RHIC Status April 8, 2011 RSC Meeting Haixin Huang.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC pp 500 GeV development M. Bai C-A Department.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
ApEx needs for CeC PoP Experiment December 11, 2015.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Beam-beam Effects in Hadron Colliders
Luminosity Optimization for FCC-ee: recent results
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary Thursday h21: Stable beams fill #1303.
Another Immortal Fill….
Status of RCS eRHIC Injector Design
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

RHIC Status April 8, 2011 RSC Meeting Haixin Huang

Peak luminosity reached new record of 150* 10^30 cm^-2 s^-1. Bunch intensity is typically 1.8*10^11 and as high as 1.9*10^11. We have seen no indication of limit from 9MHz cavity. Collimator on the ramp has been put into use since last Friday. Vertical tune at store has been raised to improve beam life time. Horizontal tune on the ramp (tune swing part) has been lowered by 0.003, not much effect seen on polarization. We will keep Booster scraping in while maintain intensity at *10^11 level. Using other means (source temperature, AGS setup, AtR tuning) to maintain the intensity. Down ramp development yesterday and successful chromaticity feedback with proton beam. Haixin Huang2 Status

Luminosities in Last a Few Stores Haixin Huang3

Intensity Haixin Huang4

l We scanned snake current +-5A (+-150mirco-rad), no change of polarization transmission efficiency. But we plan to do more. l We scan the vertical tune on the ramp and it stays at a plateau. Tune control on the ramp is also very good. l We greatly improved the rms orbit this run through orbit feedback. The BPM offset sign reversal and realignment of vertical should improve the orbit, too. l Vertical chromaticity is in the 2-3 range over the sensitive range ( GeV). l Possible sources of polarization loss on the ramp: misalignment between magnets and BPMs; coupling at later part of ramp; and horizontal tune/chromaticity because of coupling. Haixin Huang5 Polarization Sensitivity Tests So Far

Inner Snake Current Scan Haixin Huang6 snake current +-5A (+-150mirco-rad)

Vertical Tune Current Scan Haixin Huang7

Polarization Haixin Huang8

Polarization Haixin Huang9 0.2 lately Overall they are better than run9, but the profiles are steeper than injection.

Haixin Huang10 7/10 resonance 11/16 resonance 3/4 resonance New Working pt RHIC Polarization Transmission to 250GeV The relative gain of polarization by moving Q y from.68 to.676 is The actual efficiency is about 80% instead of 93% (based on jet calibration). The hope is that the close orbit error reduction gives additional gain. Working pt for 250 GeV run From online polarization measurements

Haixin Huang11 Ramp Measurements Preliminary ratio of three ramps: 100->100: >250: The ramp is a factor slower. So any depolarization effect should be stronger than the regular ramp.

Asymmetry on the Down Ramp Haixin Huang12

l Ramps with vertical tune at 0.71 and Bunch intensity of *10^11. Two ramps. The purpose is to see if higher polarization can be reached this year after all the effort to reduce orbit errors. We measured close to zero polarization last run. 3-4 hours. l Ramp with vertical tune at to see if we indeed reach transmission efficiency plateau. The last attempt was lost during ramp, but passed the low tune part. May need two ramps. 3 hours. l 12 bunch ramp and stay at store for half hour to check e-cloud effect on emittance growth. 1hr. l 109x to 3e11/bunch acceleration (requires ½ hr tunnel access). 2 hrs. l Emittance growth at store without collision (expect to see no emittance growth in store). 1hr at store +1 hr setup. l Test of the new configuration of the llrf loops for the 9 MHz mode. The goal of the new loops is to achieve lower longitudinal emittance and shorter bunches at store. 2 hours at injection and possible 6-bunch ramp. l Near integer working point 16 hours. Haixin Huang13 Possible Study List (14-30 hrs)

l Parasitic parameter scans (snake current). l Parasitic moving parameters in steps over many stores (horizontal tune, horizontal chromaticity). l Follow the prioritized study list to do beam study. l To identify the source of possible polarization loss, we need polarization profile information during store (combine the profiles from different stores to gain statistics). l Also need modeling the up and down ramps with different ramp speed. l Most importantly, provide physics stores. Haixin Huang14 Plan

Haixin Huang15

Haixin Huang16 Vertical Intrinsic Resonance Spectrum in RHIC

Ramp Measurements Haixin Huang17 110s: 100GeV; 270s: 250GeV; 320s: done beta squeeze Seen flat asymmetry over the range. But if assuming analyzing power dependence on energy, polarization drop shown around 200sec.