For discussion of ATF2 beam time requests SLAC team October 1, 2008.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
10/23/07RTML EDR Oct GDE1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Alignment and Beam Stability
Global Design Effort Experience on Remote Participation in ATF/ATF2 work ATF2 weekly meeting, May 16, 2007 Janice Nelson, Mark Woodley, Sergei Seletskiy,
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF UK plans for Energy spectrometer studies University College London Stewart Boogert.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
BPM Orbit Data Analysis with Wakefields Glen White, SLAC January 2013.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
NanoBPM Signals Second Mini-Workshop on Nano Project at ATF December 11-12, 2004 Toyoko Orimoto Yury Kolomensky Lawrence Berkeley Laboratory & University.
T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Instrumentation Summary: Instrumentation QBPMs, Magnet Movers and Remote Shift Participation Justin May SLAC.
Emittance Measurements and Related Experimental Results 15th ATF2 Project Meeting, January M. Woodley1/44.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
07 June 2006Peter Tenenbaum1 Ring to Main Linac and Low Emittance Transport SLAC DOE Review Accelerator Breakout.
Damping Ring Design and ATF Report Andy Wolski Lawrence Berkeley National Laboratory May 10th 2002.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
M. Woodley ATF Studies Meeting (April 30, 2008) 1 QM7R Vertical Bump Study March 14, 2008.
Flight Simulator for ATF2
DR Kicker R&D: Goals and Work Scope
Expected hardware status and Priority of the commissioning task
Further Tracking Studies and March Trip Plan
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
ATF/ATF2 Control System
March Trip Plan Mikey Davis 01 March /7.
Thursday morning – optics correction
Strip-line Kicker R&D at KEK-ATF
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
ILC DR instability simulations
Presentation transcript:

For discussion of ATF2 beam time requests SLAC team October 1, 2008

November 08 Suggestions from (Responsible are): Doug and Janice: 10/31-11/9 - mover & BPM system checkout –no beam or when beam is not in ext line 11/10 – assume it is the week the beam gets out of the DR. After beam is established to the end of extraction line, work on mover/BPM calibration –Need 3 shifts with beam 11/17 - assuming all's going well, continue with checkout of mover BBA software –Need 2 shifts with beam not consecutive, preferably one early in the week (Tue or Wed) and one later in the week (Thu or Fri)

December 08 Suggestions from (Responsible are): Glen White: Flight Simulator tests –Request = 1 dedicated shift other flight simulator tests will be done in parallel to other work

December 08 Suggestions from (Responsible are): Steve Molloy: Studies of the problematic extraction BPM, record signal on extraction BPMs due to high power RF pulse from kicker, analyze data with/without beam to find best way to filter out kicker pulse –Request = 1 shift (parasitic) –Beam conditions = No beam in the EXT or DR, then some time with single bunch, 1.56 Hz, in the EXT. Kicker eddy currents, Investigate the possibility of the large dB/dt of the rising edge of the extraction kicker waveform inducing spurious sextupolar fields –Request = 1 shift –Beam conditions = Single bunch, 1.56 Hz Flight Simulator tests, Deployment and testing of the beamline modeling tools developed with the FS –Request = 1 shift (in addition to the shift Glen has already requested) –Beam conditions = Single bunch, 1.56 Hz

December 08 Suggestions from (Responsible are): Mauro Pivi: Beam induced measurements of the QM7R magnet error –Request = 1 shift (provided a good method to measure it will be selected) Beta matching DR=>EXT currents –Request = 1 shift (dedicated?)

December 08 Suggestions from (Responsible are): –Andy Wolski –SLAC: Mark Woodley: Complete set of BBA measurement in Damping Ring –Request = X shift number of shifts TBD If the number of shifts large, should it happen in 09? Discussion: –Complete set of BBA measurements for DR should be done before a lot of tuning is done –We have a rather slow process for doing BBA –New BBAs were done recently by Okugi-san and others using an ATF-created package –It would be useful to hear details of how Okugi-san's package works in order to decide how to proceed. –It's possible that data collected is the same for both techniques, and that we could analyze it both ways as a cross-check