G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,

Slides:



Advertisements
Similar presentations
LISA Benchtop Experiment at UF Guido Mueller University of Florida 21 st July 2005.
Advertisements

Hubert HalloinScientific Committee 2013 WP Interface I3(APC/IPGP) : Fundamental Physics and Geophysics in Space Introduction and context  Fundamental.
LISA 1 LISA/GAIA/SKA Birmingham. LISA A Mission to detect and observe Gravitational Waves O. Jennrich, ESA/ESTEC LISA Project Scientist.
Laser Interferometer Space Antenna Satellite Description  Three spacecrafts forming a triangle flying 5 million km apart  Placed in an elliptical plain.
The LIGO Project ( Laser Interferometer Gravitational-Wave Observatory) Rick Savage – Scientist LIGO Hanford Observatory.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Teória relativity začiatok alebo koniec fyziky.
1 Institute for Gravitational Research Director: Jim Hough + 4 Academic Staff (Norna Robertson, Harry Ward, Ken Strain, Geppo Cagnoli) + Joint academic.
Current progress of developing Inter-satellite laser interferometry for Space Advanced Gravity Measurements Hsien-Chi Yeh School of Physics Huazhong University.
Japanese Gravitational Wave Detectors: LCGT and DECIGO Frontiers in Optics 2009 Laser Science XXV Oct. 13, 2009 San Jose, USA Seiji Kawamura (NAOJ), LCGT.
G O D D A R D S P A C E F L I G H T C E N T E R 1 GW Interferometry at Goddard Space Flight Center Jordan Camp NASA / Goddard Space Flight Center Jan.
eLISA (or NGO): the New LISA
Current Progress of Development of Laser Interferometry for LISA-type Mission in China Hsien-Chi Yeh School of Physics Huazhong University of Science &
Katrin Dahl for the AEI 10 m Prototype team March 2010 – DPG Hannover Q29.1 Stabilising the distance of 10 m separated.
1 LISA Science and Concept Robin T. Stebbins. 2 May 13, 2003 LISA Overview The Laser Interferometer Space Antenna (LISA) is a joint ESA- NASA mission.
LISA Update Bernard Schutz Albert Einstein Institute, Potsdam, Germany and Cardiff University, Wales GWDAW-10, Brownsville, 14 December 2005.
G O D D A R D S P A C E F L I G H T C E N T E R Surface Potential Measurements with the LISA Kelvin Probe Jordan Camp LIGO/LISA Charging Workshop July.
LISA Pathfinder A Technology Demonstrator for the LISA Space Gravitational-Wave Detector Gerhard Heinzel and Albrecht Rüdiger, AEI Hannover Third International.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
1 Astro-Particle Physics 9 Gravitational waves Manfred Jeitler.
08/31/2006 ~ Mission specific challenges: Data Analysis GRS Interferometry.
Science Case for LISA Pathfinder Paul McNamara LISA Pathfinder Project Scientist 30 th & 31 st January 2007.
Current Progress and Future Work  We used a Fast Fourier Transform (FFT) algorithm to model h(f) (memory function in the frequency domain). Then we divided.
International Conference on Topics in Astroparticle and Underground Physics (Sept. 11, 2007, Sendai, Japan ) DECIGO Pathfinder Masaki Ando (Department.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
The Big Bang Observer: High Laser Power for Gravitational- wave Astrophysics Gregory Harry, Peter Fritschel LIGO Laboratory, Massachusetts Institute of.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
Advanced interferometers for astronomical observations Lee Samuel Finn Center for Gravitational Wave Physics, Penn State.
PeTeR: a hardware simulator for LISA PF TM-GRS system 23/05/ th LISA Symposium May 2012, BnF Paris L. Marconi and R. Stanga Università degli.
LISA R&D activities at APC A status report Hubert Halloin.
Bridging the Gap between Terrestrial Detectors and LISA Elba 2002 May 24, 2002 Seiji Kawamura National Astronomical Observatory of Japan.
GW Workshop - Linthicum, MD Dec No ITAR protected information Group 4: Alternative Measurement Concepts RFI Assessment Summary Evaluation Team:
1. G O D D A R D S P A C E F L I G H T C E N T E R 2 New Budget Initiatives for NASA in FY04.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
System Validation and Verification Testing for LISA Preliminary Concepts Jeffrey Livas, Nicholas Jedrich, Stephen M. Merkowitz, Robin T. Stebbins NASA/Goddard.
The Big Bang Observer Gregory Harry Massachusetts Institute of Technology May 13, 2009 Gravitational Wave Advanced Detector Workshop LIGO-G
Masaki Ando, Akiteru Takamori, Kimio Tsubono Department of Physics, University of Tokyo Earthquake Research Institute, University of Tokyo 1st International.
Possibility of detecting CHRISTODOULOU MEMORY of GRAVITATIONAL WAVES by using LISA (Laser Interferometer Space Antenna) Thus, the final form of the memory.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Gravitational Wave Workshop Linthicum, MD Dec This presentation contains no ITAR protected information Group 1: No Drag Free Subsystem (also.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
DECIGO – Japanese Space Gravitational Wave Detector International Workshop on GPS Meteorology January 17, Tsukuba Center for Institutes Seiji Kawamura*
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
LISA News from ESA O. Jennrich LISA Project Scientist.
G R LIGO Laboratory1 The Future - How to make a next generation LIGO David Shoemaker, MIT AAAS Annual Meeting 17 February 2003.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
Deci-hertz Interferometer Gravitational Wave Observatory (DECIGO) 7th Gravitational Wave Data Analysis Workshop December 17, International Institute.
1 Integrated Modeling Stephen Merkowitz. 2 May 13, 2003 Integrated Modeling LISA has intricate interactions between subsystems that require an integrated.
ALIGO 0.45 Gpc 2014 iLIGO 35 Mpc 2007 Future Range to Neutron Star Coalescence Better Seismic Isolation Increased Laser Power and Signal Recycling Reduced.
Space Gravitational Wave Antenna DECIGO Project 3rd TAMA Symposium February 7, Institute for Cosmic Ray Research, Japan Seiji Kawamura National.
Mike Cruise University of Birmingham Searching for the fifth dimension using gravitational waves.
ST7 Interferometer LIGO-G Z1 The ST7 Interferometer Andreas Kuhnert Robert Spero Jet Propulsion Laboratory California Institute of Technology.
LOGO Gravitational Waves I.S.Jang Introduction Contents ii. Waves in general relativity iii. Gravitational wave detectors.
Mike Cruise University of Birmingham Searches for very high frequency gravitational waves.
LISA Laser Interferometer Space Antenna: The Mission Mike Cruise For the LISA Team.
Preparing for the Future: NASA's Planning for the Decadal Survey
Critical Technology Giant leaps Near-term steps Non-IFO methods
DECIGO Pathfinder Masaki Ando
GW150914: The first direct detection of gravitational waves
Nergis Mavalvala (age 47)
Quantum Optics and Macroscopic Quantum Measurement
Systems Engineering Management
Detection of Gravitational Waves with Interferometers
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Squeezed Light Techniques for Gravitational Wave Detection
Presentation transcript:

G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19, 2005 LIGO-G Z

G O D D A R D S P A C E F L I G H T C E N T E R 2 This Talk LISA – Budget and schedule – Technology LISA Pathfinder – Technology demonstration mission

G O D D A R D S P A C E F L I G H T C E N T E R 3 LISA – Search for Gravitational Waves A variety of astrophysical phenomena produce low- frequency gravitational waves – Massive BH binary coalescence – Massive BH capture of stellar mass BH – Galactic compact binaries LISA will measure strain from GW’s of Measure position to m, spacecraft separation of 5 x 10 9 m Need to isolate test masses from N external forces

G O D D A R D S P A C E F L I G H T C E N T E R 4 LISA Organization LISA is a partnership between NASA and ESA – Joint management agreement signed 8/04 – ESA to provide optical bench, optics, other hardware Provides launch vehicle for technology demonstrator Goddard and JPL participation within NASA – Goddard responsible for project management, provides spacecraft, final integration and test – JPL leads US science team, provides phase meter, other hardware Lots of politics for $2B!

G O D D A R D S P A C E F L I G H T C E N T E R 5 LISA Schedule LISA funding and schedule has been impacted by the transformation of NASA – Implementation of exploration vision has made science funding uncertain – LISA budget for 2005 is $13M, half of expected LISA formulation has begun – Products: project plan, staffing, WBS, etc…. Launch date now 2013 – Technology development Little money for this so far – Phase C/D (implementation)

G O D D A R D S P A C E F L I G H T C E N T E R 6 LISA Technology Drivers Picometer interferometry – 1 W laser (space qualified, 5 year lifetime) – Phase meter (10 -6 radian over 1000 sec at 20 MHz) – Frequency stabilization of laser ( over 1000 sec) – Time Delay Interferometry (10 8 attenuation of f-noise) Arm cavity locking (30 sec time delay) Drag-free spacecraft control –  -Newton thrusters (5 year lifetime) – Torsion pendulum force studies ( N over 1000 sec) – Test mass caging mechanism $60 M, 4 year program – Not yet underway

G O D D A R D S P A C E F L I G H T C E N T E R 7 Technology Development Providers ProductNASA IndustryTest Flight R&D Laser X Interferometer XX TDI X Microthrusters X XX Low force noise XX Caging XX

G O D D A R D S P A C E F L I G H T C E N T E R 8 LISA Pathfinder (Technology Demo) Test of drag-free control system and precision interferometry Interferometer reads out residual noise on out-of-loop mass 10 pm, 3 x N over 300 sec

G O D D A R D S P A C E F L I G H T C E N T E R 9 LISA Pathfinder Experiments flown by both NASA and ESA on the same (ESA) spacecraft – $300 M (technology development) mission Goals – Measurement of acceleration noise Understand components of noise: magnetic, thermal, charging, patch effect, etc. Measure coupling of test mass to spacecraft – Precision interferometry on free-falling masses – Flight test of caging mechanism – Thruster performance Schedule – Delivery of both instruments to ESA by 6/06 – Launch 6/08

G O D D A R D S P A C E F L I G H T C E N T E R 10 Lisa Pathfinder Interferometry Investigation of many LISA interferometry issues Stability, alignment-length coupling, etc.

G O D D A R D S P A C E F L I G H T C E N T E R 11 Torsion Pendulum Force Noise Study Thermal noise limit of pendulum within 1/10 of test flight goal Fluctuating surface potentials (1 mV at Hz) presents noise Independently measured with Kelvin probe

G O D D A R D S P A C E F L I G H T C E N T E R 12 Advanced Torsion Pendulum 4 mass design directly sensitive to force 10 cm arms increase force sensitivity

G O D D A R D S P A C E F L I G H T C E N T E R 13 Two experiments on Pathfinder NASA and ESA will fly separate experiments – Use of different technologies – Higher probability of success TechnologyNASA ESA Interferometerhomodyneheterodyne Thrusterioncolloidal System Engineeringin-houseindustry

G O D D A R D S P A C E F L I G H T C E N T E R 14 Summary LISA has suffered some “slings and arrows” of the new NASA exploration vision – 2 year delay in full mission ramp-up – Ground-based technology development also delayed LISA Technology Demonstration Mission is fully funded – Interferometry, drag-free control meeting goals ~1/10 LISA requirements – Launch date of 6/08