1 Working Group 1: Decision-Making and the EBS Design Process in the Safety Case EBS-4 Workshop Tokyo, Japan 14 September 2006 附件二.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
D:\data\PowerPoint\Maravic\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
Victorian Curriculum and Assessment Authority
Lessons Learned in Initiating and Conducting Risk Assessments within a Risk Analysis Framework: A FDA/CFSAN Approach Robert Buchanan DHHS Food and Drug.
Consistency of Assessment
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
J.M. Iriondo 1, N. Maxted 2, S. Kell 2, B. Ford-Lloyd 2 & C. Lara 1 1 Universidad Rey Juan Carlos, Madrid, Spain 2 University of Birmingham, UK Towards.
Set-Based Design Our operating assumption is that we want to be better designers and we are looking for ways to improve our techniques.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
1 1 CMSCB3004 Systems, Cybernetics and Management Hard Systems Thinking.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
I n t e g r a t I n g C S S Practitioner Module 3 Module 3: CSS and Livability In Area Wide Planning.
Strengths 1.Describes clearly the intrinsic value of the Delta and its economy and documents the many public-good services provided by the Delta 2.Provides.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Performance Measurement and Analysis for Health Organizations
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
The Aarhus & Espoo Conventions Making implementation work for stakeholders.
Phase 1 Studies Update Quarterly Public Meeting May 22, 2013.
INFORMATION ASSURANCE USING C OBI T MEYCOR C OBI T CSA & MEYCOR C OBI T AG TOOLS.
Classroom Assessments Checklists, Rating Scales, and Rubrics
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Segment SCD 4.3 Module SCD 4: Safety Case Segment SCD 4.3 Documentation and use of the safety case.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
European Operational Concept Validation Methodology E-OCVM Version 3: What’s New Episode 3 - CAATS II Final Dissemination Event Matthias Poppe DFS Episode.
Monitoring & Evaluation Presentation for Technical Assistance Unit, National Treasury 19 August 2004 Fia van Rensburg.
Consideration for Stakeholders Regarding Hazard Identification and Risk Assessment as Part of the MSD Prevention Strategy for Ontario Richard Wells University.
Managing deviations from the Design Target with the Safety Case IAEA GEOSAF II Plenary 2014.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
US Army Corps of Engineers South Atlantic Division One Corps Serving The Army and the Nation US Army Corps of Engineers South Atlantic Division One Corps.
Human Intrusion and Future Human Actions in relation to Disposal of Radioactive Waste TM September 24, 2012 Presented by: L. Bailey on behalf of.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Nicolas Solente Workshop on Regulatory Requirements to Ensure Safe Disposal of Disused Sealed Sources for Operators and Regulators Amman, JORDAN 7-11 April.
IAEA ANSN RWMTG National Workshop: Application of IAEA Methodology and Tools for the Safety Case and Safety Assessment for Predisposal Management of Radioactive.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
An overview of multi-criteria analysis techniques The main role of the techniques is to deal with the difficulties that human decision-makers have been.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
International Atomic Energy Agency Group 3 Moderator: Jack Rapporteur: Joerg.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
DESIGNING A PUBLIC PARTICIPATION PROGRAM. By the time you select techniques you should know The target stakeholders What has to be accomplished with them.
Assessment of Technology Options 1 Naomi Radke, seecon international GmbH.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Preliminary Analysis of Alternatives for the Long Term Management of Mercury John Vierow Science Applications International Corp. Reston, VA May 1, 2002.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
URBAN STREAM REHABILITATION. The URBEM Framework.
Adaptive Integrated Framework (AIF): a new methodology for managing impacts of multiple stressors in coastal ecosystems A bit more on AIF, project components.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Workshop on Disproportionate Costs, 10./ Copenhagen Summary and draft conclusions 11 April 2008.
Aspect 1 Defining the problem - Problem: The design context will normally offer a variety of potential problems to solve. A focused problem and need is.
IAEA International Atomic Energy Agency TM Technical Meeting to Discuss Human Intrusion and Future Human Actions in relation to Disposal of Radioactive.
BTEC IT Unit 01 Whole Unit Guidance Mr C Johnston ICT Teacher
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
Stages of Research and Development
Software Quality Control and Quality Assurance: Introduction
EBS-4 Workshop Tokyo, Japan 15 September 2006
Internal assessment criteria
Claire NAUWELAERS, independent policy expert
Safety Case Components and Documentation
URBAN STREAM REHABILITATION
Introduction: IAEA activities / Documents on human intrusion
Addressing Future Human Actions for Safety Assessment
Analysis of the notification of compensatory measures
Presentation transcript:

1 Working Group 1: Decision-Making and the EBS Design Process in the Safety Case EBS-4 Workshop Tokyo, Japan 14 September 2006 附件二

2 Working Group 1 Chair: A. Hooper (Nirex, UK) Rapporteur: J. Bel (ONDRAF/NIRAS, Belgium) Participants: –APTED, Mick –BENNETT, David –GUNNARSSON, David –JOHNSON, Lawrence –KAKU, Kenichi –KITAYAMA, Kazumi –MOHANTY, Sitakanta –PAKSY, Andras –PELLIGRINI, Delphine –SEVOUGIAN, David –Shyu, Yuan-horn –UEDA, Hiroyushi –UMEKI, Hiroyuki –VAHANEN, Marjut –WOLLRATH, Jürgen

3 WG1 – Decision-Making & EBS Design in the Safety Case Optimization, Balancing Multiple Design Factors 1.What are the main safety functions addressed by the EBS over time? What methods exist for analysis of safety functions? 2.How does one define and attribute safety functions and their indicators for EBS? How do process understanding, on safety indicators or functions, translate into design requirements? 3.What factors are considered in EBS design, and how are they balanced? How are engineering feasibility, practicality, and cost balanced with respect to operational and long-term safety and other requirements? 4.How are possible design alternatives selected, justified and managed? 5.Is the concept of “best available techniques” applied and if so, how? By what criteria is “best” defined? How could the concept be interpreted over the timeframes for geologic disposal?

4 3. What factors are considered in EBS design, and how are they balanced? How are engineering feasibility, practicality, and cost balanced with respect to operational and long-term safety and other requirements? (1/2) Optimisation process : Safety basis (pillars) has to be defined before optimisation No international, unique prescription for optimisation Depends on stage of program and it is an iterative process (in each stage optimisation can be considered but at different levels of detail) Observation: optimisation is difficult if important uncertainties remain A target and methodology is required to guide optimisation In some cases, design is modified to accommodate very low probability scenarios Ranking of system requirements (ranging from musts” to “shoulds” to “nice-to- haves”) is essential to guide an efficient process Cost should not be the overriding driving force in the optimisation process

5 3. What factors are considered in EBS design, and how are they balanced? How are engineering feasibility, practicality, and cost balanced with respect to operational and long-term safety and other requirements? (2/2) Decisional process: How formal does this decisional process has to be ? Decisions should be well-documented Depends on the stage of the program but framework is useful from the beginning Integration between engineering (design+construction) and safety analysis has to be achieved at each stage in the process (nature and level of integration depend on stage) Frequent review of the design is necessary (continual process) Be sure that all requirements have been considered Optimisation is a creative process While there is a clear need for record of decisions and for a requirement management structure, this does not provide the answer

6 4.How are possible design alternatives selected, justified and managed? Design alternatives exist to address different types of uncertainties (e.g. host rock, site conditions, process uncertainties,…. ) High level requirements should be well defined, justified and ranked; they may change (e.g. dose limits) as the program progresses Requirements will evolve as a consequence of changes in design Multiple methodologies exist to support the selection process (e.g. multi- criterion analysis) but it will always entail subjective judgement Re-evaluate design alternatives after each iteration of safety assessment or selective process analysis Prudent to carry alternatives in early stage

7 WG1 – Decision-Making & EBS Design in the Safety Case Iterative Process, Relationship to Performance Assessments and Safety Assessments 6.What are the roles of uncertainty and of sensitivity analysis in decision-making, and in establishing priorities for confirmation of performance ? 7.What are the criteria used to determine an adequate margin of safety, and how is this shown in view of the uncertainties? 8.What are the reasons and the procedures used to justify design modifications, or even a change to a different design concept? Based on what data? What are the lessons learnt from organizations that have already conducted such an iterative process? 9.How are the consequences of design changes incorporated back into Safety Assessment?

