The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.

Slides:



Advertisements
Similar presentations
Doing Order of Magnitude Cost Estimates (C) 2002 Dr. Bradley C Paul.
Advertisements

Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
Sequencing Mining Operations with MineSight® ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
McGill Consulting Asif Kan Alexandre Marinho de Almeida Michael Spleit Ahmed Ragab Mine Production Scheduling of a Porphyry copper deposit February 15,
MineSight VALP Optimizing Cut-Off Grades © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides.
Surface Mining (The Concept of Surface Mining) Mnge 315 ©Dr. B. C. Paul Spring 2003 revisions 2010, 2011 These slides contain concepts considered by the.
Surface Mining Ore Deposit Grades ©2011 Dr. B. C. Paul Note- The information contained in these slides is considered common knowledge to those schooled.
An Introduction to MS Reserve
Lesson 13.2 Mining More than a ton of waste may remain after extracting just a few hundredths of an ounce of gold.
The Quasi - Open Pit Methods Mnge 315 ©Dr. B. C. Paul spring 2003.
Applications in GIS (Kriging Interpolation)
Mining removes rocks and minerals that contain useful metals from the Earth’s crust. Metals-2-1 Image: G. Plumlee, USGS.
Pre-Feasibility Study Cost Estimation Resources ©2002 Dr. Bradley C. Paul.
Itemized Cost Estimates ©2002 Dr. Bradley C. Paul.
Engineering Systems Analysis for Design Richard de Neufville  Massachusetts Institute of Technology Use of Simulation Slide 1 of 19 Use of Simulation.
2008 Sr. Design Project ©Jan 2008 Dr. B. C. Paul Plans were made by the Author. MineSight® is proprietary software of Mintec Inc., Maps are taken from.
The Formation, Mining, and Use of Minerals
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Lecture 11 Optimizing Cut-Off Grade Strategy
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Adding Roads and Benches To A Pit Design ©2007 Dr. B. C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Computer Aided Design of an Open Pit ©2007 Dr. B. C. Paul.
Entering My Haul Road Profile ©2009 Dr. B. C. Paul Note- This presentation draws on previous notes developed as early as 2000 and contains numerous screen.
Calculating Stripping Ratios for Area Strip Mines Mnge 315
Post Break Week 3. Metal Miners This weeks presentation is much improved over last weeks, however, critical design problems remain including – Floating.
Sequencing Mining Operations with MineSight®
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
Senior Design Spring 2011 ©2011 Dr. B. C. Paul Acknowledgement is given to Companies whose design software is referenced by trademark name in this presentation.
Obtaining Information From the Geologic Block Model
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Using Statistical Interpolation to Build Block Models – Part III (Using Pintrp.dat to project sample values to blocks) Using MineSight® ©2007 Dr. B. C.
Introduction Mnge 460 Sr. Design Project ©Dr. B. C. Paul 2003.
Building Economics. In this Example we Start With Western Mine Cost Service Models.
Compositing Assays To The Chosen Bench Height ©2007 Dr. B.C. Paul {Note – The Name MineSight® and the Program described are property of Mintec Inc – Tucson,
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Class Introduction Surface Mining ©2007 revised 2011 Dr. Bradley C Paul.
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Resources Evaluation Nuclear Fuel Resources Boston October 13 – 14, 2010 Jean René BLAISE.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Computer Aided Mine Design (Part I – Ultimate Pits) Mnge 315 ©Dr. B. C. Paul spring 2003.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Planning Surface Mines Mnge 315 ©Dr. B. C. Paul 2003.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
Using Statistical Interpolation to Build Block Models – Part II (Setting up Files and Coding Air Blocks) Using MineSight® ©2007 Dr. B. C. Paul revisions.
Open Pit Planning and Design The Standard Approach for Open Pit ©2007 Dr. B. C. Paul.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Molybdenum Ores and Minerals (Another Porphyry Deposit Metal)
Mineral Exploration Tel: (07) Fax: (07)
How we get our minerals and rocks
Analogy Technique Chapter Analogy - Method Comparative analysis of similar systems Adjust costs of an analogous system to estimate the.
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
Unit #4 Carlson Software. Carlson is an Autocad Overlay Designed to build specialized commands into a widely used drawing package Largely 2D or a highly.
Chapter 27 Minerals and the Environment. Mining Removal of minerals & fossil fuels from the Earth’s crust.
Slopes in MSOPT Calculations ©2012 Dr B. C. Paul Note – These Slides are based on and include screen shots from the program MineSight by Mintec. Credit.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
DASARI SURESH ASST. MANAGER (MINING)  What is fragmentation ?  Fragmentation is the process of breaking the solid in-situ rock mass into several smaller.
The Quasi - Open Pit Methods Mnge 315
Economic Geology Teaching program: 1) Ore Geology 2) Ore Mineralogy 3) Hydrothermal Geochemistry 4) Modeling Hydrothermal Systems 5) Mining Course Economic.
D.G. MacIntyre & Associates Ltd. Overview of the Glacier Gulch (Yorke-Hardy) Porphyry Mo-W Deposit presented by Don MacIntyre, Ph.D., P.Eng. Consulting.
Checking On Production ©2009 Dr. B. C. Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the.
Monday 1/9/17 Copy this week’s schedule into your assignment notebook
COURSE OBJECTIVE: Both geological and mining programsGEMS modelling mine closer planning  equip the students with knowledge in general fuctionable mine.
Mining removes rocks and minerals that contain useful metals from the Earth’s crust. Image: G. Plumlee, USGS Metals-2-1.
Think Break #7 Grain (lbs) Hay MRTS price ratio
Thursday 2/1/18 Notebook Entry: Estimate how many pounds of copper you will use in your lifetime. The U.S. Geological Survey (USGS) estimates that every.
Minerals and the Environment
Mining removes rocks and minerals that contain useful metals from the Earth’s crust. Image: G. Plumlee, USGS Metals-2-1.
Wednesday 4/24/19 Bell Ringer: Estimate how many pounds of copper you will use in your lifetime. The U.S. Geological Survey (USGS) estimates that every.
Presentation transcript:

