Moderator:Richard W. Holtz General Counsel, MassDevelopment Panelists:Bryan Olson Chief of the Federal Facilities Superfund Section, EPA Region 1 Adam.

Slides:



Advertisements
Similar presentations
CASE STUDIES Client:Developer of former Manufactured Gas Utility Plant Property Problem:Developer bought contaminated former plant site to develop for.
Advertisements

EPA CLEANING UP NEW ENGLAND
THE BRAC PROCESS – Not Your Usual Brownfields Redevelopment Mary K. Ryan.
Managing Hazardous Solid Waste and Waste Sites
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
McClellan Reuse: Successes & Challenges 2006 Update Jeanette M. Musil, M.S. Deputy Director Kathy Broderick Senior Reuse Coordinator Sacramento County.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
REVITALIZING CONTAMINATED LANDS: ADDRESSING LIABILITY CONCERNS Susan Kunst Boushell EPA’s Office of Site Remediation Enforcement March 25, 2015.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Stephen TerMaath Chief, BRAC Program Management Division 5 June.
BRAC: GETTING THE NEXT ROUND RIGHT BASE REDEVELOPMENT FORUM NOVEMBER 2014.
Senior Assistant General Counsel
PMOBRAC Ms. Kimberly Kesler Director, BRAC Program Management Office March
Jill Lowe Remedial Project Manager August 7, 2013.
On August 22, 2005 the Federal Base Realignment and Closure (BRAC) Commission voted to close Naval Air Station Brunswick (NASB) NASB is a 3,200 acre property.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
Considerations for Transactions with Environmental Issues Richard M. Fil, Esq.
Who’s Monitoring Land Use Controls on Brownfield Sites? Terri Smith Environmental Liability Management, Inc.
1 Remediation and Redevelopment at the Former Fort Devens, Massachusetts, USA.
Public Buildings Service Real Property Utilization And Disposal Ralph Conner, Director, Office of Real Property Rich Butterworth, Senior Counsel, Real.
Defense Communities Town Hall U.S. Department of Defense Office of Economic Adjustment June 22, 2014 Washington, DC.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e Dr. Stephen TerMaath Chief, BRAC Program Management Division 22.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
Disposition of Excess BRAC Real Property at NAVSTA Newport, RI
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM THE COLLEGE OF NEW JERSEY Thursday, July 23, 2009 B rownfields R edevelopment I nteragency T eam.
Institutional Controls for Real Property Disposal Transactions Kevin Legare Realty Specialist General Services Administration Region One, Boston MA
1 of 19 ASSOCIATION OF THE UNITED STATES ARMY INSTITUTE OF LAND WARFARE “INSTALLATION CAPABILITIES FOR A TRANSFORMED ARMY” October 3, 2005 Joseph W. Whitaker.
E151U: Housing and Urban Development Policy Housing Planning.
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM RUTGERS UNIVERSITY Friday, September 25, 2009 B rownfields R edevelopment I nteragency T eam.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
1 Land Use Controls (LUCs) The Trust concept for long term care Paul J. Yaroschak Director, Environmental Compliance & Restoration Policy Office of the.
Environmental Protection in the United States Christopher Green U.S. Embassy July 13, 2006.
Institutional Controls at BRAC Sites July 19, 2011.
Assistant Chief of Staff for Installation Management Recent Successes 1 Environmental Remediation –Approximately $1B of environmental remediation remains.
Overview of the Land Recycling Program (Voluntary Cleanup Program)
Air & Waste Management Assoc. August 6, 2008 Region 4 RCRA Division Ken Lapierre, Deputy Director.
Summer Institute 2009 Brownfields and Urban Redevelopment A former brownfield site in Lawrence, Massachusetts is rehabilitated into a community recreation.
Office Managers US EPA New England Susan Studlien, Director Office of Site Remediation and Restoration Stephen Perkins, Director Office of Environmental.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
BROWNFIELDS: “Financial and Technical Support for Redevelopment” HAYWOOD COUNTY, NORTH CAROLINA BROWNFIELDS COALITION Presented to: TOWN OF WAYNESVILLE.
1 Base Realignment and Closure (BRAC) The Army’s Approach to Managing Resources 10 August 2005 Mr. Jeff Giangiuli Vice President CALIBRE.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Multnomah County Brownfield Initiative Mapping Health Equity Multnomah County Environmental Health Services.
EPA P-1 Institutional Control Tracking EPA Superfund Perspective November 2006.
Brownfields 101 Federal and State Role in Brownfields Redevelopment Carol Tucker, Section Chief Brownfields Program US EPA New England.
LESSONS LEARNED: A CALIFORNIA PERSPECTIVE Robert L. Elliott, Staff Counsel California Environmental Protection Agency, Department of Toxic Substances Control.
The Dalles, Industrial Certification Northwest Aluminum Company The Dalles, Oregon Douglas C. MacCourt Ater Wynne LLP US German Bilateral Working.
EPA Staying Flexible: Adaptive Management Approaches for Superfund Redevelopment An Enforcement Perspective Helena Healy Branch Chief Office of Site Remediation.
DRAFT The RCRA Cleanup Vision for 2020 “Where are We Going? Matt Hale Director, Office of Solid Waste U.S.EPA.
Revolving Loan Fund Department of Toxic Substances Control Brownfields and Environmental Restoration Program Stewart W. Black Acting Deputy Director Brownfields.
Estimating the Costs of Implementing Institutional Controls Brownfields 2009 New Orleans November 17, 2009 John Pendergrass.
Avoiding Future Shock: Long Term Solutions for Brownfields Ignacio Dayrit, City of Emeryville Brownfields 2004.
Brownfields 2004 September 2004 NTC Orlando Using All the Tools.
THE UNIFORM ENVIRONMENTAL COVENANTS ACT—THE EPA PERSPECTIVE BROWNFIELDS 2009 Michael A. Hendershot Senior Assistant Regional Counsel United States Environmental.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Structuring Deals and Allocating Liability: When the Responsible Party Won’t Take Responsibility The Greenfield Tap and Die Project, Greenfield, Massachusetts.
Financial Assistance 101 Planning for Brownfields Redevelopment Gregory M. Firely, BCES Senior Project Scientist.
BROWNFIELDS 2005 Dealing with Unexpected Contamination Lowry Air Force Base Redevelopment Denver, CO Tom Markham, Executive Director, Lowry Redevelopment.
New and Exciting Opportunities for Federal Property Transfers Michael P. Comodeca Spencer Fane Britt & Browne LLP
Long-Term Stewardship: Ensuring the Safe Use of Contaminated Sites Brownfields 2006 Boston, MA.
2016 ADC TRANSITION POLICY DOCUMENT FORUM. Key Policy Issues.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
Early Property Transfer and Privatized Cleanup at Former Military Bases The McClellan Air Force Base Experience Kathleen Johnson, Federal Facilities and.
Redeveloping Properties with Environmental Issues
A TOUR OF FLORIDA’S BROWNFIELDS REDEVELOPMENT PROGRAM
CERCLA 128(a) Tribal Response Program Site Specific Work: Introduction
McClellan Reuse: Successes & Challenges 2006 Update
Presentation transcript:

Moderator:Richard W. Holtz General Counsel, MassDevelopment Panelists:Bryan Olson Chief of the Federal Facilities Superfund Section, EPA Region 1 Adam Kahn Partner, Foley Hoag LLP Anne Marie Dowd Executive Vice President of Legislative Affairs, MassDevelopment David Hall Senior Vice President, LNR Property Corporation Robert Hallenbeck Senior Vice President for Business Development, XL Insurance Military Base Redevelopment: General and Major Issues, Strategies, and Successes

BRAC Terminology BRAC Terminology BRAC – Base Realignment and Closure BRAC – Base Realignment and Closure LRA – Local Redevelopment Authority LRA – Local Redevelopment Authority BCT – BRAC Cleanup Team BCT – BRAC Cleanup Team RAB – Restoration Advisory Board RAB – Restoration Advisory Board BRAC Rounds BRAC Rounds 1988, 1991, 1993, 1995, , 1991, 1993, 1995, 2005 Overview

New England Military Bases Affected by BRAC Since 1988 Connecticut (19 installations) Connecticut (19 installations) Maine (7 installations) Maine (7 installations) Massachusetts (30 installations) Massachusetts (30 installations) New Hampshire (4 installations) New Hampshire (4 installations) Rhode Island (9 installations) Rhode Island (9 installations) Vermont (1 installation) Vermont (1 installation)

Contaminants Frequently Discovered at Military Bases Fuels Fuels Solvents Solvents Pesticides Pesticides Perchlorate Perchlorate MEC MEC

Significant Players in Cleanup Process Significant Players in Cleanup Process Military Military LRA LRA Regulators Regulators Developers Developers Community Community Cleanup Process

BRAC Property Disposal Overview Phase 1: Redevelopment & Disposal Planning Phase 1: Redevelopment & Disposal Planning Phase 2: Property Disposal Decisions Phase 2: Property Disposal Decisions Phase 3: Property Conveyance Phase 3: Property Conveyance

Conveyance Tools Public Benefit Conveyance Public Benefit Conveyance Homeless Assistance Conveyance Homeless Assistance Conveyance Negotiated Sale Negotiated Sale Advertised Public Sale Advertised Public Sale Environmental Remediation Conveyance Environmental Remediation Conveyance Economic Development Conveyance Economic Development Conveyance Conservation Conveyance Conservation Conveyance Disposal to Depository Institutions Disposal to Depository Institutions Exchanges for Military Construction Exchanges for Military Construction

Environmental Findings National Environmental Policy Act National Environmental Policy Act Environmental Condition of Property Environmental Condition of Property Identification of Uncontaminated Property Identification of Uncontaminated Property Finding of Suitability to Transfer/Lease Finding of Suitability to Transfer/Lease Covenant Deferral Request/ Finding of Suitability for Early Transfer Covenant Deferral Request/ Finding of Suitability for Early Transfer

