ISO 9001 Quality Management System implementation experience in the Agency on Statistics of the Republic of Kazakhstan (ASRK) Zhasser Jarkinbayev, ASRK.

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DG “PROGRAMMING OF THE REGIONAL DEVELOPMENT” OPERATIONAL PROGRAMME “REGIONAL DEVELOPMENT” EVALUATION.
How to Document A Business Management System
Professional Development: Problems and Perspectives Danguolė Subačienė Manager of Personnel Training Division National Audit Office of Lithuania.
PUBLIC SECTOR INTERNAL AUDIT IN THE REPUBLIC OF LITHUANIA Mr. Jonas Vaitkevičius Head of Internal Audit and Financial Control Methodology and Monitoring.
EVULATION OF RESULTS OF WORK OF CIVIL SERVANTS Yuriy Pizhuk, Director of the Department of the Personnel of Government Bodies and Local Self-Government.
Dr. Julian Lo Consulting Director ITIL v3 Expert
Security Controls – What Works
EMS Auditing Definitions
IS Audit Function Knowledge
Quality evaluation and improvement for Internal Audit
Office of Inspector General (OIG) Internal Audit
First Practice - Information Security Management System Implementation and ISO Certification.
Internal Audit reporting to CHU Evelin Pungas Head of Internal Control Coordination Unit Financial Control Department
Quality Management.
Quality Management Systems
SAFA- IFAC Regional SMP Forum
project management office(PMO)
Purpose of the Standards
AUDITS AND INSPECTIONS
Internal Auditing and Outsourcing
1 Educational System of the Official Statistics in the Russian Federation: new methods and approaches Mr. Lev Lovat, Deputy Director of Administrative.
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
Audit of Public Procurement
1 Legal foundations and institutional arrangements on Energy statistics in the Republic of Azerbaijan Yusif Yusifov, Head of division Industry, transport.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Lec#3 Project Quality Management Ghazala Amin. 2 Quality Specialist-Job responsibility Responsibilities Reports monitoring and measurement of processes.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
An Inter-Agency Audit Office of the Chief Inspector General ROAD MAP TO EXCELLENCE IN CONTRACTING.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
November, CANQA project Tempus project SCM BE-SMHES CANQA “Central Asian Network on Quality Assurance and Accreditation” Education.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
1 INTERNAL AUDIT MANUAL Doroteya Manolova Head of CHUIA Ministry of Finance Republic of Bulgaria PEM-PAL IA COP IA Manual Working Session June,
MANAGEMENT SYSTEM AND STRUCTURAL ORGANIZATION FOR THE QUALITY ASSURANCE OF SPs ■ Slovak University of Technology in Bratislava ■ Faculty of Civil Engineering.
A TTRACTING AND RETAINING THE BEST PEOPLE IN THE CIVIL SERVICE Gordana Dimitrovska Head of Public Administration Reform Unit General Secretariat of the.
GLOBAL ASSESSMENT OF STATISTICAL SYSTEM OF KAZAKHSTAN ZHASLAN OMAROV DEPUTY CHAIRMAN, STATISTICS AGENCY OF REPUBLIC OF KAZAKHSTAN. 4.3.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
Meeting of the TEMPUS DoQuP Project –Workshop on “Documentation for Quality Assurance of Study Programs" 1-6 May 2012, Bishkek, Kyrgyzstan Accreditation.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
Practice Management Quality Control
Audit Planning Process
LOGO Personnel satisfaction survey and strategic direction of personnel capacity building in state statistics bodies of the Republic of Belarus National.
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Audit Evidence Process
Information Overview SF: Planning & Programming Workshops for EC Delegation Patrick Colgan & Ján Krištín PROGRAMMING PROCEDURES in Support of Regional.
MGSC/2009/06 Eurostat Strategy for Developing Light Peer Reviews (LPR) for Candidate Countries and Adapted Global Assessments (AGA) for Potential Candidates.
Quality Milestones Elaborate quality system developed over the years “Joint Agenda Building” (JAB) group “Strategic Quality” – Progress report CA/80/04.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Priorities in building up statistics in pre-accession countries Barbara Domaszewicz Agriculture Department, Central Statistical Office of Poland Workshop.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Anna Borowska Civil Service Director
the System of State Statistics in Ukraine
Quality assurance in official statistics
Monitoring and Evaluation using the
European Conference on Quality in Official Statistics
Response to Report on Local Government new risk management and internal audit framework for NSW councils.
Peer review in the Republic of Macedonia
Palestinian Central Bureau of Statistics
Ministry of National Economy of The Republic of Kazakhstan
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
Hanna Gembarzewska, Monika Grabani
System Safety Regulation
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Presentation transcript:

