ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
IPBSM status and plan ATF project meeting M.Oroku.
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
Supports and Movers for ATF2 Magnets R. Sugahara KEK France and Japan Collaboration Meeting Feb , 2006.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
1 LAPP in ATF2 Extraced from ANR bid A.Jeremie. 2 LAPP in ATF2 Current activities related to accelerators: The LAPP-Annecy team is currently developing.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
BPM support and beam pipe length FD support status A.Jeremie.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Meeting December Andrea JEREMIE1 France/ATF2 kick-off meeting in Annecy October participants from 3 regions! LAPP/Annecy in.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Summary FD Support System
Vibration issues at Linear Colliders:
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Active isolation Target : a low cost dedicated table
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
A.Jeremie Some drawings from different CLIC’08 presentations
A.Jeremie, B.Bolzon, N.Geffroy
FD supports A.Jeremie.
IP configuration session
Presentation transcript:

ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC and KNU

A.Jeremie CLIC'082 Outline FD support specifications Initial active support study Rigid support on intermediate feet Final rigid support Measurements with water flow Installation photos Conclusion

A.Jeremie CLIC'083 Shintake Monitor: information on the beam size ATF2 Layout Final doublets

A.Jeremie CLIC'084 FD layout SBPM QC3 SBPM FFTB 2.13 S3.00 SF1QF SBPM QC3 SBPM FFTB 2.13 S3.00 SD0QD IP 1940 mm 1225 What is needed to support all these components?

A.Jeremie CLIC'085 For QD0 at ATF2: 6-7nm tolerance Two solutions possible: 1.Isolate/cut vibrations in the desired frequency range 2.Push the first resonance peaks at higher frequencies where ground motion is lower 0.1Hz ~50Hz Repetition rate 1Hz=> need a “mechanical” stabilisation from 0.1Hz (below, the beam based alignment works) 6-7nm ATF2 specifications ATF ground motion

A.Jeremie CLIC'086 FD support specifications Desired frequency range : 0.1Hz-50Hz Support that can evolve as Final Focus design evolves (should be able to change support) 6-7nm jitter tolerance 1.2m beam height Honeycomb table Isolator: Passive => turned OFF Active => turned ON Initial suggestion: CERN wanted to contribute by sending the commercial TMC table

A.Jeremie CLIC'087 Vibrations of the passive TMC table Vertical direction: Integrated RMS Above 0.5Hz: Amplification Above 30Hz: damping begins Below 0.5Hz: No amplification or damping on the table 27 Amplification 0.5 ~Same response Amplification Damping 30

A.Jeremie CLIC'088 Vibrations of the active TMC table Above 0.8Hz: Damping on the table  Factor 7 of damping above 1.5Hz Vertical direction: integrated RMS Below 0.8Hz: Amplification on the table

A.Jeremie CLIC'089 Ground Shintake monitor Final doublets Beam Interference fringes We want the measurement to have a coherent behaviour with respect to the “beam” => Relative motion between Shintake monitor and final doublets: 6-7nm in the vertical axis above 0.1Hz 4m Good ground motion coherence: measured on KEK site  Separate stiff supports rigidly fixed to the floor Specifications Study the honeycomb block but without feet If Shintake Monitor and FD on separate active supports, coherence is lost

A.Jeremie CLIC'0810  Without any masses: 56.2Hz  Lower than in free configuration!  With masses: 26.2Hz  Fall of the eigenfrequency Boundary conditions: table put on / fixed to 4 rigid supports at its corners “simple” Simulation: just a block with the right boundary conditions => to see the evolution First resonance peak in free-free configuration: 230Hz Too low! velocity sensors Microphones accelerometers Table without any masses Table with masses simulating the weight of FD

A.Jeremie CLIC'0811 Transfer functions of the table with its feet First resonance (phase: 90°) No masses: 74Hz With masses: 46Hz Higher displacements because increase of ground motion with decrease of frequency  Impact of the different vibration peaks on relative motion

A.Jeremie CLIC'0812 Integrated RMS of relative motion between table and floor to predict on the ATF site Calculation performed for these specific needs: Calculation to perform by integrating the vibratory behaviour of the table measured at LAPP and the data of ATF ground motion Relative motion between table and floor

