PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Cryomodule Concepts & Cryogenics J.D. Fuerst SPX Technical Study Group Meeting 27-29JUL10.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Construction and Installation of the CLIC Experimental Area
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
August 2012SiD DBD SLAC1 SiD DBD Costs M. Breidenbach.
3 March 2009M. Breidenbach1 SiD LoI Costs M. Breidenbach.
SID Engineering Marco Oriunno (SLAC), Jan CLIC Workshop, CERN Toward the TDR.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
M.Oriunno, SLAC ALCPG September ‘09 ILD 1 Progress on Push-Pull IR Studies Marco Oriunno, SLAC A.Herve (ETH-Zurich), K.Simran (DESY) A.Seryi, T.Marckiewicz,
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
1 GLD and GLDc Sep. 12, 2007 Y. Sugimoto KEK. 2 Compact GLD Option Motivation –GLD and LDC will write a common LoI –The detector design should have common.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
Detector design optimization for push-pull IR and for surface assembly and corresponding IR requirements Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
SiD IR & MDI Status & Comments Tom Markiewicz/SLAC ALCPG, Fermilab 26 October 2007.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
10/3/05 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer Roger Rabehl Fermilab.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
SUPERB site status report for layout v12
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Americas KlyCluster Cost Analysis Overview
BDS Cryogenic System RDR Status and EDR Plans
Detector Service Cavern for ILC
SiD LoI Costs M. Breidenbach 29 July 2010 M. Breidenbach.
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Tom Lackowski Revised 10/12/2011
Extract from today’s talk given to DCB
ILC Experimental Hall Cryogenics An Overview
ILC Cryogenics -- Technical Design Report Planning
A 12-min Introduction to The ILC Machine Detector Interface and SiD
ILC - Global Design Effort
Presentation transcript:

PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter H. Garbincius Fermilab CFS – Area System Workshop Daresbury – July 12-13, 2010

long existing info from RDR & LOIs I have not seen more recent updates from ILD or SiD please tell me if I’m missing something important RDR estimates - I have spreadsheets from GLD, LDC, SiD, but not 4 th RDR estimates were incomplete, had obvious holes… All assumed power and cooling would be available, specs SiD: 350 kW All included cost of LHe refrigeration plant and system for SC Magnets Nothing assumed for MDI, except SiD included beam pipe systems No platforms or motion devices included, except SiD had $ 1 M Detector Translation Sys & $ 0.25 M Detector Alignment Sys. No Pacmen or other shielding, mumblings about self-shielding CFS had ZERO Power and ZERO Cooling in their RDR estimate for IR LOI estimates – I do not have similar spreadsheets for ILD or SiD visually seeing these details shows whether something is missing between the intersections of CFS/MDI/Detectors both concentrate on parametric model of cost vs. size, weight, etc. PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 2

from Letters of Intent (LOIs) ILD – LOI text mentions requirements of beam pipe, and “detector services”: power, transformers, LHe compressor and storage plant on surface, but doesn’t indicate where these are costed. Includes a CMS-like surface assembly and lowering of largest 3,500 t piece via temporary portal crane Estimate for push-pull platform is included under “integration”, but all integration totals 1.7 M ILCU SiD – estimates in 2008 US $ push-pull motion on rails grouted & locked to floor push-pull interchange time ~ 1 day! Is “self-shielding” but needs Pacmen PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 3

SiD assumes the following are provided, i.e. not in SiD estimate: IR Hall with finished surfaces, lighting, & HVAC Surface buildings, gantry cranes, hall cranes 480 VAC power, LCW, compressed air, internet External He compressor system, other LHe = SiD Data storage system and offline computing, QD0s and their cryogenic systems SiD estimate includes costs for: LHe refrigeration sys – other than compressors Detector motion rails for push-pull and opening in both beam and garage are installed by SiD Beampipe PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 4

questions or comments? Each detector assumes QD0s are attached to detectors and move with them. This means we need 4 QD0s (we do have 4 in RDR estimate). Displaying this lack of specifications, exchanged information, and estimate details should galvanize CFS – MDI – ILD/SiD common ACTION! PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 5