RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

RHIC Status Time Meeting 2/10/2015 Then said to us: "You can no farther go Forward upon this crag, because is lying All shattered, at the bottom, the sixth.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Beam-Beam Simulations for RHIC and LHC J. Qiang, LBNL Mini-Workshop on Beam-Beam Compensation July 2-4, 2007, SLAC, Menlo Park, California.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Update of the SPS transverse impedance model Benoit for the impedance team.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Polarization in ELIC Yaroslav Derbenev Center for Advanced Study of Accelerators Jefferson Laboratory EIC Collaboiration Meeting, January 10-12, 2010 Stony.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Beam-Beam effects in MeRHIC and eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory Jan 10, 2009 EIC Meeting at Stony Brook.
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Six-dimensional weak-strong simulations of head-on compensation in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam.
INTENSITY LIMITATIONS IN THE LHC INJECTORS Discussion on Landau damping Ibon Santiago González Summer Student Session 2007.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
RHIC head-on beam-beam compensation with e-lens N. Abreu, W. Fischer, Y. Luo, C. Montag, G. Robert-Demolaize J. Alessi, E. Beebe, A. Pikin 1. Introduction.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Beam-beam effects in eRHIC and MeRHIC
Proposals for 2015 impedance-related MD requests for PSB and SPS
Beam-beam Effects in Hadron Colliders
Luminosity Optimization for FCC-ee: recent results
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Another Immortal Fill….
Presentation transcript:

RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015

RHIC Status As of today, past the installation milestones DX moves at IP2,4 Roman pot installation Dump window upgrade Abort kicker cooling upgrade Final e-lens bakeout today X-arc transformer failure (two day repair ends today) Slow going so far because of daily access 56x56 1.3e11/bunch through the rotator ramp Need rebucketing Store setup, overnight stores Saturday evening(?)

Beam-Beam Effect In collision, on-coming beam looks like a non-linear lens Like charge means defocusing which lowers the tune Linear beam-beam parameter N = per bunch intensity r0 = classical radius of partical  = Relativistic gamma  = emittance Amplitude [beam sigma] Beam-beam foce [arb]

Beam-beam Emittance Blowup Vertical Horizontal Yellow IPM Emittances Longitudinal scraping being used to reduce beam loss during rebucketing at 100 GeV. Moving to a vertical-only scraping scheme increased beam-beam tune spread,  Q bb Ran into the beam-beam limit: Transverse emittance blowup Increase in polarization decay >2%/hr, compared to ~1%/hr nominal Vertical Beam Transfer Function 2/37/  Q bb Diminishing tune spread from beam-beam is exactly the goal of the electron lens

Yellow emittance blowup at store coincides with removing longitudinal scraping in the Booster Yellow polarization decay goes to 1.9%/hr during this period Beam-beam Emittance Blowup

6 E-Lenses at IP 10 SOLENOID 1 EBIS Spare Images from X. Gu

Slide courtesy of W. Fischer

Run 15 Store Optics Β = 20 mΒ* = 0.85m ΔΦ =π The π phase advance between IP8 (or 6) and the e-lens is what makes it an ‘e-lens’ lattice.

E-lens and transverse stability E-lens presents a substantial impedance to the beam*, “transverse mode coupling instability” (think head-tail instability) Primary stabilizing force is the solenoidal field at the e-lens (pins the electrons) Additional stabilizing (against all coherent instabilities, including e- lens) to be provided by the transverse BBB damper. *Burov et al, “Transverse beam stability with an ‘electron lens’” Phys. Rev. E, Vol 59, Num 3 (1999) B th = min solenoid field for stability r = beam radius (controlled via β*) ΔQ = |Qx – Qy| (assumed to be 0.01, could be a problem)

BBB Damper Hardware (pickups and kickers in the injection area) Yellow BBB kicker Y-arc Yel beam Blue BBB kicker PUE can be chosen between Q11 and Q15 (depends on lattice)

E-lens Commissioning Final bakeout today, hi-pot tests Cathode conditioning over the weekend Electron beams some time next week – Initially end of store – Integration into standard ramp sequence after initial tests Initial operational setup is to bring all beams into collision (p-p and p-e) simultaneously at end of ramp.