Doc.: IEEE 802.11-05/xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 1 Tree Based Routing Protocol (I20) 2005-07-21 Five Minute Summary.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0300r1 Submission May 2007 Guenael Strutt, MotorolaSlide 1 LB93 Unresolved RFI Comments Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /0866r1 Submission September 2005 Michael Montemurro, Chantry NetworksSlide 1 Mobility Domain Definition and Description Notice: This.
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /1867r1 Submission November r Security TeamSlide 1 TGr Security Requirements Notice: This document has been prepared to.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /0358r0 Submission March 2007 Zhao and Walker, Intel CorpSlide 1 Thoughts on Peer Capacity Date: Authors: Notice: This document.
Doc.: IEEE /0641r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 1 Tree Based Routing Protocol NOTE: this document replaces.
Doc.: IEEE /1091-r0 SubmissionGuenael Strutt, Jan KruysSlide 1 July 2006 Interworking Considerations Date: Authors: Notice: This document.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0072r0 Submission January 2009 Slide 1 Proxy ARP Issue for Direct Link Setup Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1212r0 Submission TGT and MEF Liaison Notice: This document has been prepared to assist IEEE It is offered as a basis for.
Doc.: IEEE /86r2 Submission March, 2010 Gabor BajkoSlide 1 Location Proxy Notice: This document has been prepared to assist IEEE It is.
Doc.: IEEE /0028r0 Submission January 2005 Eleanor Hepworth, Siemens Roke ManorSlide 1 Definitions and Terminology Notice: This document has been.
Doc.: IEEE /r0 Submission November 2005 Xin Yu and Hang LiuSlide 1 Implementation and Evaluation of AODV with Proactive Route Announcements.
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0197r0 Submission March 2005 Nancy Cam-Winget et alSlide 1 TAP & JIT Merge Process Notice: This document has been prepared to assist.
Doc.: IEEE /0460r1 Submission March 2006 Fujio Watanabe, DoCoMo USA LabsSlide 1 Japanese Emergency Call Regulation Notice: This document has been.
Doc.: IEEE /1006r0 Submission September 2005 Andrew McDonald, Siemens Roke ManorSlide 1 Initial Network Selection Concept Notice: This document.
Doc.: IEEE /2112r1 Submission Peter Loc, MarvellSlide 1 TGn LB97 Frame Format Ad Hoc San Francisco, July 2007 Notice: This document.
June 2005 doc.: IEEE /0593r0 July 2005 Summary Presentation Proposal L:19 Siemens Proposal for WLAN Mesh Networking Date: Authors:
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
3GPP Extended Date: Authors: July 2005 July 2005
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
(Presentation name) For (Name of group) (Presenter’s name,title)
On Coexistence Mechanisms
TGu-changes-from-d0-02-to-d0-03
On Coexistence Mechanisms
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
Solution for comment 32 Date: Authors: July, 2008
IEEE WG Opening Report – July 2008
Proposal for Resolving Comments on Intra-Mesh Congestion Control
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
MAC Address Spoofing in Mesh
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
Presentation transcript:

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 1 Tree Based Routing Protocol (I20) Five Minute Summary Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at.

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 2 The focus of our proposal Routing/forwarding is a key part any mesh solution The ability to handle any scale of network is a key to major market segments like home, municipal and enterprise networks Simplicity of design and operation is critical for success and for rapid progress with this standard mobility simplicity functionality network size

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 3 Tree Based Routing Aimed at the typical access network: “fixed” installations but that also works well for small, flat meshes Organises mesh points into tree structures rooted in major information sources/sinks: –Portals to other (sub)networks - in any scenario –Local Servers - in the office –Screens, DVDs, PCs at home Applications with more demanding requirements are better served by routing schemes that focus on mobility and frequent configuration change

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 4 Tree Construction Trees are easy to construct and maintain: - N sends out a request and gets responses - N learns the path to the root (distance vector, link metrics) - N picks the best and links up Pre-conditions: - Roots announce themselves - Mesh points recognize roots (like STA’s recognize IBSS’ses Root N 4 7 5

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 5 Link Metrics The question is: “will my packet make it quickly to the root” Factors that play a role: net link rate, current load uplink and hop count to root Further (radio metric) detail data is overkill SNR is a good predictor of net link rate Going down link is easier: traffic fans out Routing metric data reported by neighbours: upstream SNR and load, hops Supports simple distributed congestion control Processing and decision making is a local matter and outside scope

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 6 MP and STA Mobility Mesh points: Mesh point mobility is handled by hooking up to another node STAs: Mesh (access) points, and portals learn addresses and keep routing tables Root A A7 A5 STA A2

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 7 Scalability Replication allows scaling to almost any size network Root/Bridge Mesh 1 Root/Bridge Mesh 2 Root/Bridge Mesh 4 Root/Bridge Mesh 3 RSTP /MST

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 8 Summary A simple discovery and binding scheme is all we need to build “mesh connectivity” A tree-based routing scheme should be the baseline of the TGs standard Meets the requirements of many, major applications Complementary schemes that meet specific needs have been identified in other proposals Re-using features and (encapsulated) frame formats facilitates specification as well as implementation

doc.: IEEE /xxxx-r0 Submission July 2005 Jan Kruys, Shah Rahman.e.a, CiscoSlide 9 Thank you for your attention