A Compact X-Band FEL Linac Chris Adolphsen SLAC. Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Design of Standing-Wave Accelerator Structure
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Dielectric Wakefield Accelerator for an X-ray FEL User Facility
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Beam Dynamics and FEL Simulations for FLASH Igor Zagorodnov and Martin Dohlus Beam Dynamics Meeting, DESY.
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
R&D opportunities for photoinjectors Renkai Li 10/12/2015 FACET-II Science Opportunities Workshops October, 2015 SLAC National Accelerator Laboratory.
SLAC Accelerator Development Program: X-Band RF Power Sources Michael V. Fazio OHEP Accelerator Development Review January 24-26, 2011.
Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.
Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
A compact, soft X-ray FEL at KVI
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
T. Atkinson*, A. Matveenko, A. Bondarenko, Y. Petenev Helmholtz-Zentrum Berlin für Materialien und Energie The Femto-Science Factory: A Multi-turn ERL.
Towards a full C-band multi-bunch/high rep. rate/high gradient injector linac D. Alesini (LNF-INFN, Frascti, Italy) With the contribution of: A. Bacci,
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Abstract EuSPARC and EuPRAXIA projects
Sara Thorin, MAX IV Laboratory
An X-band system for phase space linearisation on CLARA
Status and Interest of the X-ray FEL SINAP
Status of the CLIC main beam injectors
X-band FEL beam dynamics issues
Have a chance to operate your own beam at CERN
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
Brief Review of Microwave Dielectric Accelerators
Update of CLIC accelerating structure design
Measurements, ideas, curiosities
SuperB project. Injection scheme design status
Overview Multi Bunch Beam Dynamics at XFEL
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
Gain Computation Sven Reiche, UCLA April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
Operational Experience with LCLS RF systems
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Presentation transcript:

A Compact X-Band FEL Linac Chris Adolphsen SLAC

Chose X-Band technology as an evolutionary next step for the Next Linear Collider (NLC) from the SLAC Linac S-Band (2.86 GHz) technology. In general want higher rf frequency because: -Less rf energy per pulse is required, so fewer/smaller rf components. -Higher gradients achievable, so shorter linacs (with reasonable efficiencies) Offsetting these advantages are the requirements of: -High power (100’s MW) HV pulses with fast rise times (100’s ns). -High surface gradients in the klystrons, waveguide transport system and accelerator structures. -Tight alignment tolerances due to stronger wakefields (much less an issue for light sources where the bunch charge is low, and bunch length short). X-Band (11.4 GHz) RF Technology

SLAC Linac RF Unit (One of 240, 50 GeV Beam)

NLC Linac RF Unit (One of ~ 2000 at 500 GeV cms, One of ~ 4000 at 1 TeV cm)

X-Band Klystrons ‘XL4’ – Have built at least 15, now producing 12 GHz ‘XL5’ versions

Four 50 MW XL4 Klystrons Installed in the Eight-Pack Modulator in 2004

PPM Klystron Performance (75 MW, 1.6  s, 120/150 Hz, 55% Efficiency Required) SLAC Two tubes tested at 75 MW with 1.6  s pulses at 120 Hz. Efficiency = 53-54%. KEK/Toshiba Four tubes tested at 75 MW with 1.6  s pulses at 50 Hz (modulator limited). Efficiency = 53-56%.

At 75 MW, iris surface field ~ 70 MV/m, lower than in structures (~ 200 MV/m), but higher than sustainable (~ 50 MV/m) in waveguide with comparable group velocity (~ 20%). May require multi-beam klystron approach for stable > 50 MW, 1.6  s operation. KEK PPM2 Output Structure Time (100 ns / div) Reflected Transmitted Power – Normal Pulse Power – Tear Event Klystron Tear Events 14 mm

SEM Photos of a 75 MW PPM Klystron Output Section

Currently using rf-driven klystron output sections to study stability and evaluate future designs At 50 MW, observe on the order of 1 breakdown per hour at 60 Hz, which is comparable to that measured in our older XL4s (nearly all operation during the past 15 years has been below 40 MW)

KEK PPM Legacy Toshiba currently advertizes this de-rated 75 MW PPM tube that at 470 kV, is spec’ed to deliver 50 MW (max) in 400 ns pulses at 50 Hz with a 43% (min) efficiency

Four 2 m long C-band structures, 26 MV/m Total energy gain per modulator = 208 MeV 10 m C-band- Klystron 5.7 GHz, 50 MW, 2.5 μs, 100 Hz 120 MW 0.5 μs 40 MW 2.5 μs 30 MW 3 dB 30 MW SwissFEL’s Choice of C-Band SLED RF pulse compressor Hans Braun: “X-band was not considered because no commercial klystrons available” Currently evaluating bids to have two vendors each build a 50 MW XL4 klystron

NLC High Gradient Structure Development 50 cm ‘T53’ Structure Since 1999: -Tested about 40 structures with over 30,000 hours of high power operation at NLCTA. -Improved structure preparation procedures - includes various heat treatments and avoidance of high rf surface currents. -Found lower input power structures to be more robust against rf breakdown induced damage (CLIC has ‘pushed’ this further and also shortened the rf pulse length) -Developed NLC-Ready ‘H60’ design with required wakefield suppression features.

