David K. Paylor Virginia State Board of Health March 17, 2016.

Slides:



Advertisements
Similar presentations
A TECHNICAL REVIEW OF THE NAS FINAL REPORT ON CCB PLACEMENT AT COAL MINES KIMERY C VORIES OFFICE OF SURFACE MINING.
Advertisements

1 EPA’s Proposed Rule for Coal Combustion Residuals Betsy Devlin, Associate Director Materials Recovery & Waste Management Division.
Coal Combustion Products and Electronic Waste Sean M. Sullivan Williams Mullen 301 Fayetteville Street, Suite 1700 Raleigh, NC (919)
Coal Combustion Residuals Proposed Regulation Air and Waste Management Association Southern Section August 6, 2010.
Division of Waste Management Solid Waste Section January 12, 2012 Coal Combustion Residuals Regulatory Framework Implemented by the Division of Waste Management.
The Regulatory Assistance Project 50 State Street, Suite 3 Montpelier, VT Phone: web: NASUCA Mid-Year Meeting.
The Process of Siting and Approving a New Landfill in Ontario
S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.
The Past, Present and Future of Coal Ash Management in Virginia Presentation to the State Water Commission June 23, 2014.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
Michele Robertson, PG Is Deep Injection a Disposal Option in Arizona? GATEKEEPER REGULATORY ROUNDUP 2011 February 16, 2011.
U.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61) Uranium and Thorium Mill Tailings (40 CFR Part 192) Andrea Cherepy, Phil Egidi, Reid.
From Power to Poison: How coal waste puts public health at risk Donna Wong-Gibbons, Ph.D. Public Health Specialist, Plains Justice Ash spill from TVA Kingston.
Rochelle Routman, PG Environmental Specialist Georgia Power
Coal Ash Ponds The Romeo and Juliet Story of Coal Fired Power Plants Society sees them as toxic together, but currently, one cannot exist without the other.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
By Nick Garlisch What is Coal Ash? Coal ash is what remains after coal is burned When coal is burned, roughly 10% of the coal.
Managing coal combustion residues Information from: Managing Coal Combustion Residues in Mines Committee on Mine Placement of Coal Combustion Wastes,
2014 Dan River Ash Release-Summary and Update NC Water Resources Congress October 30, 2014.
Tennessee Valley Authority (TVA) Kingston Fossil Plant Knoxville.
Kara Denney Industrial Wastewater Permit Writer Water Quality Division.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Protecting Water Resources: The U.S. Legal Framework Babette J. Neuberger, JD, MPH Associate Dean for Academic Affairs University of Illinois at Chicago.
What’s In Your Water? A Discussion of Threats To Virginia’s Water Quality March 27-­28, 2015 William and Mary School of Law Dr. John L. Daniels, P.E. Professor.
Robert L. Burns, Jr., Esq. Buchanan Ingersoll & Rooney PC August 1, 2013 Impact of Environmental Regulation on Coal Combustion for Electrical.
Overview of Environmental Regulations and Drought Impacts in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT July 13, 2015.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Adem.alabama.gov Coal Combustion Waste Regulation Stephen A. Cobb Governmental Hazardous Waste Branch Land Division.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Wireless Password: Tri-State Generation and Transmission Association is… … a wholesale electric power supply cooperative with 44 member.
Coal Combustion Residuals Final Regulation August 19, 2015 Frank Ney U.S. Environmental Protection Agency – Region 4.
CCR Final Rule Utility Perspective on Key Compliance Items
CCR Rule: Consultant’s Perspective 2015 Air & Waste Management Association Meeting Callaway Gardens, GA Presented by: Randy Sullivan, Principal & Senior.
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
Jim Roewer Executive Director USWAG. CCR Background 1993 and 2000 Bevill Amendment Regulatory Determinations – Coal Combustion Residuals (CCR) do not.
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
EPA’s Proposed CCB Regulations & Morgantown STAR Project 1 Shawn A. Seaman September 27, 2010
TCEQ Environmental Trade Fair
Update & Overview of the Coal Combustion Residuals Proposed Rule United States Environmental Protection Agency Region 4 Frank Ney February
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
PowerSouth Energy Cooperative:
SPCC & CCP Issues Jim Roewer APPA E&O Conference April 12, 2006.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
2015 Coal Handling and Storage Conference
Eco·Systems, Inc.. Beneficial Reuse of Industrial Byproducts Definition- turning an industrial byproduct into a valuable commodity Examples – Coal Combustion.
Rules and Exceptions - The Costs of “Cheap” Coal.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
Division of Water Quality Coal Ash Storage, Use, & Disposal: Update Ted L. Bush, Chief Aquifer Protection Section Division of Water Quality “To protect.
Water Quality Rulemaking in Response to S.L
MICHAEL E. SCOTT, DEPUTY DIRECTOR DIVISION OF WASTE MANAGEMENT Available Information on the Beneficial Reuse of Coal Combustion Products 1.
NPDES Permitting for Coal Ash Ponds in North Carolina EMC Meeting January 12, 2012 Sergei Chernikov, Ph.D. 1.
Beth Blalock, Asst. Chief Land Protection Branch GEORGIA EPD LAND PROTECTION BRANCH UPDATE MARCH 2016.
Hazardous Waste Management.  Introduction  Classification of Hazardous Waste  Basic Approach in Hazardous Waste Management  Treatment of Hazardous.
COAL ASH 101 with Elizabeth Scrafford. What’s the deal with Coal Ash Agenda Agenda ●Coal Ash is a byproduct of burning coal and contains high levels of.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Gary J. Pendergrass, PE, RG Midwest Environmental Compliance Conference May 13, 2015 | Overland Park, Kansas USEPA Coal Combustion Residuals Rule: Impact.
Department of Environmental Quality
Overview Recently Adopted Regulations Proposed Regulations
Clean Water Act Regulations affecting Electric Utilities
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
Resource Conservation and Recovery Act (RCRA)
Georgia Update Jeff Cown Land Protection Branch
Water Quality Rulemaking in Response to S.L
Department of Environmental Quality
SB 807 Implementation Status Update October 2018
Chesterfield Neighborhood Coal Ash Update January 9th, 2019
Senator Dance Town Hall Coal Ash Update December 5, 2018
May 15, 2018 David Paylor, Director
Presentation transcript:

