Learning Objectives: To compare the different holistic options available for flood management. 19 December 2013 Learning Outcomes: Essential – you will.

Slides:



Advertisements
Similar presentations
1) Explain how each method works … 2) give good points & bad points of each strategy 3) Give viewpoints of different groups of people 4) Consider whether.
Advertisements

Flood Risk Management Helping us help you Gordon Trapmore - Flood & Coastal Risk Manager Devon & Cornwall Kevin Barnes - Flood Resilience Team Leader.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Introduction to the London Borough of Lewisham. The London Borough of Lewisham is situated in the south east of London, including the areas of Lewisham,
Managing Flooding Hard and Soft Engineering LO: to understand the types of hard and soft engineering used to control rivers and the advantages and disadvantages.
Managing Flooding Hard and Soft Engineering. HARD ENGINEERING This uses technology, large amounts of money to try and control the river. It can prevent.
Floods Hard and Soft Engineering. Hard Engineering This uses technology, large amounts of money to try and control the river. It can prevent floods in.
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
What should happen to the Holderness coastline? Learning Objective: To practice decision making skills required for the SDME in June 2014.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
Managing wetlands for wildlife and people Tricia Henton 19 April 2010.
COMMUNITY PRESENTATION
URBAN FLOODS IN GREECE Current situation and major research and development needs in Urban Flood Management Cost meeting, Warsaw, 29-31/5/2008 Vassilopoulos.
Steve Taylor Flood Forecasting Team Leader Anglian Region
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
Severn Tidal Power – a proposal A Barrage of Issues.
Flooding in Boscastle 16th August Map of Boscastle. Aerial Photo. MUST: Annotate images and diagrams to show the causes and effects of the Boscastle.
FLOOD HYDROGRAPHS FOR GCSE GEOGRAPHY.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Water Framework Directive – Coastal issues Will Akast Catchment Delivery Manager-Suffolk.
A 328ft (100m) section of the north bank of the River Derwent was under threat from erosion About 3,000 tonnes of limestone blocks were placed 20ft (6m)
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
FLOODS A. Ramdial. INTRODUCTION Floods are a natural river process in response to changes in drainage basin inputs (precipitation / melt-water runoff)
Flooding New Orleans, Aug Flooding –Varies with intensity and amount of rainfall –Perhaps the most universally experienced natural hazard Flood.
James River in Richmond, Virginia looking upriver from the Robert E. Lee bridge. Belle Isle is on the right, November What is happening in this.
Crisis in Shrewsbury Flooding impacts and risk management.
Green Infrastructure as an Adaptation Response [ Presenters name] [Meeting name] [Date]
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Pgs Learning Objective and Learning Outcomes Learning Objective: To understand the causes, effects and management of river flooding Learning Outcomes:
Where am I? I am 3770 km long I am the 3 rd longest river in the world I am the 10 th largest river in the world At my widest I am 1.5km wide A drop of.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
MAXWELL AZONGO AYELIYA. FLOOD This is the natural overflow or overbanks flow of a river. flood is a natural event that can have far reaching effects on.
What do you need to know? This resource looks at the difference between Hazard, Risk and Disaster!
Living with Streams in Flood
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Describe the features and characteristics of the Three Gorges Dam.
How to answer the ‘affect’ questions By the end of the session I will feel confident on knowing how to recognise what the examiners want from my answers.
 Why should we not have flood defences?. HW  Look throug and revise  River features  UK flooding case study  Key phrases linked to rivers Exam question.
Floods Hard and Soft Engineering Lo; to understand the sustainability of differing flood protection methods.
What are the management challenges associated with the development of river landscapes? Managing river landscapes is often about balancing socio-economic.
Drought was an issue in many parts of the United Kingdom after a very dry winter. There was warning of drought occurring from the early months of 2006.
Examples and case studies. Tropical rainforest (e.g. Amazon) Mount St Helens Mount Nyiragongo Costa RicaHoldernessSan Francisco Three Gorges Dam, China.
WJEC GCSE Geography A Unit 1 – The Core A- The Physical World Theme 1 Water.
What are the problems of managing a river? Socio-economic and environmental needs?
Hard v Soft Engineering
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Objectives..describe and explain hard and soft flood prevention strategies Page GCSE Geography AQA A.
Hard v Soft Engineering You decide???. Hard v Soft Building a structure (often concrete and steel) to control the river. Essentially, dealing with the.
Comparing the effects of flooding in two contrasting areas of the world. Learning Objectives: To compare and contrast the impact of flooding using examples.
River flooding LS: Explain the soft and hard strategies of reducing flood risk. Write a case study for a flood event in an MEDC and LEDC and explain the.
When the river runs high:
What are the solutions for the water crisis?
Introduction to the London Borough of Lewisham
River Conwy - flood management
PowerPoint 5: Flood management strategies
Can you think of any ways that ensuring a water supply can be managed?
What are the different strategies used to try and prevent or manage flooding? To be able to explain the advantages and disadvantages of the different methods.
Worksheets for lesson 10.
GEOLOGICAL AND ENVIRONMENTAL INVESTIGATIONS OF BRIDGE PROJECTS
Managing coastal erosion
Hard and Soft Engineering
Flood Forecasting and Warning Vienna Flood Model
PAPER 3: Geographical Applications
Flooding and River Management
Presentation transcript:

Learning Objectives: To compare the different holistic options available for flood management. 19 December 2013 Learning Outcomes: Essential – you will know the two main flood management strategies. Stretch – you will explain a range of soft engineering strategies. Challenge – you will comment on the advantages and disadvantages of one flood management strategy. How can flood management be carried out in a holistic way?

Need more HOLISTIC approach to flood management that looks at whole catchment area/drainage basin

1.Forecast and warning What is it? In UK rivers are constantly monitored by EA (Environment Agency) Records of river discharge are held to help predict future flood events Uses river data and weather forecasts to predict flood events Automatic rain gauges are also important to use as forecasts could be unreliable (automatically sent to central computer where flood duty officer interprets information) Risk is calculated for each 100m square in the rivers catchment into 3 categories: 1 – Low = flooding chance in the year is 0.5% 2 – Moderate = flooding chance in the year is 1.3% or less (but more than 0.5%) 3 – Significant = Higher than 1.3% in the year (1 in 75 chance)

1.Forecast and warning What is it? (CONT…) Website and phone lines are available for people to call and find out their risk of flooding (Floodline and EA website floodmap) In York automatic phone warnings are issued to inhabitants in potential flooding zones and flood wardens visit homes

1.Forecast and warning Advantages Local authorities and residents have time to prepare for flood event Can be used to inform development planning

1.Forecast and warning Disadvantages Forecasts can never be 100% accurate Does little to actually stop floods, just tries to limit damage.

2. Land use management (Floodplain zoning) What is it? Records for historic flood events can help to predict extent of future flood Return periods for different magnitudes (flood recurrence intervals!) can be linked to areas on floodplain most likely to be affected so that zones of risk can be mapped out: Zone A – Prohibitive Zone = area near channel with high flood risk. Only essential waterside development allowed. Zone B – Restrictive Zone = little development allowed and what is allowed should be flood proofed eg important facilities at higher levels. Best suited to low-intensity or low-value land use eg playing fields and car parks Zone C – Warning Zone = areas further away and on higher land can be used for more diverse range of development eg residential and business. Inhabitants are made aware of flood risk though and given advice.

2. Land use management (Floodplain zoning) What is it?

2. Land use management (Floodplain zoning) Advantages Limits damage to local infrastructure Allows river to flood naturally with minimal damage Reduces cost of flood events

2. Land use management (Floodplain zoning) Disadvantages Can reduce the amount of land available for development (big issue these days with need for housing ever increasing) Can reduce value of land (bad if you owned it before flood zoning occurred!)

