Ronan Point Collapse Group 1:John Mulhaire David Hatch David Hatch Rob Patterson Rob Patterson Robert Morgan Robert Morgan.

Slides:



Advertisements
Similar presentations
A. T. Tankut Middle East Technical University, Turkey
Advertisements

COST EFFECTIVE MASS HOUSING TECHNOLOGY
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
SEN BUILT versus UNBUILT SEN BUILT versus UNBUILT Source: Environment and energy sustainability: An approach for India, McKinsey & Company.
Unit 11: Texas in the Great Depression and World War II
Skyscraper Construction
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Mechanics of materials ** progressive collapse **  The term progressive collapse is defined as the collapse of all or a.
5. HEAVY TIMBER FRAME CONSTRUCTION
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
Foundations and Footings
Mr. Williams – Grade 7 Science
Masonry Wall Bracing A Simplified Approach To Bracing Masonry Walls Under Construction Produced by the Masonry Bracing Task Force.
Incident Date:1/11/2012 Time:07:30 AM Fatality: 25 injuries: 131 Total losses:
Activity based on “Leaning Tower of Pasta” Source: Digital Library, TeachEngineering,
SCEC Annual Meeting - ITR 09/17/ Izmit Earthquake August 17, 3:02am, 1999 Mw 7.4 Mw earthquake: >18,000 fatalities >300,000 homeless.
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
THE STOCK MARKET CRASH AND THE GREAT DEPRESSION EVENTS THAT HELPED CAUSE THE STOCK MARKET CRASH: 1. OVERSPECULATION: Stock prices had risen far above the.
The ground must push up as hard as the building pushes down
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
Introduction to Earthquake Hazards in Common Structures Prepared by David J Hammond, Structural Engineer Ret. Short Course for Earthquake Preparedness.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
By : Lisa Runt. Types of Bridges Beam – the simplest type of bridge. It is made of two or more supports which hold up a beam. Arch – weight is carried.
9/11: Why The Towers Collapsed. Theory A previous article written in 2007 by William Rice, a civil engineer on the twin towers discussed the low chances.
PREVENTING PROGRESSIVE COLLAPSE OF MULTI-STORY BUILDINGS Yahia Tokal Civil Engineering Seminar, Lawrence Technological University, Southfield, Michigan.
AP Environmental Nuclear Energy. NUCLEAR ENERGY When isotopes of uranium and plutonium undergo controlled nuclear fission, the resulting heat produces.
2182 D - Timber Framing Code Wall Bracing Class Exercise 1.
Hurricanes. Katrina approaching New Orleans August 2005.
The structure which I am presenting is the Western Wall. The Western Wall is located in Jerusalem, Israel.
Ronan Point Collapse Group 1: Gareth Nolan James O’Brien Jennie Quigley Laura Woodbyrne.
{ Ronan Point Collapse Group 1: Martin Phelan Michael Grimes Michael Grimes Matthew Arnold Matthew Arnold.
L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.
Group 1 Michael Day Jean Giblin Chris Maguire James Wilkinson
World Trade Centre Collapse Group 17 Valerie Scott Dan Kennedy.
The Royal Plaza Hotel Collapse. Background on Collapse  Collapsed Friday 13 th August 1993 at 10:10 a.m.  The collapse took less than 10 seconds! 
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
This is a map of the Pacific Ocean and some of the islands in it. Kiribati (Gilbert Islands) will be among the first islands to be submerged.
MNM Fatal Fall of Person Accident Fall of Person Accident October 11, 2008 (Missouri) October 11, 2008 (Missouri) Cement Operation Cement Operation.
Structural Integrity in the Design of Concrete Structures
Severe Weather Ever touched someone after scuffling your feet on the carpet and received a mild shock? When you walk around the friction between the.
“The atomic bomb made the prospect of future war unendurable. It has led us up those last few steps to the mountain pass; and beyond there is a different.
Identify the forces that act on structures Forces Next > In this presentation you will:
Buildings Insurance How to work out your Sums Insured Working out your Buildings Sum Insured Your home is probably the most valuable asset and you need.
Levels of damage from environmental hazards. Title: Levels of damage from environmental hazards.  10/06/2016  Aims:  To look at the different levels.
Royal Plaza Hotel, Thailand
What is an Earthquake? Earthquakes are the deadliest of all natural disasters. Most deaths are caused by collapsing buildings or fires. Earthquakes are.
Group 8 Façade failure of the John Hancock Building.
Tacoma Narrows Bridge Collapse
4A6 CASE STUDY PRESENTAION World Trade Centre Collapse.
Ronan Point Disaster 1968 Group 1 Presentation.
8 th Grade Applied Technology Mr. Giannone. In this unit we will study structures and the forces that affect them.
Tacoma Narrows Bridge & Aeroelastic Fluttering
Chapter 14 Collapse.
by Dr. Syed Mohamed Ibrahim M.Tech., Ph.D.,
Redifer Commons Addition & Renovation Project
Foundations in Low-Rise Construction (up to 3 floors)
Building Construction
Arch205 building construction wall systems
Arch205 building construction Introduction
فلوشیپ اخلاق زیست پزشکی استادیار دانشگاه علوم پزشکی ایران
Arch205 Materials and building construction I
5. HEAVY TIMBER FRAME CONSTRUCTION
Presentation transcript:

Ronan Point Collapse Group 1:John Mulhaire David Hatch David Hatch Rob Patterson Rob Patterson Robert Morgan Robert Morgan

Background Housing sector decimated by World War 2 Solution: the construction of many high rise pre-cast buildings. high rise pre-cast buildings. Reasons: Saved land Large numbers of people Large numbers of people Constructed quickly Constructed quickly Cheap Cheap

Perhaps too Cheap!!!

The Building 110 apartments 22 storeys high Construction began on July 25 th & took only 2 years. Cost:£500,000

The method Larsen-Nielsen Developed in Denmark 1948 Walls, floors and stairways were all pre-cast Each floor was load bearing AND supported the floor above……

Collapse The southeast corner of the Ronan Point Tower collapsed on May 16, 1968 at approximately 5:45 a.m Collapse was initiated by a gas-stove leak on the eighteenth floor in apartment ninety Explosion knocked out the opposite corner walls of the apartment Walls were the sole support for the walls directly above, created a chain reaction Floors fell onto level eighteen, which initiated a second phase of progressive collapse.

Domino Effect

Domino Effect

Collapse (cont’d) 4 people died and 17 were injured The lack of fatalities were due to the fact that below floor 18 only the kitchens were destroyed

Layout

Technical aspects Public pressure led to an government inquiry Revealed that strong winds and/or the effects of a fire could also have caused a progressive collapse The building was designed to withstand wind velocities of up to 63mph However a wind of 105mph could be expected at 200 feet above the ground every 60years, within the life expectancy of the building

Technical aspects (cont’d) Building code used for the design of the building were published in 1952 however they weren’t kept up to date In 1963 a new study showed higher than stated winds were likely Fire also would have had a similar effect on Ronan Point It was estimated that fire could so expand and ‘arch’ the floor slab and bend the wall panel 16 years after the collapse architect Sam Webb conducted a fire test which proved this theory

Professional aspects Findings of poor workmanship led to the demolition of the remaining Larsen – Nielson system built towers. Findings of poor workmanship led to the demolition of the remaining Larsen – Nielson system built towers. The collapse initiated changes to the regulation codes Building codes now take in account for the possibility of progressive collapse and of forces from an internal explosion Also require minimum amounts of ductility and redundancy.

Educational aspects An example of what can happen when an alternative load path is not provided The importance of building codes the importance of monitoring construction quality