Land Use/Institutional Controls Private Controls Examples- Deed Restrictions, Restrictive Covenants, Easements, Reversionary Interests Governmental Controls Examples- Ordinances, Zoning Rules, Advisories, Permits Enforcement Tools with IC Components Examples- EPA Orders, Permits or Agreements Informational Devices Example- Deed Notices

Legal Challenges Associated with Military Base Remediation Adam Kahn Foley Hoag LLP Boston, MA

Former Military Bases are Different from Most Other Brownfields Sites  Not “orphan sites”  Sites are normally supposed to be “clean” before transfer  Sites often feature unusual contaminants (MEC/UXO, chemical weapons) or unusual scale  High profile; many NPL listed  From a legal perspective, military bases enjoy significant advantages and suffer significant disadvantages that both help and hinder remediation and redevelopment

The United States’ Statutory Commitment to Cleanup  Main Advantage: Former Military Bases enjoy built-in remediation coverage and liability protection  CERCLA 120(h) covenants -Notice -Cleanup before transfer -Post transfer warranty  Section 330 Indemnification

Why Isn’t the Statutory Scheme Perfect for Brownfields Redevelopment?  Sometimes there is no time to wait for the cleanup to be finished  What cleanup is “necessary and appropriate”? -The difference between “safe” and “useable” -Indoor air pollution/building materials/UXO  Speed and flexibility of the cleanup  What about oil?  How to account for changing reuse plans?  Cleanups “look” different?  Is the best recourse really suing DOD?

Consequences of These Challenges  Disagreements over scope of liability have led to high stakes, multi-year litigation  Some projects have simply located elsewhere  DOD and LRAs have developed creative solutions to use the 120(h) covenants faster and more efficiently for all

Creative Solutions  Privatization to leverage 120(h) commitments to fit into a more contemporary, responsive model  Early transfer agreements  Service agreements  Simple private investment for high value projects  Common theme: Redevelopers are willing to assume certain additional private sector risk in exchange for increased flexibility

Redevelopment of the Former Fort Devens

The Devens Project BRAC ,000 population at its peak 7,000 jobs lost MassDevelopment named LRA May, 1996: MassDevelopment takes title

Reuse Plan Reuse Plan: 8.5M sf of development 5 development zones: Innovation/technology Industrial Housing Business services Corporate campus Protects environmental resources 75 day permitting

Post Transfer Environmental Issues 90% of leased parcels cleaned up and transferred Perchlorate and arsenic concerns abated 6 landfills consolidated Examples of Creative Solutions 200 underground storage tanks removed Asbestos/pesticides removed from housing area Early Transfer of “Thumb” Parcel

Devens Successes  85 Businesses located at Devens  4,200+ Jobs; $220 million annual payroll  250 residents  Its own zip code  $460 million private sector investments  $284 million in state & federal investments  BMS facility

Reasons for Success Experienced and driven governmental LRA Committed environmental partners LRA kept focus on redevelopment schedule and prioritized environmental issues. LRA pursued privatized or negotiated solutions with Army based on that priority

Redevelopment of Former Naval Air Station South Weymouth Brownfields 2006

Thoughtful Integration of Uses: SouthField Master Plan Large Scale. 1,400 acres, 2 square miles “Bigger than Boston ” Community Building Like a new Town, > than 135 MA Towns Over 7,000 people will call it home Five residential villages 2,855 units 1.7 msf office/biotech, 300k sf retail Model of Smart Growth Mixed-use, Transit Oriented 1,007 acres of open space (70%) A Day in the Life – “live, work, play & shop” Responsive to Commonwealth Needs Hi-density, infill development near transit Job Growth – keep Biotech jobs in MA Range of affordable housing types Open Space, recreation & env. Sensitivity

The Private Development Objective A balanced development plan must be… Sustainable for Generations! Good for the Community Good for the Environment Profitable

Characterization of Cleanup Issues NAS South Weymouth History -WWII Airfield for blimps & jets -Low intensity of use -No major nuclear/radiological or UXO -Use did not include heavy industrial/manufacturing Status-NPL listed Superfund Site, plus several State DEP sites -but contamination is routine and manageable Per Navy- “compared to other bases, this one is no-brainer” -$90 million total cost …modest when compared to Hunters Point, some $400 million Specifically-Landfills -Jet fuel spills -Solvent releases -Misc…minor PCB’s, coal ash, metals

Challenges for Private Development Disagreement with DoD over transfer method. Years wasted. Uncertainty over cost & time. No alignment of clean-up sequencing and scheduling. DoD & Regulators not driven by same objectives as private sector Disagreement with DoD over level of clean-up and difficulty integrating with Re-Use Plan and phasing Developer is an “innocent party” – must be shielded from liability. Use of PLL Insurance not appreciated by DoD Difficulty negotiating use restrictions, long–term O&M and DoD “comeback” for unknowns

Solutions Privatization Let developers do what they do best - Execute projects on a critical path with focus on profitability and sustainability. Eliminate Uncertainty & Reduce Risk Don’t shift risk to developer, but make it go away (where possible). Leverage Public Investment Mega-projects but do not work with 100% private funding. Leverage federal dollars & bonding, all on the “increment.” Align Interests, Communicate & Execute with Common Goals