Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel.

Slides:



Advertisements
Similar presentations
Arecibo 40th Anniversary Workshop--R. L. Brown The Arecibo Astrometric/Timing Array Robert L. Brown.
Advertisements

Preparing a Competitive Radio Proposal Ed Fomalont NRAO Charlottesville, VA.
Proposing for VLA and VLBA Time Lorant Sjouwerman National Radio Astronomy Observatory, Socorro NM.
The Very Large Array Past and Future Dave Finley.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
Radio Telescopes Large metal dish acts as a mirror for radio waves. Radio receiver at prime focus. Surface accuracy not so important, so easy to make.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
Transient Science with the Allen Telescope Array Geoff Bower Berkeley.
Chandra Users’ Committee, 6-7 Apr 2009 Chandra Director’s Office Cycle 11  CfP Release: Dec  POG, final A Eff : 15 Jan 2009  GTO: 43 proposals.
The Future of the Past Harvard University Astronomy 218 Concluding Lecture, May 4, 2000.
1 Synthesis Imaging Workshop Error recognition R. D. Ekers Narrabri, 20 Sep 2006.
Project status and specifications Douglas Bock Project Manager 1.
1 Synthesis Imaging Workshop Error recognition R. D. Ekers Narrabri, 14 May 2003.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
J.M. Wrobel - 25 June 2002 PROPOSALS 1 PROPOSAL WRITING TUTORIAL Outline 30 minutes: Lecture on Generic Issues 60 minutes: Small Groups Write Proposals.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
J.M. Wrobel - 19 June 2002 SENSITIVITY 1 SENSITIVITY Outline What is Sensitivity & Why Should You Care? What Are Measures of Antenna Performance? What.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
Portal and Proposal Submission Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler EVLA Computing Division Head.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Sensitivity Joan Wrobel.
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
Array Configuration Divya Oberoi MIT Haystack Observatory.
The Expanded Very Large Array: Phase I Science and Technical Requirements Rick Perley NRAO - Socorro.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
VLA Archive Image Pilot Pilot to create images from VLA archive data Loránt Sjouwerman National Radio Astronomy Observatory.
Moscow presentation, Sept, 2007 L. Kogan National Radio Astronomy Observatory, Socorro, NM, USA EVLA, ALMA –the most important NRAO projects.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
Radio Interferometers’ Data Archives how to find, retrieve, and image radio data: a lay-person’s primer Michael P Rupen (NRAO)
Answers from the Working Group on AGN and jets G. Moellenbrock, J. Romney, H. Schmitt, V. Altunin, J. Anderson, K. Kellermann, D. Jones, J. Machalski,
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
E-MERLIN & EVLA P.J.DiamondP.J.Diamond MERLIN/VLBI National Facility Jodrell Bank Observatory University of Manchester MERLIN/VLBI National Facility Jodrell.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Proposal Writing Joan Wrobel.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Proposal Writing Joan Wrobel.
Twelfth Synthesis Imaging Workshop 2010 June 8-15 Proposal Writing and PST Demo Joan Wrobel, EVLA Scheduling Officer.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Short Spacing.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
EAC Butler - SSS Software

SS 433: Distance Determination with Radio Images
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
VLA to EVLA Transition Plan
2017 Jan Sun Mon Tue Wed Thu Fri Sat
Discussion Session (5:15-5:45)
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Gustaaf van Moorsel September 9, 2003
Shared Risk Science with the EVLA
Jan Sun Mon Tue Wed Thu Fri Sat
Observatory Science Operations
Observatory Science Operations
EVLA Construction Status
Transition Observing and Science
Rick Perley NRAO - Socorro
The Karl g. jansky Very Large Array
Presentation transcript:

Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 Proposal Writing Joan Wrobel

2 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Outline 20 minutes: Lecture –Generic –VLA and VLBA 10 minutes: Q & A 90 minutes: Practical –Small groups write proposals NRAO VLANRAO VLBA

3 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Generic Start with … –Scientific idea –Target list Specify required … –Angular resolution –Largest angular scale –Observing frequency –Observing bandwidth –Stokes parameters Select trial array Radio Galaxy Fornax A VLA 1.4 GHz 1.0d x 0.7d R. Ekers

4 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Generic: Evaluate Trial Array Special needs –Redshifted HI? –Redshifted CO? Geometry –Target above elevation limit? –Snapshot or full u-v coverage? Interferometer sensitivity –Signal-to-noise to self-cal target? Image sensitivity –Enough signal-to-noise on target? –Dynamic-range limited? Supernova Remnant Crab Nebula VLA 5 GHz 7’ x 5’ M. Bietenholz

5 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Generic: Evaluate Trial Array Enough field of view? –Primary beam attenuation –Bandwidth smearing –Time-average smearing –Non-coplanar baselines Optimal timeframes? –Time of day –Season –Year ~ sunspot number If trial array … –Fails, pick another –Passes, write and submit observing proposal Sun VLA 5 GHz 43’ x 43’ S. White TRACE X-rays Now

6 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 VLA/VLBA Proposals Get news Add cover information via Proposal Submission Tool (PST) –my.nrao.edu Add scientific justification, technical justification –200 or more NRAO hours => Large => 10 pages –Regular => 4 pages: be clear, specific, concise –Science: give motivation, state goals (eg) –Technical: give observing strategies, consult archives (eg) Staff co-author optional – Submit via PST

7 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 VLA/VLBA Proposal Handling Received for deadlines 1 Feb, 1 Jun, 1 Oct –For trimesters T2, T3, T1 –For VLA configurations in Classified by scientific categories Sent to category’s referees Referees return ratings, comments Ratings, comments sent to Proposal Selection Committee (PSC) –R. Becker, A. Brown, M. Elvis, S. Kurtz, N. Vogt, R. Zavala –B. Clark, M. Claussen, R. Dickman, J. Ulvestad, J. Wrobel Proposal Selection Committee meets early Apr, Aug, Dec Results ed to proposers by 1 May, 1 Sep, 1 Jan Details at

8 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 VLA/VLBA Proposals & Students Consider submitting a deadline early, improve, re-submit Proposed observations for your thesis ? –Answer via PST –If yes Add Plan of Dissertation via PST or user profile Update your graduation year via user profile Eligible for funding ? –wiki.gb.nrao.edu/bin/view/Observing/NRAOstudentsupportprogram –Apply via PST Donate thesis copies to NRAO VLBA 22 GHz A. Brunthaler

9 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Other Proposal Types & Routes VLA/VLBA rapid response science –Exploratory: quick follow-up of recent discovery (eg) –Target of opportunity: unpredicted phenomenon (eg) – Joint proposal routes –Chandra/VLA/VLBA cxc.harvard.edu/proposer/ –Spitzer/VLA ssc.sptizer.caltech.edu/propkit/ –GLAST/VLA/VLBA glast.gsfc.nasa.gov/sss/proposals Star V838 Mon HST Chandra Spitzer GLAST

10 Eleventh Synthesis Imaging Workshop, June 10-17, 2008 Proposal Writing: Practical Small groups write VLA or VLBA proposals Groups get –Access to test my.nrao.edu –Scientific justification file –Printed real proposal Group completes new proposal, compares with real one NRAO VLANRAO VLBA VLA Continuum Speare 4 60 students Joan Wrobel Tracy Clarke VLA Line Speare students Gustaaf van Moorsel Crystal Brogran VLBA Library students Mark Claussen Vivek Dhawan