Texas Nodal © 2005 - 2006 Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.

Slides:



Advertisements
Similar presentations
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Ancillary Services Business Requirements.
Advertisements

Lead from the front Texas Nodal 1 Texas Nodal Settlements Mini-Market - CARD July 27, 2007.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
TNT Commercial Operations Working Meeting Betty Day, Kenneth Ragsdale, BJ Flowers April 6&7, 2004.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Loads Acting as a Resource Relationships with QSEs and LSEs
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
Texas Nodal 1 Texas Nodal Settlements Mini-Market - CRR July 31, 2007.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
1Texas Nodal Texas Nodal Commercial Systems COMS CSD Presentation By ERCOT Wednesday, 1/10/2007.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Reliability Must Run Settlements Business Requirements.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Lead from the front Texas Nodal 1 Texas Nodal Day-Ahead CRR Settlements Business Requirements TPTF Presentation ERCOT Settlements.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
March 13, 2007 – Slide 1 ERCOT Nodal 101 COPS Market Guide Commercial Operations Market Guide Section 5 a. Overview of ERCOT ERCOT Overview Market Overview.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Commercial Operations Subcommittee Meeting April 13, 2010 Update to RMS April 14, 2010.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
Default Uplift Max MWh Activity Total Matthew Tozer Manager, Settlements and Billing WMS 1/8/2014.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ORDC Settlements Overview Matthew Tozer & Blake Holt ERCOT CSWG 4/21/2014.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Operations Energy Settlements Business Requirements.
October, 2011 MCWG/CWG Review of Abacus Loss Allocation ERCOT Mandy Bauld.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Energy Settlements Business Requirements.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Ancillary Services Replacement
CRR Deration and NPRR821 WMS 09/06/2017.
LCRA Comments regarding NPRR 821
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Ancillary Service Trades and Ancillary Service Settlement
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead Energy and Day- Ahead Make Whole Calculations

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 2 Day-Ahead Energy AGI (Acronym Guide Index) DAES – Day-Ahead Energy Sale DAEP – Day-Ahead Energy Purchase DASPP – Day-Ahead Settlement Point Price DAESAMT – Day-Ahead Energy Sale Amount DAESAMTQSETOT – Day-Ahead Energy Sale Amount QSE Total DAESAMTTOT – Day-Ahead Energy Sale Amount Total DAESBILLAMT – Day-Ahead Energy Sale Bill Amount DAEPAMT – Day-Ahead Energy Purchase Amount DAEPAMTQSETOT – Day-Ahead Energy Purchase Amount QSE Total DAEPAMTTOT – Day-Ahead Energy Purchase Amount Total DAEPBILLAMT – Day-Ahead Energy Purchase Bill Amount RTOBL – Real Time Obligation Amount DAOBLPR – Day-Ahead Obligation Price DARTOBLAMT – Day-Ahead Real Time Obligation Amount DARTOBLAMTQSETOT – Day-Ahead Real Time Obligation Amount QSE Total DARTOBLAMTTOT – Day-Ahead Real Time Obligation Amount Total DARTOBLBILLAMT – Day-Ahead Real Time Obligation Bill Amount DACONGRENT – Day-Ahead Congestion Rent

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 3 Day-Ahead Energy Sale

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 4 Day-Ahead Energy Sale Amount DAESAMT is the payment to a QSE for the cleared energy offers at a particular settlement point for the hour. Where DASPP is the Day-Ahead Settlement Point Price Where DAES is the Day-Ahead Energy Sale DAESAMT_ _ = (-1) * DASPP_ * DAES_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 5 Day-Ahead Energy Amount QSE Total DAESAMTQSETOT is the sum of all the DAESAMTs for a particular QSE for that hour. DAESAMTQSETOT_ =DAESAMT_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 6 Day-Ahead Energy Sale Amount Total  DAESAMTTOT is the sum of the payments to all QSEs for cleared DAM energy offers for the hour. This is used in the CRR DAM Congestion Rent calculation. DAESAMTTOT = DAESAMTQSETOT_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 7 Day-Ahead Energy Sale Bill Amount DAESBILLAMT is the difference in the amounts that are calculated by two consecutive settlement runs (i.e. DAM resettlement vs. DAM settlement runs) for the summation of DAESAMTQSETOT for a QSE, for an Operating Day. DAESBILLAMT = DAESAMTQSETOT_ (this run) – DAESAMTQSETOT_ (last run) *Note QSE 3 and QSE 10 are the only examples that will be walked through on the spreadsheet today.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 8 Day-Ahead Energy Purchase

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 9 Day-Ahead Energy Purchase Amount DAEPAMT is the charge to a QSE for the cleared energy bids at a particular settlement point for the hour. DAEPAMT_ _ =DASPP_ * DAEP_ _ Where DASPP is the Day-Ahead Settlement Point Price Where DAEP is the Day-Ahead Energy Purchase