3. River Restoration (Naturalisation) What is it? Removing any hard engineering and restoring them to their original state. Idea is that land that is allowed to flood naturally from rainfall events will soak up much of the excess water before it reaches main channel and therefore reduce flooding. Includes: -reintroducing meanders -Controlled access for cattle eg putting in wooden rail system to prevent trampling of river bank -Planting willow hurdles and other vegetation on banks to help support them

3. River Restoration (Naturalisation) Advantages Cheaper More natural and kinder to environment More aesthetically pleasing Much more sustainable – humans should adapt to the shape of rivers.

3. River Restoration (Naturalisation) Disadvantages Much of the land that will be affected is often being used already eg as a residential area People may have to be re-located Reduces availability of land for future development

4. Wetland and river bank conservation What is it? Wetlands are valuable wildlife habitats that benefit from flooding Restoring peat bogs can help to create natural water storage that can help to prevent flooding in other areas EXAMPLE: Nene Washes -Found upstream from Peterborough -Act as overspill for R.Nene at times of high flow -EA use sluices that allow water to be released onto washes when discharge of river becomes too high

4. Wetland and river bank conservation Advantages Benefits local wildlife in addition to flood reduction Much more sustainable Can become a local tourist attraction which may benefit the economy

4. Wetland and river bank conservation Disadvantage Despite long term advantages, local people may not appreciate the short term disadvantages such as being relocated (similar issues to river restoration)

Key issue for any management decision is COST-BENEFIT ANALYSIS Eg how many people/buildings will be protected if we spend X amount. Is it worth it?

-Read the case study and make notes: Soft engineering: River Quaggy restoration scheme, UK. Use page 36 of the Philip Allan text book in order to create a detailed case study of this soft engineering scheme in south east London.

May (c) There is a need to make clear why soft engineering strategies are preferred to hard engineering or vice versa. This is the likely route so there should be reference to the advantages of soft engineering and possibly also the disadvantages of hard engineering. There will probably be some description of the relevant strategies that may be adopted. Alternatively, candidates may disagree with the statement and provide advantages of hard engineering and disadvantages of soft engineering. The final option is to perceive the complementary nature of the two approaches and discuss this aspect. Advantages of soft engineering are likely to refer to its greater sustainability, its limited interference with a natural system, the ability to improve the environment at times and to work with natural systems so that wetlands and habitats may be restored/created, the relative affordability. Disadvantages of hard engineering relate to the extent to which there is change to the natural system and questions over its sustainability – the large scale of building dams and their environmental impact, as well as economic and social costs. Similarly, channelisation means that the flood risk may be increased downstream and habitats destroyed. Advantages of hard engineering may relate to their effectiveness, especially in the short term, associated schemes for HEP, irrigation which give other advantages. Disadvantages of soft engineering relate to ineffectiveness in already built-up areas, the fact that flood warnings allow preparation but are not preventing damage from flooding. They will be seen as reducing the scale of risk rather than preventing flooding. The actual content will depend on the specific strategies considered and whether there is exclusive discussion of soft engineering strategies only. There may be reference to case studies – such as River Quaggy, London, Lincolnshire, Oxfordshire (Cherwell), Ouse, Jubilee River Channel, Carlisle, Three Gorges Dam, Colorado etc. (15 marks)

May 2011 Level 1 (Basic) 1-6 marks Identifies soft and/or hard engineering strategies. Refers to simple reasons why soft engineering is better. Some use of appropriate terminology present at the higher end. Coastal flooding response – if relevant, generic aspects. L1 Identifies strategies L1 Simple reasons given Level 2 (Clear) 7-12 marks Describes strategies and advantages and / or disadvantages of soft and / or hard engineering. Begins to discuss why soft engineering strategies are better (or an alternative option). Uses strategies to illustrate points – will illustrate one aspect only or with imbalance e.g. advantages of soft engineering may be discussed with no reference to hard engineering. Case study material may be included in a descriptive way. Appropriate geographical terminology is used. L2 Begins to discuss Level 3 (Detailed) marks Clear, purposeful discussion that seeks to put a case for/against soft engineering or is aware of the complementary nature of the strategies. Advantages and disadvantages of soft and hard engineering are discussed. Strategies are effectively used to illustrate concepts. Case studies are used to make points. Specific terminology is used throughout. L3 Purposeful discussion – puts a case