Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Strategic Decisions (Part II)
Topics to be Covered 1. Capacity Planning
Operations Management Dr. Ron Tibben-Lembke
Operations Management Aggregate Planning Chapter 13
Aggregate / Production Planning
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Review for Exam II—Mar 20, 2002 Dr. Burns. Exam Format  multiple choice  3 problems  Closed-book  Closed-notes  Closed-neighbor  BRING---pencil,
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Operations Management Aggregate Planning
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
1 CAPACITY PLANNING (Chapter 6) How capacity is measured. p. 221 Capacity utilization = Avg output/Max capacity 221 Capacity planning over ST/MT/LT Factors.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Inventory Stock of items held to meet future demand
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Operations Management Aggregate Planning
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Inventory Management for Independent Demand Chapter 12, Part 1.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Production Planning and Scheduling. Production Planning Also Known as Aggregate Planning Problem in Game: Set Production Every Period, Allocate Resources,
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Aggregation To combine the creation of many similar products into one relevant measure of activity for the organization. Click here for Hint heuristic.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
Nervous In management science, a condition in which a small change to input data can create major revisions to the conclusions suggested by a particular.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Inventory Stock of items held to meet future demand
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
SOM 464 Manufacturing Resource Planning
aggregation To combine the creation of many similar products
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
13 Aggregate Planning.
Beni Asllani University of Tennessee at Chattanooga
Dr Sh Salleh bin Sh Ahmad
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Inventory Stock of items held to meet future demand
Presentation transcript:

Production Planning (Aggregate Planning)

SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment, people, money) in manufacturing and some service operations How many items should be ordered or made at a given time? Who is assigned which job? How do jobs flow through the firm? How is inventory maintained?

Manufacturing Resource Planning: Flow of Materials Raw Materials Flow into Manufacturing/Service Company. Finished Goods/Services Distributed to End Customers. Supply Chain Management (SCM) is the Study of this Linked Chain of Activities. Manufacturing Resource Planning (or Materials Management) is the Study of the Planning and Materials Flow.

Manufacturing Resource Planning: Flow of Materials Supply Chain Diagram: Supplier  Manufacturer  Distribution  Customer System

Manufacturing Resource Planning Criteria High Customer Service (Probability of Meeting Demand) Minimize Production Costs Minimize Inventory Holding Costs and Other Inventory Investment Costs – Avoid Shortages Minimize Distribution Costs These Objectives Often Conflict with Objectives of Marketing and Finance.

Production Planning There are Five Major Levels in Planning and Control Strategic Business Plan Production Plan (Example is Tuffy Case) Master Production Schedule (MPS) Material Requirements Plan (MRP) – Can Also Include Manufacturing Resource Planning (MRP II) and Enterprise Resource Planning (ERP) Purchasing and Production Activity Scheduling and Control (Also Known as Shop Floor Control)

Production Planning Also Known as Aggregate Planning Problem in Tuffy Case: Set Production Every Period, Allocate Resources, Meet Demand Set P t = Production for t W t = Workforce for t

Production Planning Inputs: Resources (Rough-Cut Capacity Planning), Forecast, Inventory, Policies, Costs Demand Options: Pricing, Promotion, Markets for New Demand, Allowing Back Orders (Shortages) Supply (Capacity) Options: Hiring/Layoff, Overtime, Temporary Workers, Inventories, Subcontracting, Expediting

Relevant Costs 1.Change in Production (E.g. Hire/Layoff) Costs 2.Inventory Holding Costs 3.Shortage Costs 4.Payroll Costs 5.Subcontracting Costs 6.Expediting Costs

Scheduling Strategies Chase (Demand Matching) Production Leveling Level Workforce Subcontracting (Outsourcing) Hybrid or Mixed (Probably Used in Game) Given: Beginning Inv. – Demand + P t = End Inv.

Scheduling Techniques: (1) Heuristics Informal Rules that Appear to Work. Rules are Developed (Often by Trial and Error) and Tested in Real World or Computer Simulation. Advantage: Rules Can Be Realistic. Disadvantage: Not Optimum.

Scheduling Techniques: (2) Linear Decision Rule Economic Order Quantity (Remember EOQ from SOM 306?) Type of Approach TRC = Payroll + Holding + Shortage + Change in P t = f(P t, W t ) Calculus Used to Find Best P t and W t E.g. P t =.2F t +.1F t F t+2 -.1I t +.1W t-1 Advantage: Optimum Given that Equations “Fit”. Disadvantage: Cost

Scheduling Techniques: (3) Search Rules Used with Simulation Educated, Computer-Driven, Trial & Error Advantage: Realistic Costs, Not Optimum but Close. Disadvantage: Uses Lots of Computer Time.

Master Production Schedule (MPS) Similar to Production Plan Time Periods or “Buckets” are Smaller Multiple Products are Shown: Disaggregating Done by Heuristics or Linear Programming

Tuffy Teddy Bear Case Case Introduced You to Course Material. Case Involved Production Planning, Inventory Control, and Forecasting. Most Successful Strategies are Hybrid or Mixed: Reduce Production ASAP to Lower Inventories and Increase Production Just After Vacation.

2008 Best Answer: $41,960

2009 Best Answer: $45,731

2010 Best Answer: $42,615

Another Good Answer: $47,600

Another Good Answer: $48,923

Another Good Answer: $68,577