PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.

Slides:



Advertisements
Similar presentations
PMT Calibration Results and the MC simulation Shigeru Yoshida, Chiba University
Advertisements

FTP Biostatistics II Model parameter estimations: Confronting models with measurements.
07/19/04NGA Workshop: Fling1 Progress Report on Fling Processing Baseline correction Boore’s method (with judgement) Fling model and removal Sine-Pulse.
HLT & Calibration.
OD Calorimetry Study Update — Z vertex position dependence Jaewon Park University of Rochester MINERvA/Jupiter Group Meeting, May 17, 2006.
How We Became Experimentalists Suzanne Levine Saba Zuberi Len Zheleznyak REU 2002.
Active Appearance Models Computer examples A. Torralba T. F. Cootes, C.J. Taylor, G. J. Edwards M. B. Stegmann.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
J.P. Gómez-González. Outline Introduction: The ANTARES neutrino telescope Time calibration Muon track residuals based method: Description and implementation.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
IceCube: String 21 reconstruction Dmitry Chirkin, LBNL Presented by Spencer Klein LLH reconstruction algorithm Reconstruction of digital waveforms Muon.
Analysis of PSI beam test R.Sawada 09/Feb/2004 MEG collaboration R.Sawada 09/Feb/2004 MEG collaboration
Saturation in V-calib LED scans CALICE AHCAL – Main Meeting 2010/07/05 Jaroslav Zalesak analysis still in progress but gives global results FNAL & CERN.
S-2S MEMO Toshiyuki Gogami 17 May Contents Analysis results of WC test.
Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
EAS Reconstruction with Cerenkov Photons Shower Simulation Reconstruction Algorithm Toy MC Study Two Detector Configuration Summary M.Z. Wang and C.C.
Shifting the Position of Focal Point of Proton Beam Relative to Intersection Point with Fixed Emittance for IDS120h Configuration X. Ding, UCLA Target.
Multiple Regression Petter Mostad Review: Simple linear regression We define a model where are independent (normally distributed) with equal.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
Liquid Xenon Calorimeter Analysis R.Sawada on behalf of the MEG LXe analysis group 17/Feb/2009.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
Spoken Language Group Chinese Information Processing Lab. Institute of Information Science Academia Sinica, Taipei, Taiwan
ALICE Offline Week, CERN, Andrea Dainese 1 Primary vertex with TPC-only tracks Andrea Dainese INFN Legnaro Motivation: TPC stand-alone analyses.
PHOS offline status report Dmitri Peressounko ALICE offline week,
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
C. Oppedisano, 9 October 2007, ALICE Offline Week 1 RECONSTRUCTION ALGORITHM CALIBRATION OBJECT ESD STRUCTURE ONGOING TASKS.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
A. Smith UMD, April 20-21, 2007 Milagro collaboration meeting The Hidden Potential of the “Gamma’’ Data. The Milagro Gamma-Hadron separation is bases on.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
Nov 2002T. Ljubicic DAQ100 Calibration Needs 10 to 8 bit (and back!) conversion table Gain correction per pad T0 correction per pad.
First Look at EMEC Weights using the FFT Algorithm Combined Test Beam Meeting 19 November 2002 Naoko Kanaya & Rob McPherson University of Victoria.
Computer Organization Instruction Set Architecture (ISA) Instruction Set Architecture (ISA), or simply Architecture, of a computer is the.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Adiabatic Quantum Computing Josh Ball with advisor Professor Harsh Mathur Problems which are classically difficult to solve may be solved much more quickly.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
DREAM Coll. Meeting, Rome 2009F. Bedeschi, INFN-Pisa Template Analysis of DRS Data  Motivations  Preliminary results F. Bedeschi, R. Carosi, M. Incagli,
TPB evaporation Maura Spanu, Università di Pavia, INFN Pavia WA-104 weekly meeting 24/02/2016.
Basic Measurement of the Hamamatsu 10 inch PMT at –40 degree –40 degree Hiroko Miyamoto Dept. of Physics CHIBA University The Uniformity measurement of.
Comparison of MC and data Abelardo Moralejo Padova.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
Yonsei – Tsukuba Workshop / Hiroshi Tsuruoka / Aug 1 Current Status of TOF Analysis 1. PHENIX 実験とは 2.なぜ新たな検出器が必要か? 3. Time Zero Counter の設計 4.テスト実験(
GEOMETRIC CAMERA CALIBRATION The Calibration Problem Least-Squares Techniques Linear Calibration from Points Reading: Chapter 3.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
M EASURING L IGHT G UIDE P ERFORMANCE IN L IQUID A RGON Jarrett Moon Massachusetts Institute of Technology FNAL New Perspectives – 6/9/15.
Zero Property of Multiplication Only works for multiplication Any number multiplied by zero will always be zero Examples: 4 x 0 = 0 0 x 567= 0.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
Monitoring Energy Gains Using the Double and Single Arm Compton Processes Yelena Prok PrimEx Collaboration Meeting March 18, 2006.
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
HLT & Calibration.
Ice Investigation with PPC
Alon Attal Martin von der Mey Jay Hauser Mike Lindgren
Beam-Based Alignment Results
Signal studies OUTLINE 1- Signal extraction
Energy Calibration with Compton Data
Drift Chamber Monitoring
Presentation transcript:

PMT time offset calibration (not completed) R.Sawada 27/Dec/2007

2 Database to store time offset of each PMTs were prepared. This is similar to gain and Q.E. database. A task to compute time offset by using LED runs was prepared (XECPMTTimeOffsetCompute). This is available with “xec” affiliation. Time offset calibration during analysis was added to XECPMTFill task. This is used when DRS time is used for analysis. Time offset simulation was added to bartender. Time offset during simulation and analysis can be different.

3 Time offset computation Multiple LED runs are used. In each runs, only one LED is activated so that position of light source is known. Event by event fluctuation of LED pulse. => Use time difference from one reference PMT (always same one during a run). Run by run fluctuation (Reference PMT is different run by run) => calibrate by using mean of all PMTs. Limited speed of light. => Fit “time v.s. distance” distribution. Jitters

4 Procedure 1 (Estimation of time) At the end of these steps, following data is obtained. A point corresponds to a PMT in a run. Time offset [nsec] Distance [cm] Estimate time Correct run offset

5 Procedure 2 (Minimization) Parameters : Speed of light, time offset of each PMTs. Minimization is done by Minuit. Parameter for Minuit is only the speed of light. Minimization of time offset of PMTs is done in fitting function. At the end of these steps, following data is obtained. A point corresponds to a PMT in a run. Time offset [nsec] Distance [cm]

6 Result ? It seems there is still a problem to align time of different runs. The final result will be after the problem is solved. With current implementation, speed of light is faster than c. This might be solved by improving alignment of runs. Time offsets are shifted so that mean of all PMTs becomes zero.