and Safety day Underground access during powering tests
Other arguments to train two sectors to 7 TeV
Presentation transcript:

CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert, H.Thiesen, A.Verweij

07/10/20112 General layout CSCM workshop - M.Solfaroli The RB power converter will be used (in a special configuration) to power the RB circuit, then the RQD/F. These 2 circuits will be tested as a unique line. Preparation Test execution Restoring normal configuration Re- commissioning (see Mirko’s) 3 circuits to be tested: o RB o RQD o RQF

07/10/20113 Modification: PC CSCM workshop - M.Solfaroli RB converter needs to provide 300 V: o Install new 2MW power converters for the tests o No power converters available o Heavy installation work o Connect in series both RB power converters (UAx3 and UAx7) o 500 m between the both power converters o How to control the converters (separate control) o Modify the MB power converter o 2 bridges in // to reach 13kA o 2 bridges in series to reach 380V See Hugues’

07/10/20114 Modification QPS + EE CSCM workshop - M.Solfaroli o EE system: o Short circuit to exclude the system from the circuits in order to avoid V spike whenever the quench loop is open and the current is extracted o QPS: o Exchange of all BS board (the old ones will be left close to the rack in dedicated box and labeled) o Muting of the old QPS system and plugging the relative cables o Muting of the global busbar detector o Threshold estimation and load See Jen’s

07/10/20115 Modification: PIC CSCM workshop - M.Solfaroli o Swapping some interlock cables to allow powering the RQD/F circuits with the RB power supply o As the test will be carried out at 20 K a masking of the cryo conditions is needed o Deactivation of the global protection mechanism to allow powering while other circuits are not in condition

07/10/20116 Preparation timeline CSCM workshop - M.Solfaroli (PC lock and QHPS off are considered to take place at the beginning of Xmas Stop for all circuits) RB PC configuration preparation – 2 weeks BS board exchange – 3 days Old QPS and global BB detector muting – 1 day EE strap – ½ day PIC cabling modification - ½ day DC cables disconnection (on DFB) RB, RQD, RQF – ½ day ElQA at reduced voltage (360/600 V) on RB, RQD, RQF – 1 day DC cables connection (on DFB) and PC unlock – ½ day Tests – minimum 6 days

07/10/20117 Restoring timeline CSCM workshop - M.Solfaroli Tests – 6 days PC lock and DC cables disconnection (on DFB) (RB, RQD, RQF and spool pieces) – ½ day BS board exchange – 3 days Old QPS and global BB detector un-muting – 1 day EE strap removal – ½ day PIC cabling re-setting – ½ day PC special configuration removal – 2 weeks ElQA (RB, RQD, RQF, spool pieces) – 1 day DC cables connection (on DFB) (RB, RQD, RQF, spool pieces) – ½ day QHPS switching on + IST first step – 1 day Re-commissioning of the circuits – 4 days (no difference wrt other sectors)

07/10/20118 Preparation/restoring planning CSCM workshop - M.Solfaroli 2 weeks for preparation 2 weeks for removal 7 days of test

07/10/20119CSCM workshop - M.Solfaroli Test baseline  IST on all QPS magnets - 4 hours  PCC – 1 (0.5) day  V ramp, current ramp to 1 kA, 60 s plateau, ramp down – 30 min:  Check that functionality is correct (all diodes open)  Check signal from all boards is present and correct  Setting the threshold values  Establishing and loading the threshold on the boards – 2 h

07/10/201110CSCM workshop - M.Solfaroli Test baseline  Reading the threshold values to make sure they have been correctly loaded – 5 min  V ramp, current ramp to 5 kA (4 kA for RQDF), 60 s plateau, ramp down – 30 min  The first thermal run-away can occur at this stage  V ramp, current ramp to 6 kA (5 kA for RQDF), 60 s plateau, ramp down – 30 min NB Thermal runaway is likely to happen even if all splices are good for 5 TeV  V ramp, current ramp to 6 kA (5 kA for RQDF), 60 s plateau, ramp down to check nothing has been compromised – 30 min

07/10/201111CSCM workshop - M.Solfaroli Cryogenic considerations  Cryogenic recovery time estimation:  2h from 1 kA  4h from 5(4) kA  5h from 6(5) kA  The time estimation is difficult as the He is in gas state and the estimation of the heat released into the cryogenic system is tricky. Moreover, the system will be used in non standard conditions.  Temperature required for the test is 20 ± 10 K  The homogeneity of the temperature over the sector can be ensured in a range of 2 K

