LBT Q1 2007 Engineering Review DAQ. 19-Apr-2007LBT Q1 2007 Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.

Slides:



Advertisements
Similar presentations
Temperature Sensors By Grant Stucker.
Advertisements

Coriolis Technology.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Lecture Notes Part 4 ET 483b Sequential Control and Data Acquisition
HVAC CONTROLS (See section 18.9)
Applied Sensor Technology. Outline Introduction Examples of Sensors Basic readout electronics Semiconductor detectors.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
Aircraft Response to Control Input Data Collection System Presenter: Curtis Cutright Advisor: Dr. Michael Braasch Project Sponsor: JUP.
AUTOMATIC INDUSTRIAL STATION FOR VEHICLES EQUIPPED WITH INTELLIGENT VALVES 30/09/03.
EKT314/4 Electronic Instrumentation
PS fork equipped with 8 semiconductor (4 by arm) strain gauges.
Instrumentation (AMME2700) 1 Instrumentation Dr. Xiaofeng Wu.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
ICOM 5047 – Progress Report – The Smart Health Station November 2, Axel Vigo Josué Acevedo Pedro J. Franceschi Wilfredo Torres.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Biomedical Electrodes, Sensors, and Transducers
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
NSTX GMS-4 February 21, 2003 J. Menard Status of NSTX internal RWM/EF sensor system and electronics J. Menard for NSTX GMS-WG.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Temperature Back to Basics RTDs (Resistance Temperature Detectors)
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
Temperature Sensors.
Temperature Sensors.
By Anupam Prakash (3RD YR EIE) ROLL NO.:
ProtoDUNE SP – Slow control temperature readout setup test
Christian Veelken last updated 11/09/06
TEMPERATURE SENSOR LOCATIONS
Independent solar power PIR motion sensor
Lesson 10: Sensor and Transducer Electrical Characteristics
RUN-4 has finished About 70 (!!!) billions of candidate tracks collected up to now About 20 (!!!) billions of candidate tracks collected in RUN-4.
Series 5300 Lithium Cell Formation System
Test Beamline System Requirements and Charge to PDR Committee
Presentation transcript:

LBT Q Engineering Review DAQ

19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A Interface directly to the Agilent 34970A Absolute accuracy better than 0.5° C Absolute accuracy better than 0.5° C Resolution better than 0.05°C Resolution better than 0.05°C Measurement range at least -25°C to +35°C Measurement range at least -25°C to +35°C Locations (symmetrical left and right) Locations (symmetrical left and right) C-ring extension, M3 swing arm height, front and rear C-ring extension, M3 swing arm height, front and rear C-ring extension, M2 swing arm height, front and rear C-ring extension, M2 swing arm height, front and rear Telescope rear counterweights on the C-ring outside Telescope rear counterweights on the C-ring outside

19-Apr-2007LBT Q Engineering Review Housekeeping System Basic Design RTD (Resistance Temperature Detector) RTD (Resistance Temperature Detector) 4-wire installation 4-wire installation

19-Apr-2007LBT Q Engineering Review Highlights (Q1/2007) Basic design finished Basic design finished Procured sensors for testing Procured sensors for testing Installed two test sensors Installed two test sensors Surface temperature Surface temperature Air temperature Air temperature Data collection and analysis begun Data collection and analysis begun

19-Apr-2007LBT Q Engineering Review

19-Apr-2007LBT Q Engineering Review

19-Apr-2007LBT Q Engineering Review

19-Apr-2007LBT Q Engineering Review

19-Apr-2007LBT Q Engineering Review Open Issues Technical Technical Signal noise Signal noise Shielding Shielding Sensor placement Sensor placement Fragile Fragile Avoid blocking access for maintenance Avoid blocking access for maintenance

19-Apr-2007LBT Q Engineering Review Open Issues Schedule Schedule Installation requires telescope access Installation requires telescope access Financial Financial None None Resource Resource Personnel for fabrication and installation Personnel for fabrication and installation

19-Apr-2007LBT Q Engineering Review Progress (Q1/2007) Completed basic design Completed basic design Testing Testing Installed surface temperature sensor Installed surface temperature sensor Collected two weeks of data Collected two weeks of data Installed air temperature sensor Installed air temperature sensor Currently collecting data Currently collecting data

19-Apr-2007LBT Q Engineering Review Planning (Q2/2007) Data Analysis Data Analysis Procurement of additional sensors Procurement of additional sensors Installation of additional sensors Installation of additional sensors