Energy Export Scheme? Contractual and Commercial Elements of Hydrocarbon Exports-What Can Be Taken Over to a Renewable Renewable Energy Workshop, Casablanca,

Slides:



Advertisements
Similar presentations
ISTISNA AS MODE OF FINANCE
Advertisements

1.
Energy, Climate and Economic Development Producers Point of View Energy Security: How to Ensure Supply for the EU and its Neighbours? Danila Bochkarev.
IMPACT ESTIMATION PROJECT h o r i z o n s c a n n i n g Anti-trust issues in on-line retailing Ed Smith Director Office of Fair Trading The views expressed.
The Single Electricity Market in Ireland
Competition Effects of the Renewable Energy Policy Reform in Flanders: Is the Flemish market for Green Electricity Certificates working properly? Annemie.
1 Capacity mechanisms - IFIEC position June 12 th 2012.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU PT Market.
IMPACT ESTIMATION PROJECT h o r i z o n s c a n n i n g Observations on retail-MFNs and RPM Nelson Jung Director, Mergers Office of Fair Trading The views.
Public-Private Partnerships: Basic Considerations, Accounting and Reporting Issues Presentation by Max Alier Resident Representative in Brazil International.
Chapter 10 Derivatives Introduction In this chapter on derivatives we cover: –Forward and futures contracts –Swaps –Options.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
1-1 McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Human Resource Management Gaining a Competitive Advantage Chapter 12 Recognizing.
______________________________________________________________ 1 Who are OGP? International Association of Oil & Gas Producers: - Exploration and production.
Recent Trends in Energy Regulation IEA-FTS of Russia Workshop on Global Energy Market Scenarios Paris, 28 May 2009 Kieran McNamara Country Studies Division.
Foreign Exchange Chapter 11 Copyright © 2009 South-Western, a division of Cengage Learning. All rights reserved.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
The Organization of the Firm
Copyright © 2008 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Managerial Economics, 9e Managerial Economics Thomas Maurice.
Using alternative financing tools to improve agribusiness finance by Yan Zhang UNCTAD Caribbean Rural Development Briefings
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Principles of foreign exchange Chapter 4. Overview Trading one currency for another arises from the elements that make up a nation’s balance of payments:
Recognizing Employee Contributions with Pay
1 Are We Ready For The Future? 2005 NIPPC Annual Meeting September 8, 2005 Michael R. Niggli President, Sempra Generation.
LEARNING OUTCOMES 6 & 7 INFLATION & EMPLOYMENT. INFLATION This is an important performance indicator. It measures the rate of change in the general level.
How can CDM help project finance? Jan-Willem Martens, Bangkok, 5 April, 2005.
Global Natural Gas: Market in Transition The Impacts of U.S. LNG Exports Kenneth B Medlock III James A Baker III and Susan G Baker Fellow in Energy and.
Regulatory Approaches to Managing Investment Uncertainty Gülefşan Demirbaş ICER VWG2 Co-Chair.
GB Electricity Market Reform: The implementation challenges ahead IAEE International Conference Stockholm, June 20 – Dorcas Batstone
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
MAY 17, 2001 ENERGY MARKETS IN TURMOIL PRESENTED TO THE INSTITUTE FOR REGULATORY POLICY STUDIES
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
CMA Part 2 Financial Decision Making Study Unit 5 - Financial Instruments and Cost of Capital Ronald Schmidt, CMA, CFM.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
XV International Research Conference “Public Sector Transition” St- Petersburg, 8-9, November, 2013 Collusion in Markets Characterized by One Large Buyer:
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
Energy Charter Secretariat NEEDS Forum 2 Krakow, 5-6 July 2007 Tim Gould Senior Advisor to the Secretary General Energy Charter Secretariat An Energy Charter.
Agricultural Contracts John C. Becker Penn State University.
Long-term modeling of resilience and flexibility of European gas transportation system: integrated factors Dresden, April 3, 2009 Vitaly Protasov, Expert,
Illinois Wholesale Market Update December 10, 2003.
IFIEC EUROPE 1 Energy markets liberalisation in the EU Industrial consumers’ expextations Peter Claes President - IFIEC Europe SVSE – 6 September 2006.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Contract Pricing Principles. What is pricing? Pricing: The process of establishing a reasonable amount or amounts to be paid for supplies or services.
Renewable Energy and Energy Efficiency: What’s it good for? 4 th Poverty Reduction Strategy Forum.
“The Russian gas industry: peculiarities of legal regulation” Anastasia Polyakova, HSE Kaliningrad, 25 th of October, 2013.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
+ Aggregate Supply Chapter Aggregate Supply (AS) Is the total amount of goods and services that all the firms in all the industries in a country.
1ST ICC AFRICA REGIONAL ARBITRATION CONFERENCE, LAGOS. NIGERIA. PARALLEL SESSION ON ENERGY DISPUTES Take or Pay Gas Sales and Gas Pricing Disputes Lekan.
Fuel Cost Components in the Fuel Adder
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Managers, Profits, and Markets
Flexible Forward Contracts for Renewable Energy Generators
Managers, Profits, and Markets
CHAPTER TEN Liquidity And Reserve Management: Strategies And Policies
Long-term Capacity Market
Market vs non-market distinction
The work of European energy regulators on generation adequacy
Incentives for electricity infrastructure – ERGEG view
ICRES Session 2: Data sources for CRE statistics
Solar Energy Commercialization Session 11
Managers, Profits, and Markets
Manager, Supply Resource Planning
Who wants to live forever?
Presentation transcript:

Energy Export Scheme? Contractual and Commercial Elements of Hydrocarbon Exports-What Can Be Taken Over to a Renewable Renewable Energy Workshop, Casablanca, Morocco and Tunis, Tunisia Nov. 23, 2010 Justin Dargin Dubai Initiative Kennedy School of Government-Harvard University

Main Discussion Points  The use of take or pay contracts in the natural gas sector and the impact of regulations on the contracts as well as optimal contract duration.  The applicability of these contracts to power export to the EU as well as the renewable energy sector.

Main Points: Contractual forms The transaction cost theory: because of the specific upfront capital investment required on both the sellers and the buyer (pipeline connections, etc.) the irreversibility of such infrastructures creates the potential risk of “hold up” and illustrates that pricing in the gas market is the outcome of long-term bilateral agreements. In long term “take of pay “ contracts which link the sellers and buyers for a long period of time, generally years, both parties have strictly defined obligations where the take or pay clause requires that has to be paid whether taken or not, and specifies an obligation for the seller to make available defined volumes of gas. Hold Up Problem: In terms of the natural gas sector, when there is one party that commits capital that has little value for alternative uses, the other stakeholder has a strong incentive to appropriate the rents which arise from the relationship through opportunistic behavior.

Issues with Duration Main Problem with long term contracting: Inflexibility in the face of supply and demand fluctuations. Attempted solution: Parties will stipulate certain clauses. Such as: Price floor, prices are rigid downward but can raise following price escalators, as predefined increases per year or petroleum price index. Redetermination clauses provide renegotiation of the terms of the contract at predetermined intervals.

Take or Pay Take or Pay: The Take or Pay clause requires that gas has to be paid for whether it is taken or not, and the clause specifies an obligation for the seller to make available defined volumes of gas. The take amount can be specified in two ways: Allows the buyer to take a quantity which is a specified percentage of the production within a given lifetime. The take amount can be based on a percentage of production capacity of the well. With both the reserves and the capacity are tested periodically, these indicate from changes, the buyer can be asked to modify the take quantity, though the percentage itself is fixed. In order to absorb seasonal demand fluctuations, annual take requirements may be modified and complemented by monthly or daily withdrawals.

Suggestions for Power Export and Renewable Energy Contracts Long-term take or pay contracts are able to minimize regulatory uncertainty, they create appropriate incentives for location placement and operation, allow for efficient system operation and are generally compatible with the tradition of state directed development in the region. Take or pay contracts can include differentiated payments according to the technology utilized or locally available resource base. Because these payments are built in with the long term contracts, the differentiation does not create regulatory risk. It is desirable to create a renewable energy support scheme that protects investors from the regulatory uncertainty that arises from the evolution of grid access, congestion management and balancing. Take or pay contracts can encourage this certainty/stability as they ensure that revenue streams remain stable in the event of any market design changes.

Thank you for your Attention