David K. Paylor Virginia State Board of Health March 17, 2016

Residue generated from burning coal. Generally disposal is onsite disposal or beneficially reused Ash has a large variety of constituents, it mostly consists of silicon oxide, iron oxide, and aluminum oxide. Trace amounts of arsenic, selenium, mercury and other metals Ash composition varies widely depending on the coal type and origin, burning regime and air pollution control equipment 2 What is Coal Ash:

Landfill 8 Active Landfills in Virginia Surface Impoundment 12 active surface impoundments at 7 facilities operated by 3 owners Beneficial Reuse Structural fill, concrete, wall board, agricultural 3 Management Alternatives

Regulated Ponds in Virginia 4

5 Virginia’s Ash Impoundments CompanyLocation# of Active Units DominionBremo Bluff2 DominionChesapeake Energy1 DominionChesterfield2 DominionPossum Point 1 2 American Electric PowerGlen Lyn1 American Electric PowerClinch River2 Celanese, llcNarrows1 Mead WestvacoCovington1 1 Recently discovered an additional inactive impoundment at this site

Impoundments constructed with a natural clay liner Ash transported with water to impoundment 6 Surface Impoundment Operations Solids settle, overflow water discharged to surface water under a VPDES permit

Background EPA Final Rule on Disposal of Coal Combustion Residuals In 2008, a large coal ash spill occurred at the Tennessee Valley Authority (TVA) power plant in Kingston, TN This spill prompted EPA to assess coal ash surface impoundments and gather information from facilities managing coal ash nationwide. In 2010, EPA proposed regulations under RCRA to address the risks from the disposal of CCRs generated from the combustion of coal at electric utilities and independent power producers. During the course of the proposed rule-making, the Dan River coal ash spill occurred from the Eden, N.C. Duke facility and was included in the cases considered by EPA in the rule-making Rule establishes national minimum criteria for the disposal of CCR in landfills and surface impoundments. Final Rule Effective Date October 19, 2015

Surface Impoundments 2015 EPA Final Rule on the Disposal of Coal Combustion Residuals Provides operational and closure standards for new and existing surface impoundments Provides closure requirements for inactive impoundments Inactive impoundments are those that have not accepted CCR after October 19, 2015 and contain free liquids and are on the property of the generator Rule provides station owner with two closure options – capping in place or removal For either option first step is to remove water from the ponds Virginia Solid Waste Management Regulations Virginia Waste Management Board adopted and incorporated EPA Final Rule (December 4, 2015) Provides technical requirements for closure and post-closure of surface impoundments Provides a permitting process

Proposed Dewatering Discharges Dewatering needs to occur regardless of type of closure Dewatering will entail: Initial draw-down of the impounded waters Approximately 150 MG to occur over days Maximum flow of 2.88 MGD Continued dewatering over the closure period Spring of 2018 Compliance with effluent limits prior to discharge

Surface Impoundments Solid Waste Permit Provisions Review and Approval of Closure/Cap Groundwater Monitoring Surface Water Monitoring Cost-Estimates and Financial Assurance Post-Closure Plan/Cap Maintenance Public Participation Process

Dominion – Possum Point Power Station Existing 1845 MW natural gas and oil fired steam electric generating station Ceased using coal in March 2003 Five ash ponds Ash Pond A, B, C Complex Ash Pond D Ash Pond E

Major Areas of Concern Public Process & Extension of Comment Period Sufficiency of Permitting Documentation Technology-Based Effluent Limits Protection of Water Quality & Beneficial Uses - Effluent limits not protective - Not adequate protection of fishery and wildlife - No limits on discharge volume - Discharge will contribute to the existing impairment - Insufficient monitoring - Ash Pond D toe drain