Sec. XIII. Appeal Procedures Eliminating Dual Appeal Opportunities.

Slides:



Advertisements
Similar presentations
Travel Management Rule: Southwestern Region Implementation Travel Management: Designated Routes and Areas for Motor Vehicle Use ALL Trails Users Affected.
Advertisements

Doc.: IEEE /XXXr0 Submission March, 2003 Matthew Sherman, AT&T Labs & Stuart J. Kerry, Philips Slide 1 SEC Motion For the Chair of IEEE 802 LMSC.
1 Current Issues in NEPA Lessons Learned in Appeals and Litigation Jackie Andrew R6 Assistant Director RPM Lessons Learned in Appeals and Litigation Jackie.
Onshore Oil & Gas Order #1 BLM/Forest Service Final Rule.
Bonds. Onshore Order 1 1.A Complete Form Well Plat 3. Drilling Plan 4. Surface Use Plan of Operations 5. Bonding 6. Operator Certification 7.
1 | US DOE Geothermal Programeere.energy.gov Public Service of Colorado Ponnequin Wind Farm Geothermal Technologies Program Categorical Exclusions Doug.
Oil and Gas for Managers ( ) Pete Culp Assistant Director Minerals, Realty & Resource Protection May 1999.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
Hazard Mitigation Assistance and the Mineral Rights Policy Gene Gruber FEMA Region III Director, Mitigation Division.
BLM Bureau of Land Management Oil and Gas Permitting Process Expediting Oil and Gas Development in Western States Kent Hoffman.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
BLM New Mexico Texas Oklahoma Kansas Master Development Plan Carlsbad Field Office Natural Resource Specialist Team September 23, 2014.
Significant Cave Designation Process James R. Goodbar Senior Cave/Karst Specialist Bureau of Land Management May 12-16, 2014 Cody, Wyoming.
1 Oil and Gas for Managers American Indian Issues.
The Cooperative Forestry Assistance Act authorizes the USDA Forest Service to protect trees and forests from insects and diseases. This is accomplished.
The Adjudication Process Virginia Department of Health Professions New Board Member Training October 2008.
1 Directive Management USDA FOREST SERVICE Pacific Southwest R5 Vallejo California.
Bureau of Land Management Regulations Washington State Association of Counties Cooperating Agency & Coordination Training November 22, 2013 – Vancouver,
Well Plats. Onshore Order 1 1. A Complete Form Well Plat 3. Drilling Plan 4. Surface Use Plan of Operations 5. Bonding 6. Operator Certification.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
NEPA (National Environmental Policy Act) When does it apply? How can I help? CEQA helping NEPA?
Reclamation. Goal  Plans for Reclamation  New Requirements.
p The Federal Leadership Forum A Case Study NEPA Oil & Gas EPA NPS Cumulative Effects FS Unsatisfactory EIS UT EA MT BIA EXPLORE CO Air Quality Energy.
Variations and Timelines in the Federal Appeals Process Robert Mathes, Bjork Lindley Little PC.
Section V. Rights-of-Way and Special Use Authorizations BLM and Forest Service.
Environmental Assessment August 2012 Oil & Gas Lease Sale.
Office of Natural Resources Revenue U.S. Department of the Interior Industry ComplianceAccurate Revenues & DataProfessionalism & Integrity Federal and.
TIM CHARTERS STAFF DIRECTOR U.S. HOUSE COMMITTEE ON NATURAL RESOURCES SUBCOMMITTEE ON ENERGY AND MINERAL RESOURCES “ WHY BUILDING A SOLAR PROJECT ON FEDERAL.
Draft RMP/EIS. Objectives Write a draft land use plan and EIS. Issue a draft land use plan and EIS for public review.
Master Development Plans (MDPs) Oil and Gas Projects.
Solid Leasable Permitting and Leasing Process Roles and Responsibilities of the U.S. Forest Service.
Managing Natural Gas & Oil Resources on Federal Lands on Federal Lands Colorado Bureau of Land Management.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Legal Framework for BLM Planning. Objective Describe the major laws and regulations that guide and influence planning at BLM.
Federal Lease Overview NHAPL Half-Day Seminar February 5, 2015.
BLM 2008 NFMC EPA of Section 365 Permit Streamlining Pilot Update James Gazewood BLM Wyoming State Office.
Wyoming Pipeline Authority September Meeting, Jackson Hole Ted Murphy – Acting Field Manager – Rock Springs Field Office.
Manual Direction Cave & Karst Resources Management James Goodbar Senior Cave /Karst Specialist Bureau of Land Management May 12-16, 2014 Cody, Wyoming.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
RENEWABLE ENERGY AND PUBLIC LANDS. WIND ENERGY IS A ROW ACTION WIND ENERGY ALL REGULATIONS RELATED TO FLPMA, NEPA, ESA, MIGRATORY BIRD TREATY ACT, ANTIQUITIES.
Recent PSD Experiences in SWRO Regulatory & Statutory Requirements Relationship with EPA Federal Land Managers - FLAG Appeals.
MMS: Securing Ocean Energy & Economic Value for America Gulf Coast Environmental Affairs Group January 14, 2010 Galveston, Texas Civil Penalty Program.
Surface Mining Control and Reclamation Act of 1977 By: Alex Rembolt Period 3 This was approved on August 3, It was amended in 1978, 1980, 1981, 1982,
TTI Regulatory and Permitting Issues For Geologic and Terrestrial Sequestration of CO2 Presentation to the West Coast Regional Carbon Sequestration Partnership.
Planning for Travel and Transportation Management
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
Miles City Field Office (Montana) 2.7 million surface acres million acres of subsurface mineral estate. North Dakota Field Office 58,000 acres.
Planning for Travel and Transportation Management National Training Center Course # Unit Three Land Use Planning Decisions.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Highlights of the “Procedural Guidance” Results of transportation planning process “inform” the NEPA process. Format of planning products for inclusion.
Communications Site Program Bureau of Land Management (BLM) & Forest Service (FS) Robert Wilson BLM, Washington Office National Project Manager for Communication.
Endangered Species Act (Section 7) Consultation In Federal Land Management Agencies American Chemical Society National Meeting Boston, Mass. August 2015.
Forest Planning and IRWMPs in the Sierra Nevada Sue Britting June 11, 2013.
Administrative Code Amendment
STATE OF ALASKA PERMITTING PROCESS
Planning Commission Public Hearing September 9, 2016
City of Patterson Urban Forest Tree Planting Policy
New Frontiers in Rights-of-Way
Supplemental Environmental Impact Statement and
Environmental Impact Reviews In Oil & Gas Operations
BLM Priorities in 2018 Brian C. Amme, Deputy State Director, Minerals
Elements in Eliminated Jacobian = 133,515
Elements in Eliminated Jacobian = 133,515
EQUAL EMPLOYMENT OPPORTUNITY Federal Sector COMPLAINT ROCESSING
American Indian Rights and Claims Course Sequence Flowchart
IS YOUR LOCAL GOVERNMENT PREPARED
Board of County Commissioners
Presentation transcript:

Sec. XIII. Appeal Procedures Eliminating Dual Appeal Opportunities

Operational Appeals on NFS Lands (Pre-Order 1) NEPA analyses for the Surface Use Plan of Operations could be: NEPA analyses for the Surface Use Plan of Operations could be: –Appealed to the Forest Service (36 CFR 215); –Subject to BLM State Director Review; –Appealed to the Interior Board of Land Appeals (IBLA) ( 43 CFR part 4). ( 43 CFR part 4).

Operational Appeals on NFS Lands (Pre-Order 1) Conditions of Approval could be Conditions of Approval could be –Appealed by the operator to the FS (36 CFR 251); –Subject to BLM State Director Review; –Appealed to the IBLA (43 CFR part 4).

Clarification Made in Order #1 Sec. XIII states: “Incorporation of a FS approved Surface Use Plan of Operations into an approved APD or a Master Development Plan is not subject to protest to the BLM or appeal to the Interior Board of Land Appeals.”

Current Appeal Opportunities on NFS Lands Appeals of FS decisions relative to surface disturbance on NFS lands can only be appealed to the FS. Appeals of FS decisions relative to surface disturbance on NFS lands can only be appealed to the FS. BLM decisions related to the drilling plan may go through BLM State Director Review and then appealed to the Interior Board of Land Appeals. BLM decisions related to the drilling plan may go through BLM State Director Review and then appealed to the Interior Board of Land Appeals.

Appeal Opportunities on Non-FS Lands BLM decisions are subject to State Director Review (43 CFR §3165). BLM decisions are subject to State Director Review (43 CFR §3165). Decisions from State Director Review can be appealed to IBLA (43 CFR §4). Decisions from State Director Review can be appealed to IBLA (43 CFR §4). Operator may appeal BIA decisions (25 CFR §2). Operator may appeal BIA decisions (25 CFR §2).

Conclusion Onshore Order 1 makes it clear that Forest Service decisions on Surface Use Plans of Operation can only be appealed to the Forest Service. Onshore Order 1 makes it clear that Forest Service decisions on Surface Use Plans of Operation can only be appealed to the Forest Service.