2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.

Slides:



Advertisements
Similar presentations
Additional CREs to address Stability Limits Beth Garza TAC June 26, 2008.
Advertisements

Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
2004 Congestion Costs. 2 Transmission Congestion Occurs when analysis shows a given outage of a transmission element (contingency) will result in the.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
NRG Comments/Concerns with HIP Assumptions January 21, 2014 RPG Meeting NRG Comments/Concerns with HIP Assumptions - January 21, 2014.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
ERCOT WHOLESALE MARKET OPERATIONS MODULE 2. 2 Essential Concepts Ancillary Services Congestion Management Topics.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Economic Planning Criteria Question 2 1/7/2011 Joint CMWG/PLWG Meeting March 4, 2011.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
PJM©2013www.pjm.com Demand Side Working Group Loads in SCED Angelo Marcino Real-Time Market Operations – PJM April 14, 2014.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
1 TAC Report to the ERCOT Board February 21, 2006.
2% Shift Factor rule and associated price discrepancies Kris Dixit 1.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
1 TAC Report to the ERCOT Board February 16, 2005.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
2010 CSC & Zone Selection: 6 Lines W-N & 4 Zones (WN2_SN0-4Z) Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) August 19,
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
ERCOT Wholesale Market Basics Module 2 Market Operations.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
1 Economic Dispatch Sub-Committee Meeting Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin September 24,
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
TAC Rejection of NPRR Mitigated Offer Caps for RMR Units
TAC Report to the ERCOT Board
PRS Rejection of NPRR Mitigated Offer Caps for RMR Units
RMR Update November 6, /05/2002.
Review of Abnormal MCPEs
The New Texas Wholesale/Retail Market
North American Markets Status
Presentation transcript:

2004 CSCs & Zones

Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion costs to load serving entities (LSEs)

Causes of Uplift? And A Comprehensive Solution Uplifted non-CSC charges associated primarily with ERCOT’s solving of local transmission congestion and reliability concerns –Out-of-Merit Capacity (OOMC) – ERCOT command and control instructions to resources used to provide reactive power to grid and to avoid certain contingencies –Out-of-Merit Energy (OOME) – ERCOT command and control instructions to resources used to redispatch generating units to solve non-CSC congestion –Local Balancing Energy Service (LBES) – ERCOT instructions issued to resources based on competitive bids from resource owners to redispatch generating units to solve non-CSC congestion –Reliability Must-Run (RMR) – ERCOT contracts with certain resources to provide reliability services where the resource owner would otherwise retire or mothball the resource. Resource owners offer the resource to ERCOT and ERCOT determines whether the unit is required for reliability purposes A Comprehensive Solution is Required –Fix the Operational Tools -- Implement already-identified system changes and PRRs to eliminate problems related to oscillatory deployments, ramp rates and the like, as well as other ERCOT computer system fixes identified on the timeline for EMMS 3.x, and in parallel, –Create Proper Incentives -- Identify a more complete set of CSCs, and related Zones, to create economic incentives that are not counter to maintaining the reliability of the ERCOT grid

2004 Proposals Status Quo –4 Zones/3 CSCs Status Quo Plus –4 Zones/4 CSCs (Adds CSC between North & Houston zones) Northeast Zone –5 Zones and 5 CSCs (Adds CSC between North & Houston zones and adds Northeast Texas zone/CSC) 7 Zones and 11 CSCs –Subdivides the North zone into 3 zones and subdivides the South zone into 2 zones

EXISTING ZONE / 3 CSC S – H CSC S – N CSC W – N CSC

Status Quo-Type Proposals Do Not Address Known Problems Adding North-Houston CSC addresses known congestion into Houston from North Adding Farmerville-Royse CSC addresses known congestion in Northeast Texas However, adding only these two new CSCs does not give ERCOT all the tools required for managing North zone congestion None of the status quo-type proposals address congestion in the west of Marion area None of the status quo-type proposals provide incentives to reduce the increasing cost of DFW congestion

2004 CSCs/Zone Selection CSC selections should decrease in the amount of uplifted congestion costs borne by load serving entities to the greatest degree possible CSC selections should not ignore the significant amount of congestion costs in the DFW area of the existing North Zone CSC selections should measurably reduce out-of- merit commitments and deployments in the DFW area that run counter to market incentives SPS/RAP may alter the number and value of TCRs per CSC, but cannot eliminate need for CSCs unless guaranteed by TDSP(s)

7 Zones/11 CSCs Pros –Increases market efficiency and reduces uplift –Addresses existing and potential points of major transmission congestion –Provides ERCOT the full range of tools required for managing North zone congestion –Creates operational and market transparency in North zone –Addresses expected Zorn/Marion congestion

7 Zones/11 CSCs Cons –Step change from current to multiple zones/CSCs –Would increase zonal balancing energy prices in DFW (although, experience in Houston zone has shown this not to be a problem) –Some QSEs hedging costs may be greater than their previous share of uplifted costs (i.e., subsidization of congestion costs will be reduced or eliminated in some cases)

ZONE / 11 CSC

Why Be Concerned With Market Efficiency and Uplifted Costs? Uplifted non-CSC charges for the year-ended May 2003 were nearly $300 MM –Charges would be nearly $334 MM with annualized RMR

ERCOT Implementation ERCOT can implement 7 Zone/11 CSC proposal with existing resources –Added zones/CSCs do not materially affect system performance –System updates can be done by January 1, 2004 both in terms of cost and schedule

Conclusions The 7 Zone/11 CSC proposal reduces uplift by directly assigning the costs to those QSEs that incur them The 7 Zone/11 CSC proposal provides ERCOT with the tools required to manage existing CSCs plus the tools required (1) to manage North zone congestion (2) to manage west-of-Marion congestion and (3) to create transparency on both operational and market levels