Ready for Coupler BrazeAfter Braze Structure Fabrication at SLAC

H60 Structure Cells and Coupler Assembly Cells with Slots for Dipole Mode Damping Port for Extracting Dipole Mode Power Output Coupler CLIC Cells Have Large Waveguide Openings for Faster Damping

Wakefield Damping and Detuning Time of Next Bunch Time After Bunch (ns) Wakefield Amplitude (V/pC/m/mm) Measurements Ohmic Loss Only Damping and Detuning Detuning Only Dipole Mode Density Frequency (GHz)

RF Unit Test in From Eight-Pack 3 dB Beam From Station 2 From Station 1 Powered Eight H60 accelerator structures in NLCTA for 1500 hours at 65 MV/m with 400 ns long pulses at 60 Hz and accelerated beam

Hours of Operation Breakdown Rate History (Goal < 0.1/hr) Four H60 Structures at 65 MV/m  = 400 hr  = 600 hr  = 400 hr Breakdown Rate at 60 Hz (#/hr) with 400 ns Pulses Hours of Operation

High Power (Multi-MW) X-Band Applications Short bunch FELs –Energy Linearizer: in use at LCLS, planned for BNL, PSI, Fermi/Trieste and SPARX/Fascati –Deflecting Cavity for Bunch Length Measurements 100’s of MeV to Many GeV Linacs (presented at this workshop) –LLNL 250 MeV linac for gamma-ray production –Trieste 1 GeV linac extension –Alternative to SC for the proposed 2.25 GeV NLS linac –LANL 6-20 GeV linac for an XFEL source to probe dense matter –2.6 GeV linac for a soft X-ray FEL facility at KVI, U. Groningen, NLD –SLAC 250 MeV concept for a proton linac –SLAC study of a 6 GeV Linac for a Compact XFEL (CXFEL) source

After BC1  z = 227  m Non-linearity limits compression… …and spike drives CSR  z = 200  m X-Band Energy ‘Linearizer’ at LCLS  z = 840  m energy-time correlation X-Band Structure: 0.6 m long, 20 MV

ParametersymbolLCLSCXFELunit Bunch Charge Q 250 pC Electron Energy E 146GeV Emittance  x,y µmµm Peak Current I pk 3.0 kA Energy Spread  E /E % Undulator Period u 31.5cm Und. Parameter K Mean Und. Beta ββ 308m Sat. Length L sat 6030m Sat. Power P sat 3010GW FWHM Pulse Length  80 fs Photons/Pulse NN Compact X-Ray (1.5 Å) FEL

Linac MeV Linac GeV Linac-3 6 GeV BC1BC2 Undulator L = 40 m S RF Gun X undulator LCLS-like injector L ~ 50 m 250 pC,  x,y  0.4  m X-band Linac Driven Compact X-ray FEL X X X-band main linac+BC2 G ~ 70 MV/m, L ~ 150 m Use LCLS injector beam distribution and H60 structure (a/ =0.18) after BC1 LiTrack simulates longitudinal dynamics with wake and obtains 3 kA “uniform” distribution Similar results for T53 structure (a/ =0.13) with 200 pC charge

UnitsCXFELNLC Beam EnergyGeV Bunch ChargenC RF Pulse Width * ns Linac Pulse RateHz120 Beam Bunch Lengthμm56, 7110 Operation Parameters * Allows ~ ns multibunch operation CXFEL wakefield effects are comparable at the upstream end of the linac as the lower bunch charge and shorter bunch length offset the lower energy, however the bunch emittance is 25 times larger

Layout of CXFEL Linac RF Unit 50 MW XL4 100 MW 1.5 us 400 kV 480 MW 150 ns 12 m Nine T53 Structures (a/ = 13%) or Six H60 Structures (a/ = 18%)

UnitsT53H60 Structure TypeConstant E_surface Detuned Lengthcm Filling timens Phase Advance/ Cellπ2/35/6 /λ% Power Needed for = 70 MV/m MW4873 Two Accelerator Structure Types

