04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Saturday 6:13 – 15:00 STABLE BEAMS  scans etc. 15:00 moved to ADJUST Squeeze to 2 m in two steps 11 – 5 – 2  remarkably smooth  tertiary collimators.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Summary for LPC (March 7th, Ralph Assmann)
Wednesday 23/2 Thanks CRYO!!!.
Another Immortal Fill….
Wednesday 26 October 2011.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application (S. Blanchard).  Updates and modifications of orbit and tune feedbacks. 14h34: Access…  In PT 2 and 8 for power converters: changed modules.  ATLAS access in shadow. 15h58: Access over. Wednesday March 2 nd LHC morning report

TCDI set up:  Set up of TCDI collimators with probe beam in TI2 and TI8 finished  new settings trimmed in with thresholds updated (1 sigma!!) to be changed to 0.25 sigma  new settings in entry of 12:16  Checked the new settings with nominal bunch, trajectories not clean, maybe energy error from SPS, to be confirmed  Losses in TL below 3 mGray at collimators with high Dispersion  Losses on LHC BLMs below warning level TDI angular scan:  worked only on B1  measured beam size at TDI with + 1mrad TDI tilt for different TCP settings (beam edge defined by TCP)  has to be done also for -1 mrad tilt before conclusion Summary of injection studies LHC startup progress (Wolfgang, Malika, Verena)

Settings B LHC startup progress

Settings B LHC startup progress

OFC: changed orbit reference scaling to linear (was cubic/'parabolic->linear->parabolic') OFC: changed default settings for the synchronous orbit acquisition mode for IR BPMs OFC: added a new refined Q' demodulation estimate. OFC & OFSU: modified and resynchronized the communication library. OFSU: restructured and de-synchronized reference orbit handling. Fixed the "Disco effect“. Checked with beam and sequence. Works OK. Summary of Feedback updates and mods: LHC startup progress (Ralph St., Maxim)

15h58: Access over. And another access required  use opportunity to clean out access list…  RB.A81 lost QPS OK when preparing for precycle. Access required. QPS problem due to loss of communication from beam losses at injection. New software.  RQTL111.L3B2 and RCBXH3.R1 tripped, idle at standby. Reset.  Access for damper problem in the SPS (3h).  LHC-b and CMS accesses in shadow.  LBDS access in shadow. Wednesday March 2 nd LHC morning report

18h37: Access over. Pre-cycle.  Lost power permit for S67, S78 and S81. Likely from switching off access during pre-cycle (known problem?).  19h34: RSD2.A78B1 tripped during pre cycle.  One Roman Pot not completed out  interlock. Moved out by TOTEM. 20h43: Beams back. 2 pilot bunches per beam. 21h34: Incorporation problems before ramp. Reference mis-match. 22h10: Start ramp. Then squeeze. Wednesday March 2 nd LHC morning report

00h00: Collisions first time Lumi scan tried. 01h05: Orbit feedback tests completed. Kick response for arc and IR corrector. Different eigenvalues tried. 01h06: MPS test : switch off beta* = 1.5 m. Test successful, no orbit change at time of FMCM dump trigger corresponding to 0.19 A / 335 A, ~ 5E-4. 01h14: Ramp down and precycle. 02h21: LBDS problem for B1. Called Etienne. 02h50: CIBG beam permit loop not ok. Called Bruno. 02h55: Injection B2 only. 03h23: Lost cryo OK for 81 (same as Wed morning). 05h10: Ramp B2. 05h52: Beam dump by EIC. Tune feedback problem. Unclear instructions for feedback operation. Thursday March 3 rd LHC morning report

Beam-beam scan LHC startup progress

Luminosity… LHC startup progress

changed the LHC user for the load ADT settings in the PREPARE COLLISIONS sub-sequence. added the sub-seqeunce to drive the tune feedback settings for the squeeze in the SQUEEZE COMMISSIONING 2011 sequence (to be played as last year, drive the settings takes 20s with FB OFF, start the squeeze and start the QFB when the peak is in the windows) Some more change in the sequences (LP): LHC startup progress

06h39: Injection B2. 07h13: Prepare ramp. Problems with feedbacks (new dynamic function could not be sent to orbit feedback). Not confident to start ramp. No chance to work on beta beat, coupling, … at 3.5 TeV. Beta beat team in all night  thanks… 07h45: Decide to prepare for access:  to repair LBDS and BIS frequency generator problem (connection)  quench heater power supply C22R7  cryo unstable temp sensor on RQF.A81 Thursday March 3 rd LHC morning report

IP beta values (Glenn Vanbavinckhove et al) LHC startup progress Beam1 (after local and global correction): IP  * x (ex)  * y (ey) IP (0.08) 1.62 (0.20) IP (0.18) 1.45 (0.72) Beam2 (after local correction, no global correction): IP  * x (ex)  * y (ey) IP (0.06) 1.62 (0.06) IP (0.16) 1.48 (0.03) 11.7% imbalance 9.5% imbalance

Ahead LHC morning report DayShift Time (h) Activity 3THU7:457 Prepare access. 3THU15:005 Ramp to 3.5 TeV with pilot bunch. 3THU20:004 Transverse damper for multi-bunch 4FRI0:008 Beta beat, coupling, beta* correction at 3.5 TeV, pilot bunch 4FRI8:001 BLM tests of new software 4FRI9:008 Trial ramp to 3.5 TeV with 1 nominal bunch (RF blowup, orbit, emittance, damper,...) 4FRI17:008 Collimation setup 3.5 TeV before squeeze, 1 nominal bunch 4SAT1:006 Qualification dump protection, injection protection, collimation 4SAT7:008 Injection and dump setup (higher intensity, MP, …) 4SAT15:008 Collimation setup 3.5 TeV before squeeze, 1 nominal bunch 4SAT23:008 tbd 5SUN7:008 Collimation setup 3.5 TeV before squeeze, 1 nominal bunch 5SUN15:008 tbd 11 hours access in last 24h and more to come…