A.Jeremie CLIC'0813 Total relative motion ([0.17; 100]Hz): 6.7nm  Above tolerances (6nm)! Contribution of the peak alone: [30; 100]Hz: 4.6nm Integrated RMS of relative motion at ATF 6.7nm  Need to push resonances to higher frequencies where ground motion is lower Relative motion between table and floor 4.6nm

A.Jeremie CLIC'0814 Is the honeycomb table rigid enough? Impact hammer on table Modal deformations  for each resonance (up to 150Hz)  In the three axis Modes1) T-X2) T-Y3) R-Z4) T-Z5) R-Y6) R-X Frequency (Hz) Damping (%) first modes: rigid body modes in 6 degrees of freedom 2 tri-axis accelerometers Michael GUINCHARD (CERN) Z X Y T: Translation R: Rotation  Fix table on whole surface to remove these modes Table fixed on 4 rigid supports at the 4 corners The table is a rigid body, but the feet are not

A.Jeremie CLIC'0815  Without any masses: 526.1Hz  Even higher than in free configuration!  With masses: 135.2Hz  Fall of the eigenfrequency but still high Table fixed directly to the floor on 1 entire side Choice of the ATF2 collaboration: Get the same table to send it to Japan and fix it to the floor Bees wax: good vibration transmission, can be unglued, stable in time, rad hard Honeycomb table 3 steel plates bolted to the floor Bees wax Set-up can be moved in the future simulation

A.Jeremie CLIC'0816 IP QD0 SF1 QF1 SD0 beeswax Room for slings for table lifting FD configuration Quads, sextupoles and movers :SLAC (from FFTB) From floor to mover: LAPP (new) BPM+support: KNU, LAPP 2.4m Adjustment possible in x, y, z with shims (0.05mm) and adjustment pushers for 1.2m beam height

A.Jeremie CLIC'0817 Table fixed on one entire face to the floor Experimental set-up 3 steel plates bolted to the floor Honeycomb table Bees wax  Good boundary conditions chosen for the table: Relative motion should be very low compared to tolerances No masses: no peak With masses: 92Hz

A.Jeremie CLIC'0818 Impact of the resonance peak on the RMS ObjectPeak positionIntegrated RMS 4-feet table with weight 46Hz4.6nm Glued table with weight 92Hz0.3nm Sextupole on mover/support 100Hz0.26nm Quad on mover/support 76Hz1.1nm Adding up the integrated rms values keeps us under the 6- 7nm tolerances The honeycomb table fixed to the floor on whole surface, with adjusted movers validated for ATF2 Final Doublet support

A.Jeremie CLIC'0819 Effect of flowing water in FD magnets Study done at LAPP at the end of July 08 Effect of cooling water on the vibrations of final doublets

A.Jeremie CLIC'0820  No significant increase of vibrations with cooling water flowing=>impact of peak on integrated rms : 1.1nm 3D frequency analysis Quadrupole (QD0) with water flow GURALP sensors (0.2Hz – 50Hz)ENDEVCO sensors (10Hz – 100Hz) Measurement in time Start flowing water

A.Jeremie CLIC'0821 Sextupole (SD0) with water flow GURALP sensors (0.2Hz – 50Hz)ENDEVCO sensors (10Hz – 100Hz)  Some increase at higher frequency=> impact of peak on integrated rms: 0.7nm=>not significant Measurement in time 3D frequency analysis Start flowing water 80Hz Water flow in magnets has no significant effect on vibrations

A.Jeremie CLIC'0822 Installation at KEK from September 16 to September

A.Jeremie CLIC'0823 Unpacking Installing beeswax on plates bolted to the ground Table comes down Installing “feet” and movers Shintake monitor Bending magnet Beam dump

A.Jeremie CLIC'0824 QD0 installed QD0 comes down Everything installed, centered and aligned in x, y and z, Thursday September ; Next step: BPM installation

A.Jeremie CLIC'0825 S-BPM installation October 15, 2008

A.Jeremie CLIC'0826 ATF2 rigid Final Doublet support chosen (vs. active support) SLAC FFTB movers adjusted to meet beam height Vibration measurements validate the rigid support choice Water flow in magnets has no significant effect on vibrations ATF2 Final Doublet support installed at KEK Conclusion Impatiently waiting for the beam to start!