SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.

Slides:



Advertisements
Similar presentations
8th February 2011Electronics for Commissioning1 Signal characteristics. Readout & electronics overview. Plan.
Advertisements

D EVELOPMENT & T ESTING : ADC BOARD FOR THE P ROMETEO T EST - BENCH MATTHEW SPOOR University of the Witwatersrand HEPP 2015.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
An Online Calorimeter Trigger for Removing Outsiders from Particle Beam CalibrationTests Denis O. Damazio José Manoel de Seixas Signal Processing Lab –
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
The ATLAS Tiles Hadronic Calorimeter
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
XFEL In-kind Review Committee Meeting, 11 May 2009 Parliament British Museum XFEL clock and control system In kind contribution proposal Development and.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
Electronics Group in Zeuthen K.-H. Sulanke Liebenberg,
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
June SPN meeting - Krakow1 Christian Bohm Physics Instrumentation at Stockholm University.
Argonne’s Rôle in ZEUS José Repond Argonne National Laboratory DOE Visit, Germantown, March 11 th, 2004.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The ATLAS detector … … is composed of cylindrical layers: Tracking detector: Pixel, SCT, TRT (Solenoid magnetic field) Calorimeter: Liquid Argon, Tile.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
ATLAS calorimeter and topological trigger upgrades for Phase 1
ATLAS L1Calo Phase2 Upgrade
Electronics requirements for special diagnostics for the XFEL
L1Calo Joint Meeting Introduction
Topological Ordering Algorithm: Example
PID electronics for FDIRC (Focusing Detector of Internally Reflected Cherenkov light) and FTOF (Forward Time of Flight) Christophe Beigbeder and Dominique.
John Harvey CERN EP/LBC July 24, 2001
CMX Status and News - post PRR -
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Topological Ordering Algorithm: Example
Topological Ordering Algorithm: Example
Topological Ordering Algorithm: Example
Presentation transcript:

SU participation in nn bar Sam Silverstein

Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger  ATLAS Tile Calorimeter front-end readout  XFEL timing and trigger system  PANDA calorimeter readout 2

Effort and resources Christophe Clement David Milstead Samuel Silverstein Access to two electronics engineers Have a guaranteed flow of graduate students, could involve at least one physics Ph.D. student in LoI studies In-house seed funding possible for initial studies and prototyping Long term involvement contingent on external support for hardware 3

What are our interests Hardware  Front-end electronics  Trigger and data acquisition  Timing/trigger distribution Physics studies  Background estimates  Geant simulation 4

5 Some of our previous work

ATLAS TileCal digitizer A/D conversion, pipeline, readout of ~ PMTs Produced, tested and commissioned more than 2000 boards 6

ATLAS L1 Calorimeter Trigger 7 Digital jet-finding and data merging algorithms Custom backplane and crate infrastructure Leading role in topology upgrade for Run 2

XFEL Timing/trigger distribution Synchronous with 1.3 GHz RF Distribution over more than 3.4km Accuracy better than 5 ps (RMS) 8

Questions What do we want to build? What is the current simulation status? What is the time scale for funding? Status of the collaboration? 9