APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …

Slides:



Advertisements
Similar presentations
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Accelerating Polarized Protons Mei Bai Collider Accelerator Department Brookhaven National Laboratory PHNIX Focus, Feb. 24,
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
RHIC pp 500 GeV development M. Bai C-A Department.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
J-PARC Spin Physics Workshop1 Polarized Proton Acceleration in J-PARC M. Bai Brookhaven National Laboratory.
RHIC Store Energy Scan Mei Bai Collider Accelerator Dept. Brookhaven National Laboratory.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
Thomas Roser Derbenev Symposium August 2-3, 2010 Polarized Beam Acceleration In their seminal paper “Radiative Polarization: Obtaining, Control, Using”
APEX Schedule April :30am12:30pm5pm IBS suppression lattice Litvinenko, Tepikian +team Back 2 Phys 4pm Nonlinear Chromaticity (Response.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
ApEx needs for CeC PoP Experiment December 11, 2015.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
-9:00: Test IP transverse adjustment (CMS) and optics verification.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Summary for LPC (March 7th, Ralph Assmann)
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Racetrack Booster Option & Initial Spin Tracking Results
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Progress Update on the Electron Polarization Study in the JLEIC
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
100th FCC-ee Optics Design Meeting
Report on Electron Polarization Study
Presentation transcript:

APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …

Goal  Accelerate full intensity beams(>1.0x10^9 bunch intensity, 111x111) to store energy with vertical betatron tune at ~0.325(0.342) or closer to 1/3  Demonstrate the reproducibility of the ramp

Motivation 7/10 resonance 11/16 resonance 3/4 resonance Working pt for 250 GeV run

Current Status: Au104third  Developed ramp Au104third  Working point at Qx=31.31(Yellow),31.36(Blue), Qy=32.325(Yellow), Qy=32.343(Blue  Beta* at IP6 and IP8 gets squeezed from 10m at injection to 0.7m at store during acceleration  23 Blue bunches and 56 Yellow bunches made to store energy with ~1x10^11 bunches intensity  Blue working pt: 0.358, and Yellow working pt: 0.31,  Bunch intensity is about ~1.x10^11  Tried 111x111 ramp, but failed due to permit pull triggered by beam losses in Blue  Correlated with beta* squeeze below 1m.

Status of Au104third development 23 blue by 56 yellow bunches 0.3% lower energy than store

Remaining Issues Losses creep up when beta* goes ~1.2m and below

Remaining Issues 111 blue by 111 yellow bunches Qy in Blue = 0.342

Current Status: Au104third2  Design the ramp to Au104third2  beta* squeeze from 1.7m to 0.7m is stopped for the final part of the ramp  Test Au104third2 by Don and other ps experts without beam  QPA table was tunned for this ramp  No beam work yet

Plans for coming APEX session  Switch from the current physics ramp Au106 to Au104third2: 2 hours  Develop Au104third2 with 6x6 in each ring with tune/coupling feedback  Once achieve >90% transmission efficiency, increase the number of bunches until 111 per ring. Orbit correction and optical adjustment when needed  Repeat the ramp for 4-5 times.

APEX Studies: Spin tune Change due to Orbital Angle at Snakes Vadim, Mei, Thomas

Spin tune versus snake orbit angle Example of measurements done in Blue at 250 GeV Making use of the depolarization by 0.75 (second order) spin resonance: - vertical betatron tune is put sufficiently close to 0.75 (in this example, Q y = 0.73) -gradual change of the snake orbit angles causes the spin tune shift from ½ and therefore the shift of spin resonance from the depolarization is observed when the spin resonance shifted to the location of Q y Making use of the depolarization by 0.75 (second order) spin resonance: - vertical betatron tune is put sufficiently close to 0.75 (in this example, Q y = 0.73) -gradual change of the snake orbit angles causes the spin tune shift from ½ and therefore the shift of spin resonance from the depolarization is observed when the spin resonance shifted to the location of Q y Goals: To verify analytical formulas for spin tune dependence on snake orbit angle To verify the value of the spin tune itself Goals: To verify analytical formulas for spin tune dependence on snake orbit angle To verify the value of the spin tune itself Horizontal orbit angle measured, using BPMs, at 3 o’clock snake minus similar angle measured at 9 o’clock snake Prepared by Vadim

Spin tune versus snake orbit angle (2) Spin tune shift due to a snake error Orbit angle measurement error: BPM offsets, quad misalignments shift - measured snake orbit angle difference Conversion of the measured orbit angles to the spin tune shift, using the analytical formula works very well! The depolarization happens at the locations of the vertical betatron tunes during the measurements (dashed lines) Conversion of the measured orbit angles to the spin tune shift, using the analytical formula works very well! The depolarization happens at the locations of the vertical betatron tunes during the measurements (dashed lines) Measurements done at two different energies allows to calculate  sp and  0 (for Blue beam):  sp = 4.4 (+-2.5) consistent with small energy dependence of spin rotation by the snakes  0 = 17 (+-15) murad - consistent with reversed BPM offsets (~24 murad) Measurements done at two different energies allows to calculate  sp and  0 (for Blue beam):  sp = 4.4 (+-2.5) consistent with small energy dependence of spin rotation by the snakes  0 = 17 (+-15) murad - consistent with reversed BPM offsets (~24 murad) 250 GeV 100 GeV Prepared by Vadim