P.NapierEVLA Advisory Committee, 10 June, 2002 1 EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.

Slides:



Advertisements
Similar presentations
1 National Radio Astronomy Observatory The EVLA -- Status, Future Rick Perley National Radio Astronomy Observatory.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
1 National Radio Astronomy Observatory EVLA Status -- Jim Ulvestad, for Mark McKinnon, Rick Perley, and the EVLA Team.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Tim CornwellEVLA System PDR Dec 5-6, EVLA: Data Management EVLA sub-contracts data management to NRAO Data Management group –End-to-end processing.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Transition Operations Claire Chandler.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Committee, 11 June EVLA Phase II Implementation/Funding P. Napier.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
ALMA Project Status Adrian Russell. Where is ALMA? El llano de Chajnantor ALMA.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Future LBO Developments
EVLA Front-End CDR – EVLA Front-End Schedule
EVLA Project Peter Napier
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
Atacama Large Millimeter Array
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Terry Cotter LO/IF Group Leader
EVLA Computing Reorganization
EVLA Advisory Committee Meeting System Status
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Gustaaf van Moorsel September 9, 2003
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA Operations Jim Ulvestad
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel

P.NapierEVLA Advisory Committee, 10 June, Project Scope Phase I (funded) Continuous frequency coverage 1-50 GHz in 8 rx bands 16 GHz IF bandwidth per antenna (8 GHz/polarization) with new local oscillator system Fiber optic communication link for digital IF transmission, LO reference distribution and monitor/control New correlator (from Canada) to process this bandwidth with good spectral resolution New Monitor and Control system New End-to-end data management software

P.NapierEVLA Advisory Committee, 10 June, Project Scope (cont) Phase II (funding not yet requested) New Mexico array – approx. 8 new antenna stations on baselines up to 300 km Enhanced low frequency capability MHz E Array – most compact VLA array possible

P.NapierEVLA Advisory Committee, 10 June, Project Organization EVLA Work Breakdown Structure (WBS) 6.01 Project Management (P.Napier) 6.02 System Integration and Testing (J.Jackson, G.Hunt) 6.03 Civil Construction(G.Stanzione) 6.04 Antennas (J.Ruff) 6.05 Front End Systems (P.Lillie) 6.06 Local Oscillator System (T.Cotter) 6.07 Fiber Optic System (S.Durand) 6.08 Intermediate Frequency System (T.Cotter) 6.09 Correlator(P.Dewdney, Canada) 6.10 Monitor & Control System(W.Sahr) 6.11 Data Management and Computing(T.Cornwell) 6.12 Education and Public Outreach(R. Harrison) WBS is maintained at Level 4, Updated Quarterly. Weekly Progress Meetings

EVLA MANAGEMENT CHART EVLA Project Scientist EVLA Sys Engineer, Electronics EVLA Sys Engineer, Software EVLA Budget/ Schedule Asst Director Socorro Operations Contracts EVLA Project Manager Data Mngmnt Group Canadian Partner NRAO CDL Mexican Partner Electronics Engineering Services Computing Scientific Staff Business Socorro Divisions P. Napier J. JacksonG. Hunt (B.Clark) E. Cole Correlator P. Dewdney C. Janes G. van Moorsel F.E. - P. Lilie LO/IF - T. Cotter FO - S. Durand M/C - B. Sahr e2e T. Cornwell J. Ulvestad R. Perley G. Taylor S. Lagoyda L. SernaCiv. - G. Stanzione Ant. - J. Ruff LNAs J.Webber L. Rodriguez

Front End IF Front End IF Digitizer Fiber Transmission Waveguide Transmission Baseband Digitizer Old Correlator New Correlator D/ADigital filter Old Systems New Systems Old M/C System New M/C System EVLA Transition Hardware LO

P.NapierEVLA Advisory Committee, 10 June, EVLA Schedule (Calendar years) Start installation of fiber optics cables on YQ Prototype EVLA system lab integration and testQ Install prototype EVLA system on EVLA Test Antenna Q Subsystem CDRsQ Start EVLA electronics production Q Start retrofitting 7 antennas/year with new system Q Start observing in “transition” modeQ Test of prototype correlator on 3 or 4 antennasQ Start outfitting new correlator room Q Start tests of first correlator subset at VLA Q First “shared-risk” science with new correlator subset Q Last antenna retrofitted to EVLA design Q New correlator declared “operational” Q Last EVLA receiver installed Q1 2010

P.NapierEVLA Advisory Committee, 10 June, Funding Sources ($M 2001) New NSF Funds51.5 NRAO Operations (personnel)12.0 Canadian Correlator12.0 Mexican Contribution 2.0 Total 77.5

P.NapierEVLA Advisory Committee, 10 June, NSF Budget (Fiscal years, Current year $)

P.NapierEVLA Advisory Committee, 10 June,