RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.

Slides:



Advertisements
Similar presentations
LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
Advertisements

Expected performance in the injectors at 25 ns without and with LINAC4 Giovanni Rumolo, Hannes Bartosik and Adrian Oeftiger Acknowledgements: G. Arduini,
Review of 2011 studies and priorities for 2012 LIU-SPS-BD.
Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Theoretical studies of IBS in the SPS F. Antoniou, H. Bartosik, T. Bohl, Y.Papaphilippou MSWG – LIU meeting, 1/10/2013.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
T. Argyropoulos, LIU /04/2013 Progress in the SPS: RF studies and beam quality T. Argyropoulos, T. Bohl, J. E. Muller,, H. Timko, E. Shaposhnikova.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
PyHEADTAIL-PyECLOUD Simulations for LHC and HL- LHC Aaron Axford 27/05/20151.
Lessons from SPS studies in 2010 E. Shaposhnikova Chamonix’11 session 09: LHC injectors upgrade.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
Chapter 10 Rüdiger Schmidt (CERN) – Darmstadt TU , version E 2.4 Acceleration and longitudinal phase space.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Saturday 9 th April 10:24 Finally « 600 » bunches 14:30 Dump the 600 x :00 Loss maps Green light for 800 bunches 18:40 Fill for 800 bunches 20:48.
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2015 O During year - 9 meetings of LIU-SPS BD WG (as in 2013, but 10 in 2014 and 12 in.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
Momentum slip-stacking of the nominal I-LHC beam in the SPS Particle simulations (preliminary) T. Argyropoulos, E. Shaposhnikova LIU-SPS BD WG 30/01/2014.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
End-of-year talk LIU-SPS BD WG meeting Our meetings in 2013 O During year - 9 meetings of LIU-SPS BD WG (less than usual 12 in the past :-)
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Outcome of beam dynamics simulations - Scenarios, requirements and expected gains s LIU-SPS Coordination meeting 26/08/2015 A. Lasheen, E. Shaposhnikova,
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Pros and Cons of the 200 MHz System G. Iadarola, K. Li, E. Metral, G. Rumolo Thanks to: L. Medina, J. Esteban Mueller, B. Salvant, E. Shaposhnikova, R.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Synchrotron frequency shift as a probe of the CERN SPS reactive impedance s HB2014 – 11/13/14 A. Lasheen, T. Argyropoulos, J. Esteban Müller, D. Quartullo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Loss of Landau damping for reactive impedance and a double RF system
Harmonic system for LHC
Harmonic system for LHC
Longitudinal impedance of the SPS
Space charge studies at the SPS
Machine Coordinators: G. Arduini, J. Wenninger
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Measurements of the Synchronous Phase Shift Aaron Farricker Participants: A.Lasheen, J. Repond & M.Schwarz Acknowledgements: H. Bartosik, T. Bohl,
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Collective effects in the SPS and LHC (longitudinal plane)
Presentation transcript:

RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban Müller, H. Timko, E. Shaposhnikova CCC: G. Iadarola, Y. Papaphilippou, G. Rumolo Thanks to all SPS OP on shift 1

2 General MD title: Longitudinal set up of the 25 ns LHC beam with Q20 optics (nominal ~1.25x10 11 pb and high ~1.4x10 11 p/b injected intensities) MD aim:  Improve the bunch length distribution inside the batch (“U-shape”)  Improve the slope of the bunch lengths along the train  Achieve beam stability and acceptable beam parameters at flat top Beam conditions:  4 batches of 72 bunches  Intensities at injection: N p ~1.25x10 11 p/b and N p ~1.45x10 11 p/b Varying  RF voltage amplitudes at FB (V 200 and V operation always in double RF)  Controlled longitudinal emittance blow-up (Amplitude and scaling – always on )  Phase between the 2 RF systems at FT (first attempt to improve stability by compensating for beam loading at 800 MHz)

Outline  Losses  Nominal intensities (~1.25x10 11 at injection)  Optimization of the controlled longitudinal emittance BUP to reduce the “U-shape” of the bunch length distribution inside the batches at FT  Modification of the RF voltage (V 200 ) to improve the slope of the bunch lengths along the batch trains at FT  High intensities (~1.45x10 11 at injection)  Improve stability: mainly by optimizing the BUP (amplitude, scale)  Summary 3

