Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012.

Slides:



Advertisements
Similar presentations
Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
Advertisements

H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 11 October 2011.
ZH ➝ ννbb news & plans Ricardo Gonçalo ZH->ννbb phone meeting – 24/1/2012.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011.
VH (H->bb) Cut Flow Status. Introduction Hoping to start the mini-ntuple etc production now Some push over last few days but still not as much as would.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 2 August 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 30 August 2011.
 Take out your rough draft for the essay! If you have it, you will get an A just for bringing it in!
GOOD MORNING! “Editing is the same as quarrelling with writers - same thing exactly. “ ~Harold Ross 14 Oct Please reclaim your English notebooks,
Definition of a Works Cited List
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 5 April 2011.
Introduction Ricardo Goncalo ATLAS-UK Higgs Meeting, 3 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 26 April 2011.
Doc.: IEEE /0038r0 Submission Jan 2012 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report – Jan 2012 Date: Authors:
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 10 May 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 22 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 8 March 2012.
H ➝ bb search and b-tagging Ricardo Gonçalo on behalf of the Higgs subgroup 5.
Search for the Standard Model Higgs boson produced in association with a vector boson and decaying to a b-quark pair with the ATLAS detector at the LHC.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 9 March 2011.
CM-220 Unit 1 Seminar Margaret Baker. Seminar Rules Try to be on time. Be respectful. We will have many people attending, so stay on task. If you enter.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 23 August 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 31 May 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
First ed. board for CERN Council note Ed.board meeting on Friday:
Cornell Notes To help me take organized notes To help me identify keywords and concepts from a lecture To help me skim my notes to locate important information.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 March 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 7 June 2011.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
Number Patterns Miss Koch. Which number is in the HUNDREDS place. Which number is in the TENS place. Which number is in the ONES place. 625.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
HSG5 Report: ongoing activity and 2012 plans Ricardo Gonçalo (RHUL) Higgs Working Group Meeting – 10 May 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 15 November 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 February 2011.
STUDENT LED CONFERENCES FEBRUARY UPDATED SLC SCHEDULE Tuesday, Feb. 9 1st period8:00-9:15 (75) 2nd period9:20-10:35 (75) Lunch10:35-11:15 (40)
Introduction Malachi Schram (McGill), Ricardo Gonçalo (RHUL) H->bb Note Meeting, 15 December 2010.
Texas Nodal Program ERCOT Readiness Update TPTF May 5, 2008.
H->bb Status Ricardo Gonçalo (RHUL) on behalf of the H->bb analysis team HSG5 Meeting, 16 February 2011.
HSG5 Status Paper/note circulation: Reading of draft 1on 24 th April: – Talks by Giacinto and Pippa Inputs for combination: separated WH/ZH for vvbb next.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
Introductions and news Zhijun Liang. News Exotics part of the analysis require the EB to be involved in the early stage of the analysis. Time scale for.
Dana Nau: CMSC 722, AI Planning Licensed under the Creative Commons Attribution-NonCommercial-ShareAlike License:
Fundamentals of Lifespan Development MARCH 3 RD – ORAL PRESENTATION & GROUP PAPER.
TtH(H->bb) searches in ATLAS and CMS Ricardo Gonçalo Collider Cross Talk, 18 October 2012.
News from H->bb Ricardo Gonçalo on behalf of H->bb Note group HSG5 Meeting – 3 Dec
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 16 August 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Doc.: IEEE /0051r1 Submission May 2011 Adrian Stephens, Intel CorporationSlide nd Vice Chair’s Report - May 2011 Date: Authors:
The final steps to the HDA project
nd Vice Chair’s Report - Jan 2011
nd Vice Chair’s Report - May 2011
nd Vice Chair’s Report - July 2011
nd Vice Chair’s Report - Sept 2011
Name: ______________ Date: _______________ Class: _______________
The Well Beings are Back!
Bell Work: Parallel Circuits
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Assembly opportunities
Presentation transcript:

Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012

News! News! News! WH->νlbb and ZH->llbb support note in CDS: ZH->ννbb in CDS (early iteration!): Many thanks to everyone involved!!! – That means YOU! Please check them… maybe still a bit raw – Also please check the authors list and let me know if I missed someone Ricardo Goncalo2

Today… Latest news on H->bb limits etc Latest news on Z peak (and shoulder…) Ricardo Goncalo3

Backup slides Ricardo Goncalo4

Publication Plans From PC/subconveners meeting: – Latest circulation date to ATLAS is 17 th February – Higgs approval to be arranged with Ed.Board In practice: – This means 2 nd February Higgs approval for paper – very little margin – Plan is more clear for WH and ZH->llbb: need good 1 st paper draft – Status is not as good for ννbb yet: work towards including in paper – Boosted VH in a parallel path for now: considering a note for Moriond To gain a few days (if needed): – ZH->ννbb will be submitted as support documentation to be included in paper – This means that we can turn it into CONF note if not in schedule for paper – Now thinking about editors for note Maybe wrong time to mention this but… – Looking into the future, aim to have combined WH analysis for ICHEP including boosted analysis Or before… mention ICHEP to mean up to… – ttH can aim to have published results in same timescale Ricardo Goncalo5