Overall Data Processing Architecture EVLA timeline and priorities.

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
EVLA Computing Schedule, Staffing, Testing, Tracking.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
EVLA Data Processing PDR E2E Data Archive System John Benson, NRAO July 18, 2002.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Software Overview Sonja Vrcic
Committee Charge Fred K.Y. Lo
Monitor and Control Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Budget, Schedule, Contingency
EVLA System PDR System Overview
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Computing Reorganization
EVLA Advisory Committee Meeting
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Construction Status
Requirements Bryan Butler.
Presentation transcript:

Overall Data Processing Architecture EVLA timeline and priorities

Proposal Preparation and Submission Observation Preparation Observation Scheduling Monitor and Control System AntennaFeedReceiverIF System Local Oscillator Fiber Optics Transmission System Correlator Image Pipeline Data Archive Data Post- Processing Figure 3.1. Principal EVLA Subsystems NRAO Data Management Group (e2e project) Canadian Partner EVLA Project Primary data flow Control and monitor flow CBE

Gustaaf van Moorsel Data Processing Architecture 18 July EVLA Schedule (Calendar years) Start installation of fiber optics cables on YQ Prototype EVLA system lab integration and testQ Install prototype EVLA system on EVLA Test Antenna Q Subsystem CDRsQ Start EVLA electronics production Q Start retrofitting 7 antennas/year with new system Q Start observing in “transition” modeQ Test of prototype correlator on 3 or 4 antennasQ Start outfitting new correlator room Q Start tests of first correlator subset at VLA Q First “shared-risk” science with new correlator subset Q Last antenna retrofitted to EVLA design Q New correlator declared “operational” Q Last EVLA receiver installed Q1 2010

Gustaaf van Moorsel Data Processing Architecture 18 July Interfaces e2e – EVLA M&C Correlator (Backend)  Archive M&C System  Archive Observation scheduling  M & C System Pipeline and Post-processing

Gustaaf van Moorsel Data Processing Architecture 18 July Correlator  Archive Paced by correlator development Q New correlator operational – required Q First science with new correlator subset – highly desirable Q Start test first correlator subset at VLA – desirable Q Test correlator prototype - desirable

Gustaaf van Moorsel Data Processing Architecture 18 July M&C System  Archive Archive (and retrieve) monitor data Paced by antenna upgrades Q Start observing in transition mode – required Q Prototype system on EVLA test antenna – highly desirable Q Prototype bench tests - desirable

Gustaaf van Moorsel Data Processing Architecture 18 July Scheduling  M&C System When to transition from ‘cards’ to new Observation Scheduling System? –Less of a ‘drop-dead’ date –Becomes more important as new M&C system gains importance –Q Start test first correlator subset at VLA – highly desirable

Gustaaf van Moorsel Data Processing Architecture 18 July Pipeline and post- processing Required because: –Amount of data –EVLA specific requirements Q new correlator operational – required Q First science with new correlator subset – highly desirable Q Test first correlator subset – desirable

Gustaaf van Moorsel Data Processing Architecture 18 July Priorities 1.Archive Monitor data – Q / Q Visibility data – Q / Q Observation scheduling – Q Pipeline – Q Observing preparation - TBD 5.Proposal preparation/submission - TBD