8 6.What are the roles of uncertainty and of sensitivity analysis in decision-making related to the design, and in establishing priorities for confirmation of the performance of the design ? Identify uncertainties in design parameters and environmental conditions, and incorporate these uncertainties through a set of sensitivity analysis Rank uncertainties through sensitivity analysis and “uncertainty importance” Identification of important parameters and associated uncertainties allows to define priorities for future program for the reduction of uncertainties in the important design parameters Sensitivity analysis may help in defining the degree of robustness of the design (robustness is defined as the resilience of a design to the credible range of conditions it will experience)

9 7.What are the criteria used to determine an adequate margin of safety, and how is this shown in view of the uncertainties? Provocative question! (1/2) Margins of safety are not imposed by regulations and standards Margin of safety is not necessary if uncertainties are properly accounted for: Uncertainties are typically included in the assessments Assessments often use conservative assumptions Margin of safety ultimately has to be evaluated by the regulator Margin of safety (numerical indicator) is not the same thing as conservatism (approach) What margin of safety is needed to decide no further optimisation is required => depends on strategy of waste management agency regarding the safety case Safety relies more on the system robustness than on a safety margin No precise prescription of margin of safety seems necessary Difference between safety margin of overall system or performance margin of a given component

10 7.What are the criteria used to determine an adequate margin of safety, and how is this shown in view of the uncertainties? Provocative question! (2/2) Rather than margin of safety, think of strength in depth: Reserve functions in the EBS-design Design tolerances in the EBS properties and characteristics

11 8.What are the reasons and the procedures used to justify design modifications, or even a change to a different design concept? Based on what data? What are the lessons learnt from organizations that have already conducted such an iterative process? (1/3) Possible reasons for modification Results from testing and characterization (lab, small or large scale, in situ) Changes in the boundary conditions (waste inventory) Scenario analysis and modelling (Peer) reviews & comments from regulator or other stakeholders New regulations Change of candidate-sites More general: changes in requirements give rise to modifications

12 8. What are the reasons and the procedures used to justify design modifications, or even a change to a different design concept? Based on what data? What are the lessons learnt from organizations that have already conducted such an iterative process? (2/3) Procedures used to justify design modifications: need is self- evident Based on what data ? Exchange of information among engineering, geo-science and PA (e.g. effect of inflow on function of bentonite, potential for rock fall on function of canister integrity,…) Important to keep records of the basis of comparison of the designs

13 8.What are the reasons and the procedures used to justify design modifications, or even a change to a different design concept? Based on what data? What are the lessons learnt from organizations that have already conducted such an iterative process? (3/3) Lessons learnt from organizations Inflexibility/inertia may occur if design is defined in too much detail (science + PA  design) Stakeholder views and changes in regulations, program strategy and site characterization may lead to changes in design Level of design details required for PA is less than for engineering Importance of FEP’s may evolve (PA, science, perception) Insufficiently realistic design assumptions & oversimplified design concepts may lead to the need to re-design at a later stage (e.g. early failure, concrete liner,..) Well-defined demonstration tests (of implementation at large scale) at an early stage are important Requirements other than LT safety have to be considered in an early stage of the program (this is not the case in some programs) Design lay-out as you go in response to real site conditions Integration (science, PA, engineering) at an early stage is essential

14 9.How are the consequences of design changes incorporated back into SA ? Obviously by updating models Important design changes may modify FEP’s screening and may lead to changes in SA models or scenarios Consequences should be recorded in direct comparison between designs Guidance for new R&D Full or focused SA should be performed as appropriate