4 Losses  Very good transmission for nominal intensities (~96 %) : not affected by the changes in longitudinal parameters  Still low losses for the higher intensities (~6-7 %)

5 Nominal intensities (~1.25x10 11 at injection)  Beam was stable (with the 800 MHz RF system and controlled emittance blow-up)  Decrease of average bunch length along the FB for constant RF voltage (3 or 4.5 MV) + slight increase (~1%) of capture losses  not observed with the voltage dips  Bunch length distribution at FT:  “U-shape” inside the batch  slope along the batch train Example of the best conditions:  V 200 = 4.5 MV  V 800 = 0.45 MV  Scale BUP = 0.93  V BUP = 35 mV

6 U – shape of bunch length distribution  Due to beam loading the synchrotron frequency distribution varies along the batch  Different effect of the controlled BUP to the bunches at the edges and the center of the batch  Leads to the “U-shape” at FT  Reduce this by decreasing the scale parameter in the BUP Synchrotron frequency Distribution inside the bunch. Before BUP – V 800 /V 200 = 0.1  Average of all acquisitions for different BUP scales: V 200 = 4.5 MV – V 800 = 0.1V 200 – V BUP = 30 mV increasing the scale makes bunch lengths along the batch more uniform  with scale=0.85 bunches a slightly unstable at FT  slightly better stability for scale=0.9 than 0.93 (mainly dipole oscillations)

7 Slope along the batch train  Correlation of the V 200 at FB with the bunch length slope along the batch at FT  V 800 = 0.45 MV – V BUP = 35 mV – Scale BU = 0.93  Not significant improvement with the different voltage settings that were tried  Small difference in stability

8 Higher intensities (~1.45x10 11 at injection)  Beam was unstable - with the 800 MHz RF system and controlled emittance blow-up (same settings as in the low intensities)  Decrease of average bunch length along the FB for constant RF voltage  Bunch length distribution at FT: “U-shape” inside the batch and slope along the batch train still remain  Optimize the controlled emittance BUP:  increase the noise amplitude V BUP  lower the scale parameter  Limiting time with these intensities  only few acquisitions

9 Higher intensities (~1.45x10 11 at injection)  Increase V BUP while keeping the same high scale (0.9) didn’t show any improvement V 200 = 3 MV – V 800 = 0.45 MV Scale BUP = 0.9 – V BUP = 35 mV V 200 = 3 MV – V 800 = 0.45 MV Scale BUP = 0.9 – V BUP = 60 mV

10 Higher intensities (~1.45x10 11 at injection)  Increase Scale BUP while keeping the same high V BUP (60 mV) improved stability  Still unstable with long bunches at FT V 200 = 3 MV – V 800 = 0.3 MV Scale BUP = 0.85 – V BUP = 60 mV V 200 = 3 MV – V 800 = 0.45 MV Scale BUP = 0.9 – V BUP = 60 mV Change of the ratio V 800 /V 200 to 0.1 improved the situation but not significantly

11 Higher intensities (~1.45x10 11 at injection)  Increase RF voltage at FB improved stability  Still some bunches are unstable with very long bunches at FT V 200 = 4.5 MV – V 800 = 0.45 MV Scale BUP = 0.85 – V BUP = 60 mV V 200 = 3 MV – V 800 = 0.3 MV Scale BUP = 0.85 – V BUP = 60 mV

12 Summary  Good transmission:  ~96-97 % for Np~1.25x10 11 p/b  ~93-94 % for Np~1.45x10 11 p/b  Stable beam always with the nominal intensities:  800 MHz ON  controlled longitudinal emittance BUP ON  Decrease of average bunch length along the FB for constant RF voltage (3 or 4.5 MV)  not observed with the voltage dips  but slightly more unstable at FT  “U-shape” inside the batch :  improved with higher Scale BUP  slope along the batch train remains still  further investigation is needed  Higher intensities  Beam unstable at FT  small improvement by optimizing the BUP  but bunches too long at FT  More time is needed