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 10 Day-Ahead Energy Purchase Amount QSE Total DAEPAMTQSETOT is the sum of all the DAEPAMTs for a particular QSE for that hour. DAEPAMTQSETOT_ = DAEPAMT_ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 11 Day-Ahead Energy Purchase Amount Total DAEPAMTTOT is the sum of the charges to all QSEs for cleared DAM energy bids for the hour. This is used in the CRR DAM Congestion Rent calculation. DAEPAMTTOT = DAEPAMTQSETOT_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 12 Day-Ahead Energy Purchase Bill Amount DAEPBILLAMT is the difference in the amounts that are calculated by two consecutive settlement runs (i.e. DAM resettlement vs. DAM settlement runs) for the summation of DAEPAMTQSETOT for a QSE, for an Operating Day. DAEPBILLAMT = DAEPAMTQSETOT_ (this run) – DAEPAMTQSETOT_ (last run)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 13 Day-Ahead Real Time Obligation Amount

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 14 Day-Ahead Real-Time Obligation Amount DARTOBLAMT is the charge or payment to a QSE for a PTP Obligation Bid cleared in the DAM with the source and the sink, for the hour. DARTOBLAMT_ _ _ = DAOBLPR_ _ * RTOBL_ _ _ Where DAOBLPR = DAOPR_ – DAOPR_

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 15 Day-Ahead Real-Time Obligation Amount QSE Total DARTOBLAMTQSETOT is the net total charge or payment to a QSE for all its PTP Obligation Bids cleared in the DAM for the hour. DARTOBLAMTQSETOT_ = DARTOBLAMT_ _ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 16 Day-Ahead Real-Time Obligation Amount DARTOBLAMTTOT is the net total charge or payment to all QSEs for cleared PTP Obligation Bids in the DAM for the hour. DARTOBLAMTTOT = DARTOBLAMTQSETOT _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 17 Day-Ahead Real-Time Obligation Bill Amount DARTOBLBILLAMT is the difference in the amounts that are calculated by two consecutive settlement runs (i.e. DAM resettlement vs. DAM settlement runs) for the summation of DARTOBLQSETOT for a QSE, for an Operating Day. DARTOBLBILLAMT = DAEPAMTQSETOT_ (this run) – DAEPAMTQSETOT_ (last run)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 18 Day-Ahead Energy Revenue

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 19 Day-Ahead Energy Revenue DAEREV is the revenue received in the DAM for the Resource at the Resource Node Settlement Point represented by the QSE, based on the DAM Settlement Point Price, for the hour. DAEREV_ _ _ = (-1) * DASPP_ * DAESR_ _ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 20 RMR Day-Ahead Energy Revenue Total RMRDAEREVTOT is the total of the Day- Ahead Energy Revenue for all RMR Units only for each hour in the Operating Day. RMRDAEREVTOT =DAEREV_ _ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 21 Day-Ahead Congestion Rent DAMCONGRENT is calculated as the net of the Day-Ahead Energy Charge, Day-Ahead Energy Payment, Day-Ahead Energy Revenue to RMR Units, and the Settlement for PTP Obligations Bought in the DAM. The Congestion Rent value is a component used by CRR Balancing Account Settlements to determine if CRR Owners should be partially paid or paid in full. Additionally, if the CRR Owners are paid in full and there is a surplus, the surplus will go to the Balancing Account. DACONGRENT = DAESAMTTOT + RMRDAEREVTOT + DAEPAMTTOT + DARTOBLAMTTOT

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 22 Day-Ahead Make Whole AGI (Acronym Guide Index) DAMCOMMITFLAG – DAM-Committed Resource Flag SUFLAG – Startup Eligibility Flag DAMWENEFLAG – Day-Ahead Make-Whole Eligibility Flag DAESR – Day-Ahead Energy Sale from Resource DAEREV – Day-Ahead Energy Revenue DASUO – Day-Ahead Startup Offer DASTARTTYPE – Day-Ahead Start Type DAMEO – Day-Ahead Minimum Energy Offer DALSL – Day-Ahead Lowest Sustainable Limit DAAIEC – Day-Ahead Average Incremental Energy Cost PCRUR – Procured Capacity for Reg-Up MCPCRU – Market Clearing Price of Capacity for Reg-Up PCRDR – Procured Capacity for Reg-Down MCPCRD – Market Clearing Price of Capacity for Reg-Down PCRRR – Procured Capacity for Responsive Reserve MCPCRR – Market Clearing Price for Capacity for Responsive Reserve PCNSR – Procured Capacity for Non-Spin MCPCNS – Market Clearing Price of Capacity for Non-Spin DAMGCOST – Day-Ahead Market Guaranteed Amount DAASREV – Day-Ahead Ancillary Service Revenue DAMWAMT – Day-Ahead Make-Whole Amount DAMWAMTQSETOT – Day-Ahead Make-Whole Payment QSE Total DAMWAMTTOT – Day-Ahead Make-Whole Payment Total DAMWBILLAMT – Day-Ahead Make-Whole Payment Bill Amount **DAMWAMTRMR – Day-Ahead Make-Whole Payment RMR Unit Offset **NPRR72 to remove this and replace with DAMWRMRREV