07/10/201112CSCM workshop - M.Solfaroli Test timeline STEP - RBTime 1 RB PIC12 h 2PCC1 day 3RB kA½ h 4Recovery2 h 5Threshold loading + check2 h 6RB kA½ h 7Recovery4 h 8RB kA½ h 9Recovery5 h 10RB kA½ h 11 Recovery5 h STEP – RQDFTime 1RQDF PIC12 h 2PCC1/2 day 3RQDF kA½ h 4Recovery2 h 5Threshold loading + check2 h 6RQDF kA½ h 7Recovery4 h 8RQDF kA½ h 9Recovery5 h 10RQDF kA½ h 11 Recovery5 h nQPS IST – 4 hours Configuration change~ 1day

07/10/201113CSCM workshop - M.Solfaroli Test planning 3 days per circuit + 1 day for changing the configuration

07/10/201114CSCM workshop - M.Solfaroli Initial strategy S12 – – 45 Good for >=4.5TeV? 3.5/4 TeV Estimated delay = D weeks (test + HWC) 3.5/4 TeV Estimated delay = D weeks (test + HWC) P 5 = probability to find bad splice for 5TeV P 5 > X ? S78 – 81 Good for >= 4.5 TeV? S Good for >= 4.5 TeV? NO (D = 4) NO (D = 6) NO (D = 8) YES NO 4.5 or 5 TeV Estimated delay = 10 weeks (test + HWC + BC) 4.5 or 5 TeV Estimated delay = 10 weeks (test + HWC + BC) YES (D = 4)

07/10/201115CSCM workshop - M.Solfaroli Type test  CSCM test was born as a global test to be done in all sectors of the LHC to try to increase the LHC operational Energy  We then realized that the there would have been a strong impact on Xmas break activities and the physics production would have probably not start before probably beginning July  It was then decided that with a type test valuable experience to study the methodology and tools and improve them for later testing could be gained  It was decided to go for a type test during the Xmas stop in one sector

07/10/201116CSCM workshop - M.Solfaroli Test location SectCryo + planning availability Cryo considerationPlanning considerationDN200 S12Wk 6 + delayOKInstallation blindage in UJ13/17OK S23Wk 4OKNO S34Wk 6 + delay (~5 days)OK S45Wk 7 Fragile leak in the QRL. To be avoided. CablingPartial S56Wk 6 + delayOK S67Wk 5 + delayOKCablingOK S78Wk 3-4OKCabling R2E + termo switchesNO S81Wk 3-4OKCabling R2E + termo switchesNO Due to the constraints of the cryo maintenance schedule and the timing needed to stabilize the sector before the Xmas holidays it is not possible to have one sector available before Xmas

07/10/201117CSCM workshop - M.Solfaroli Full test This is an exercise!!  All cryo conditions at the same time  No time for establishing cryo conditions has been allocated  1 week for both EPC and QPS  2 teams for EPC as well as for QPS  1 week testing  No time for all removal nor re- commissioning has been considered  BS boards for 3 sectors  Ending with 59 days

07/10/2011CSCM workshop - M.Solfaroli18 Safety: access during powering Access rules during powering tests are described in the document “Access and Powering Conditions for the LHC Superconducting Circuits”, EDMS No POWERING PHASE I  Energy stored in superconducting magnets < 100 kJ  Access limited to the tunnel (no patrol needed)  Access possible to UAs and experiments POWERING PHASE II  Energy stored in superconducting circuit > 100 kJ  Access forbidden in tunnel, UAs and adjacent sectors (“Access Restrictions in LHC and SPS during LHC Powering Phase II” EDMS No )

07/10/2011CSCM workshop - M.Solfaroli19 Safety: access during CSCM DRAFT GENERAL CONSIDERATIONS  Energy in the circuits > 100 kJ  No Energy is stored in the magnets - time constant for energy extraction extremely smaller (1-2 s) ELECTRICAL RISKS  High voltage applied  Protection in place on DFBs  All persons accessing has to have the H0/B0 habilitation CRYOGENIC RISKS  He in gas status (in the worst case the release is limited and it will not have impact on neighboring sectors of the LHC)

07/10/2011CSCM workshop - M.Solfaroli20 Safety: responsibility ?? o Safety measures to be put in place are still under discussion o First considerations seem to indicate that rules applied to Phase I powering could be sufficient to ensure personnel safety o An EDMS document has to be released once the rules are finalized o We have involved in the discussion safety people from different department o Who is in charge to put the final stamp on the solution? o Who is responsible for leading the test in the CCC (OP, TE, …)?