Assuming 1) Tunnel cost 25 k$/m, AC power + cooling power 2.5 $/Watt 2) Modulator efficiency 70%, Klystron efficiency 55%. Gradient Optimization

Structure Breakdown Rates with 150 ns Pulses 1)H60VG3R scaled at 0.2/hr for 65 MV/m,400 ns, 60Hz 2)T53VG3R scaled at 1/hr for 70 MV/m, 480 ns, 60 Hz 3)Assuming BDR ~ G 26, ~ PW 6 At 70 MV/m, Rate Less Than 1/100hr at 120 Hz

UnitsT53H60 Average RF Phase Offset + Deg2.6 Power Gain4.83 Klystrons per Unit22 Acc. Structures per Unit96 RF Unit Length (Scaled to NLC) m Total RF units1824 Main Linac Lengthm Total Linac Length # m RF Unit for Two Structure Types Operating at 70 MV/m* *Assume 13% RF overhead for waveguide losses + scaled to NLC for single bunch loading compensation # including ML, 50m injector and 20 m BC2 at 2.5 GeV

Transverse Wake Averaged over a Gaussian Bunch Linac-3 Linac-2

Emittance Growth Strength parameter: Emittance growth due to injection jitter xo if  is small: Chao, Richter, Yao For CXFEL, eN= 250 pC,  N =.4  m,  = 0, and Linac-2: E 0 =.25 GeV, E f = 2.5 GeV,  z = 56  m, l= 32 m,  0 = 10 m (  x0 = 90  m) =>  =.14 Linac-3: E 0 = 2.5 GeV, E f = 6 GeV,  z = 7  m, l= 50 m,  0 = 10 m (  x0 = 29  m) =>  =.01 For random misalignment, let x 0 2 -> x rms 2 /M p l cu = a 2 /2  z = 1.6 m (Linac-3)—catch-up distance, estimate of distance to steady-state (for  ~ E  )

Single Bunch Tolerance Summary In both Linac-2 and Linac-3,  short-range, transverse wakefields in H60VG3 are not a major issue in that: An injection jitter of  x0 yields 1% emittance growth in Linac- 2 and.003% in Linac-3 Random misalignment of 1 mm rms, assuming 50 structures in each linac, yields an emittance growth of 1% in Linac-2, 0.1% in Linac-3 With the T53VG3R structure, the jitter and misalignment tolerances are about three times smaller for the same emittance growth. The wake effect is weak mainly because the bunches are very short.

5.59 Cell X-band Gun 200 MV/m at Cathode

X-Band Gun Development (with LLNL) Emittance ~ 0.5 micron for a 250 pC Bunch, Longitudinal Emittance Less Than ½ of that at LCLS Comparison of 4D emittance along the gun computed with ImpactT (‘instant’ space charge) and PIC 3D (‘delayed’ space charge plus wakes with true geometry) at two bunch charges and three laser offsets

Optimization Using Stacked Lasers At NLCTA, will be able to run short laser pulses and stack two pulses. For 250 pC bunches, emittance = 0.3  m (95% particles) with single Gaussian (500 fs FWHM) vs 0.25  m (95% particles) with stack of two Gaussians (300 fs FWHM each).  = 0.76 ps

Linac MeV Linac-2 6 GeV BC X-Band RF Gun X undulator X Linearization Without Higher Harmonic RF

ParameterSym.LCLSXFEL1XFEL2XFEL3unit bunch charge Q pC EnergyE GeV N. emittance  x,y µmµmµmµm peak current I pk kA Slice espread  E /E 0.01~0.1~0.10.1% FWHM fs XFEL1 XFEL2 XFEL3 Adjust R 56 and T 566 to achieve ~ flat 3 kA bunches After BC

ParameterSym.LCLSXFEL1XFEL2XFEL3unit bunch charge Q pC EnergyE14666GeV N. emittance  x,y µmµmµmµm peak current I pk kA Slice espread  E /E % FWHM fs XFEL1 XFEL2 XFEL3 End of Linac With above Longitudinal wake, adjust rf phase to minimize energy spread

If compress at 1.25 GeV and use a laser heater, can achieve 2-3kA with ~60% slice emittance growth 20 pC 250pC

X-Band Revival The 15 year, ~ 100 M$ development of X-band technology for a linear collider produced a suite of robust, high power components. With the low bunch charge being considered for future XFELs, X- band technology affords a low cost, compact means of generating multi-GeV, low emittance bunches. Would operate at gradient/power levels already demonstrated. Modulators industrialized, klystrons will soon be and waveguide and structures can be readily built in industry. To further simply such a linac, a low emittance X-band gun and non-rf linearizing techniques are being developed.