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 23

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 24 Day Ahead Ancillary Service Revenue DAASREV is the revenue received in the DAM for the resource represented by the QSE based on the Market Clearing Price of Capacity for each Ancillary Service in the DAM. DAASREV_ _ = ((-1) * MCPCRU_ * PCRUR_ _ _ ) + ((-1) * MCPCRD_ * PCRDR_ _ _ ) + ((-1) * MCPCRR_ * PCRRR_ _ _ ) + ((-1) * MCPCNS_ * PCNSR_ _ _ )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 25 Day Ahead Guaranteed Cost DAMGCOST is the sum of the startup cost and the operating energy costs of the DAM-committed Resource at the Resource Node Settlement Point represented by the QSE, for the DAM-commitment period. DAMGCOST_ _ _ = DASUO_ _ _ _ if and only if DAMSUFLAG_ _ _ = 1 for the first hour of the commitment (otherwise DASUO is not included when calculating DAMGCOST) + (DAMWENEFLAG_ _ _ h * DAMEO_ _ _ h * DALSL _ _ _ h ) + ( DAMWENEFLAG_ _ _ h * DAAIEC_ _ _ h * (DAESR_ _ _ h - DALSL _ _ _ h )) Additional Comments: DAMGCOST will exist in an hourly data cut. The DAMGCOST value calculated for a commitment period will exist only in the first hour of the commitment period. All other hourly intervals within the commitment period will contain a value of zero (0).

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 26 Day-Ahead Make Whole Payment DAMWAMT is the payment to the QSE to make-whole the Startup Cost. DAMWAMT_ _ _ h = (-1) * Max (0, DAMGCOST_ _ _ + DAEREV_ _ _ h + DAASREV_ _ h ) * DAESR_ _ _ h / ( DAESR_ _ _ h )

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 27 Day-Ahead Make-Whole QSE Payment Total per QSE DAMWAMTQSETOT is the total of the Day- Ahead Make-Whole Payments to a QSE for the DAM-committed non-RMR Generation Resources for the hour. DAMWAMTQSETOT_ = DAMWAMT_ _ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 28 Day-Ahead Make Whole Payment Amount Total DAMWAMTTOT is the total of the Day-Ahead Make-Whole Payments to all QSEs for all DAM- committed non-RMR Resources for the hour. DAMWAMTTOT = DAMWAMT_ _ _ Note that the DAMWAMTTOT uses the DAMWAMT calc instead of the QSETOT because a QSE could have both RMR and NON-RMR units.

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 29 RMR Day-Ahead Make-Whole Revenue Total RMRDAMREVTOT is the total of the RMR Day- Ahead Make-Whole Revenue for all DAM- committed RMR Units only for the hour. RMRDAMWREVTOT= DAMWAMT_ _ _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 30 Day-Ahead Make-Whole Payment Bill Amount DAMWBILLAMT is the difference in the amounts that are calculated by two consecutive settlement runs (i.e. DAM resettlement vs. DAM settlement runs) for the summation of the DAMWAMTQSETOT for a QSE, for an operating day. DAMWBILLAMT = DAMWAMTQSETOT_ (this run) – DAMWAMTQSETOT_ (last run)

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 31

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 32 Day-Ahead Energy Purchase Ratio Share DAERS is the ratio of the QSE’s total amount of energy represented by its cleared DAM Energy Bids and PTP Obligation Bids, to the total amount of energy represented by all QSEs’ cleared DAM Energy Bids and PTP Obligation Bids, for the hour. DAERS_ =DAE_ / DAETOT Where DAE is the QSE’s total amount of energy Where DAETOT is the total amount of energy represented by all cleared bids. DAE_ =DAEP_ _ +RTOBL_ _ _ DAETOT = DAE _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 33 Day Ahead Make-Whole Charge LADAMWAMT is the allocated charge to the QSE to make whole all eligible DAM committed Resources for the hour. LADAMWAMT_ = (-1) * (DAMWAMTTOT + RMRDAMWREVTOT) * DAERS _

Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 34 Day-Ahead Make-Whole Charge Bill-Amount LADAMWBILLAMT is the difference in the amounts that are calculated by two consecutive settlement runs (i.e. Resettlement and original runs) for the summation of LADAMWAMT for a QSE, for an Operating Day. LADAMWBILLAMT = LADAMWAMT_ (this run) – LADAMWAMT_ (last run)