Leaf Spring WPA, Jan 30, 20081 Leaf Spring Inspection/Repair WPA Addendum Joe Howell Jan 30, 2008.

Slides:



Advertisements
Similar presentations
Scales Floor Plans Scaling drawings allow us to draw exceptionally large objects such as houses on any size of paper available to us. To enable this to.
Advertisements

N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Introduction to Precision Metrology
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
Hexagons & Hexagonal Prisms. Hexagons Hexagons are 6 sided shapes. Hexagons can be dimensioned in 2 different ways. 1. Across the faces. 2. Across the.
FRAMES Similar to trusses, frames are generally fixed, load carrying structures. The main difference between a frame and a truss is that in a frame at.
IN-PIPE ISPECTION ROBOT Students: DEL BUFALO GIOVANNI NOTARO GIANLUCA ROVARDI ALESSANDRO Professor: VIKRAM KAPILA Mechatronics Final Project Design.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Pixel Leaf Spring Review, Dec 19, Leaf Spring Review Agenda Leaf spring conditions Mockup testing Planning for the work at P5 Discussion Demonstration.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
ALCPG09 Albuquerque, The new geometry of the ILD muon system in MOKKA N. D’Ascenzo, V. Saveliev, Obninsk State University / DESY U. Schneekloth.
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
BASIC DRAWING USING A GRID Using a grid is a time honored way to begin to understand how to render what we see. It helps us to train our eyes to see in.
Whole genome comparison Kelley Crouse And Greg Matuszek.
Summary: Mechanics - Overview of the MFT in ALICE. - Description of the MFT. - Description of a MFT detection plane. - Environment of the MFT. - Procedure.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
17/02/03Designed by Barry Forbes Graphic Communication Hexagons & Hexagonal Prisms.
Classical Mechanics Lecture 5
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
AHCAL Mechanics status report Karsten Gadow CALICE Collaboration Meeting Argonne,
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Splash Screen. Lesson Menu Five-Minute Check (over Lesson 12–2) Main Idea Example 1:Make a Model.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Frames and insertion Note: Stavelet holder (working) document available on wiki:
Hexagons & Hexagonal Prisms.
Structural Drafting Assembly Clearance Dimensions.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Mickael Frotin– 05/07/2010 EUDET MECHANICAL R&D EUDET news - 1.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The reading is 7.38 mm. The reading is 7.72 mm.
Introduction to Precision Metrology
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Alignment of the CMS Tracker
Front End Test Stand (F.E.T.S.)
ProtoDUNE – DSS Installation, Alignment and QA
Major Changes in D27DT Engine
Update of MVD services and requests
Beam
PANDA Yoke of the Magnet
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Teleconference ACS – FREIA 18th April 2017
Assembly procedure – Inner Region
An Infrared Look at Waterside Plaza: Taken Evening of April 23, ˚F
Low Mass mechanical design
Standard Grade Graphic Communication Credit KI 2010 Q1. Index
Structural Drafting Assignment S-4.
Physics-based simulation for visual computing applications
Revision 1 July 2016.
Epic Roadmap July-Dec 2019 Non Linux Platform Support July-Dec 2018
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

Leaf Spring WPA, Jan 30, Leaf Spring Inspection/Repair WPA Addendum Joe Howell Jan 30, 2008

Leaf Spring WPA, Jan 30, Leaf Spring WPA Addendum Short version of leaf spring inspection/removal work description More details can be found in the Mockup testing review conducted Dec 19 Photos of mockup and tool handling with Surkov platform dimensions sent by M. Eppard on 24Jan08 Mockup raised to 1500 mm (1550 actual) Line mark on floor at 800 mm from the tracker bulkhead

Leaf Spring WPA, Jan 30, Center support barrel The tracker mockup (with cart inside) Photo of tracker inner bore taken July07 Aluminum block to simulate beam pipe support pulley

Leaf Spring WPA, Jan 30, Camera Cart and Mockup

Leaf Spring WPA, Jan 30, Inspection Photo

Leaf Spring WPA, Jan 30, Leaf detachment sequence

Leaf Spring WPA, Jan 30, Handling Cart

Leaf Spring WPA, Jan 30, Handling Tool Handling Tool

Leaf Spring WPA, Jan 30, Additional Notes 2400 mm long cart can be folded in half for easier travel through scaffolding Laptop computer stand to be assembled from framing at TIF Overnight storage requested for cart and tools