ISO 9001 Quality Management System implementation experience in the Agency on Statistics of the Republic of Kazakhstan (ASRK) Zhasser Jarkinbayev, ASRK Deputy Chairman High level seminar “Quality in Statistics”, Athens, June 2011

List of contents: 1.Introduction 2.Background of ISO 9001 QMS implementation 3.Implementation chronology and actions 4.Progress 5.Issues of concern during implementation 6.Ways forward 7.Conclusions, recommendations, suggestions 2

Introduction  2007 – started implementation of Quality Management System (QMS) that complies with ISO 9001 national standard requirements  Major goal of implementation is to create an environment for the continuous improvement of product and process quality 3

Background of QMS implementation  Within the state management system development program – quality improvement of state services  Recommendations of international experts in statistics  Statistics quality assurance – basis of the Agency development strategy 4

Background of QMS implementation (2) State management system development and quality improvement of state services:  Implementation of standards of state services  Implementation of international ISO 9001 quality standards  Formation of internal and external audit systems 5

Background of QMS implementation (3) Recommendations of international experts in statistics – Global assessment of the statistical system of Kazakhstan (UNECE and UNESCAP) – ASRK Statistical Master Plan for (World Bank) 6

Background of QMS implementation (4) Statistics quality assurance – basis of the Agency development strategy Mission – formation and implementation of the state statistical policy aimed at maximum gratification of users’ needs in quality statistical information. 7

Background of QMS implementation (5) Statistics quality assurance – basis of the Agency development strategy Strategic development plans include:  Quality indicators (user confidence level, etc.)  Quality Management System implementation actions 8

Chronology of QMS implementation 9 Decision of ISO 9001 implementation, formation of the working group and assignment of Quality Manager September 2007 Setting up a structural subdivision to organize QMS implementation and development May-November 2008 December 2008 April 2008 Personnel training, execution of actions to implement QMS National QMS certification

Key project execution activities 10 Conduct a motivation seminar Form and train the working group, assign the quality manager Form and train the group of internal auditors Determine Quality Policy and identify quality objectives Develop the quality guidelines  6 documentary procedures  17 process maps Update regulations on subdivisions and job descriptions Update methodological procedures Regulations on Quality Manager and Coordination Council Analyze the existing management system Describe major processes QMS internal audit QMS certification audit Document ation handling Process manageme nt Personnel develop ment Handle inconsistencies

Certification for ISO 9001 conformity In 2008 QMS of the Agency was certified for conformity with RoK ST ISO 9001 national standard requirements Requirements of RoK ST ISO national standard Requirements of ISO 9001:2008 international standard 11

QMS implementation progress 1. Quality policy and objectives were developed and approved; 2. QMS documentation was developed and is annually updated; 3. Major statistical processes and interprocess communication were identified; 4. User and personnel satisfaction interviews are conducted annually; 5. Documentation management system was improved; 6. Responsibilities and authorities of subdivisions and employees were assigned;

QMS implementation progress (2) Improvement of the RoK legislation in statistics  Submitted data confidentiality and security assurance was identified  Requirement of using initial statistical data was formalized exclusively in order to produce statistical information  Principles of state statistics were formalized  Responsibilities of administrative sources on submission of administrative data were determined  Professional independence guarantees of state statistics authorities were formalized to conduct statistical activities 13

QMS implementation progress (3) 14 User satisfaction,% Scope of the published information Presentation format Adequacy

QMS implementation progress (4) 15 Non-conformity Notification External audit results Unit

Issues of concern during ISO 9001 implementation  Lack of staffing resources  Lack of required knowledge and skills of personnel  Lack of ongoing active support of the management  Formal attitude of personnel due to lack of motivation  No regional subdivisions are involved 16

Ways forward  QMS integration into the general management system  Full description of statistical processes and procedures  Improvement of system of quality indicators  Business-process optimization 17

Implementation and certification in Quality Management System (QMS) in the Agency of Statistics of the Republic of Kazakhstan 2011 Certification of Headquarters ISO 9001: Implementation in regional offices RoK ST ISO

Conclusion, recommendations, suggestions  ISO 9001 implementation positively affected the Agency performance  QMS conformity with ISO 9001 requirements does not provide compliance with all special requirements applicable to statistical products and processes  It is important to provide necessary resources and motivate personnel 19

Conclusions, recommendations, suggestions (2)  A reference standard of basic quality principles is required to organize and provide quality of the statistical activity in the optimal way  May be a special international quality standard for statistical activities should be developed  Assistance of Eurostat and other international organizations in personnel quality training is required for further development 20

Thank you for your attention! 21