The 2007 Class Project ©2007 Dr. B. C. Paul

The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit is close enough to surface to be surface mined – open pit –Will be first year for using powerful mine planning software [Minesight] During any week we will have lectures on multiple subjects – need to be learning several things at once

How Weeks are Set Up One set lectures on Software One set of lectures on procedures for design One set of lectures on reporting or estimating or economic analysis Each week will have one or more tasks – often in several of the areas that will be spot checked the following week. –(no the work load for this course is not fair)

How Do You Design a Hardrock Open Pit Metal Mine? Need basic feed data –Geologic exploration data for developing a reserves model –Price data to enable one to bracket likely selling price ranges for product (Cu is usually between 60 cents and $4/lb) –Need to have basic cost data for mining, processing ore and refining product –A lot of our first efforts will deal with compiling this fundamental feed data

The Hocus Pocus Dilemma Mine costs depend on equipment size, type, and mining rate Bench Heights depend on equipment size Exploration composite intervals depend on bench heights Block sizes depend on composite intervals Reserves depend on costs and block models Proper Equipment size and mine rate depends on reserves

Breaking Out of the Loop Basic feed data allows one to make initial guesses of parameters that will usually be pretty good once things get going.

Overview Continuation Drill Hole Data is fed into interpolation and geologic models to project ore and rock type and grade onto a 3 dimension grid of blocks called a block model Cost Estimates are used to covert each blocks ore grade and rock type into an economic value. Computer algorithms scan the block model for the set of blocks that yields the greatest total worth –Called the Ultimate Pit –Ore removed is then assessed for grade and quantity to produce a grade and tonnage relationship

Continuing Ore Reserves are used to estimate mine life, production rate, check equipment type Manipulation of prices or costs are then used to get routine to pit smaller richer pits –These pits then used to form stages starting with richest ore and then moving to limits Grade Tonnage Curves are then produced for each stage An optimization routine picks a dynamically changing Cut-off grade for each stage Equipment and tonnages are then fixed throughout life of mine Costs are determined and economics evaluated.

Starting Your Work Researching Metal Prices –USGS has site that gives inflation adjusted prices by metal

Continuing Work Select Copper and Excel Format

Price Data to 2004

More Recent Data ( )/2=1.65

Adding Data Add the Recent Price Data

Need to Get All Values to Common Basis 1998 = = Ratio is 200.6/162.3 = Multiply all prices in 1998 by to get 2006 data

Get on a Common Basis

Copper Price

Putting in SPSS

The Data