Federal Emergency Management Agency Documentation Preparation.

Slides:



Advertisements
Similar presentations
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
Advertisements

The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures HBA – Chapter 6.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
1. 2 Preliminary Damage Assessments (PDAs) qualify you (or NOT) for FEMA Public Assistance (PA).
Draft 2010 Applicant Briefing Presented by: State PAC Florida Division of Emergency Management DR XXX The Disaster Name.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Sandy Recovery Improvement Act (SRIA) of 2013 Sandy Recovery Improvement Act (SRIA) of 2013 Public Assistance Program Alternate Procedures Pilot Program.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
1 October 2004 Flood FEMA-1575-DR-HI October 2004 Flood FEMA-1575-DR-HI Applicants’ Briefing.
Federal Emergency Management Agency Public Assistance Grant Program.
FEMA Public Assistance Program Applicants Briefing FEMA-4062-DR-HI March 3-11,
Connecticut Applicants’ Briefing DR-SAMPLE ###-CT Declared Date #### Incident Period DATE ####
Connecticut Applicants’ Briefing DR-4213-CT Declared April 8, 2015 Incident Period January 2015.
Floodplain Management Regulations and the Florida Building Code
Public Disaster Assistance Grant Program Briefing.
Unit 1 Community Capabilities
“Show Me The Money” The Audit Process. Learning Objectives Explain the purpose and importance of audit evidence. Describe the types evidence. Ensure that.
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
Increased Cost of Compliance The Basics (Last updated July 25, 2006)
What is a BCA?  A tool used to prove to FEMA that the benefits of a project outweigh the costs.  A Benefit Cost Ratio (BCR) of 1.0 or higher is required.
Public Disaster Assistance Grant Program Briefing Severe Storms June 23-30, 2015 June 23-30, 2015.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
A Virginia Mitigation Success Story Central Shenandoah Planning District Commission Bonnie Riedesel Jason DeBord, CFM Rebecca Joyce Virginia Hazard Mitigation.
Mitigation Focus-Public Assistance Briefing for Hurricane Sandy
Creating Value … … Delivering Solutions Rapid Development of a Flood Acquisition Project Decisions and Opportunities.
ASFPM 2011 FEMA’s National Flood Mitigation Data Collection Tool (NT) Errol Garren May 19, 2011 H-4A 4:
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
FEMA-1044 The 1995 January Storm By: Dave Rickard.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
Module 20 STEP 10 Division Engineer’s Transmittal Letter
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Governor’s Office of Homeland Security & Emergency Preparedness.
PLANNING FOR SUPPRESSION REPAIR How to estimate the amount of Suppression Repair work and design your strategy to complete it.
PUBLIC ASSISTANCE APPLICANT BRIEFING FEMA DISASTER DR-1997.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
Session 8Slide 8-1 The Mitigation Plan Session 8 Slide Deck.
National Archives and Records Administration, Preparing for the Unexpected ESSENTIAL ELEMENTS: ANALYSIS.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Hazard Mitigation Funding Programs. Current Florida Mitigation Programs 1.Hazard Mitigation Grant Program* (HMGP) Hazard Mitigation 3.Pre-Disaster.
State Financial Resiliency for Disaster Preparedness “TEAM EMT” Matthew Baker, Mike Kahle, Brandon Key, Kelly McCoy, Adriana Valenciano Trachtenberg School.
Page 1 Recording of this session via any media type is strictly prohibited. Page 1 FEMA Claims – For Non- Profit Entities Recovering from FEMA after a.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
Evaluating Project Alternatives Topics Feasibility Studies Alternatives Studies Reading Assignment Textbook – Appendix C.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
FEMA and Historic Preservation Amanda E. Ciampolillo, Regional Environmental Officer FEMA and Cultural Resources in Disasters.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
MW-AT E Addressing the Challenges of Recovery & Rebuilding from Hurricanes Katrina & Rita Rebuild Louisiana Housing Programs February 20,
Arkansas Department of Emergency Management Arkansas’ Homeland Security & Preparedness Agency Sandy Recovery Improvement Act of 2013 Public Assistance.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
Waterway Permits Categorical Exclusion Training Class.
All-Hazard Mitigation Plan Update Susquehanna County Kick-Off Meeting April 28, 2016.
Quality and the FEMA Disaster Recovery Program FEMA Public Assistance Grants Margery Cox April 25, 2016.
US Army Corps of Engineers BUILDING STRONG ® Huntington District Floodplain Management Services Dan Bailey, CFM Huntington District August 2012.
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
Waste Confidence/Continued Storage – Status Update
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Revisions to Codes and Standards
Overview What is the CEQA environmental review process?
Tom’s Creek Foot-Bridge
Role of FEMA EHP During Response Activities
Introduction SCEA Organization Scoping Analysis Conclusions Mitigation.
Relationship between World Bank and Romanian EA requirements
Environmental Commitments
Presentation transcript:

Federal Emergency Management Agency Documentation Preparation

Federal Emergency Management Agency 406 HMP Documentation Preparation Hazard mitigation proposal Case Management File Project Worksheet NEMIS review

Federal Emergency Management Agency Slide 6- 3 PAC/PO/Specialist Responsibilities Discuss with the applicant hazard mitigation program Discuss with the applicant hazard mitigation program Help them identify: Help them identify:  Projects  Scope of work  Costs  Special Considerations Identify need to request additional technical expertise Identify need to request additional technical expertise

Federal Emergency Management Agency Slide 6- 4 Case Management File (CMF) Document how the mitigation measures were identified. Document how the mitigation measures were identified. Document alternative options that were considered Document alternative options that were considered List all individuals and agencies involved in the decision making process. List all individuals and agencies involved in the decision making process. List other pertinent information. List other pertinent information.

Federal Emergency Management Agency Slide 6- 5 Project Worksheet In scope of work note if: In scope of work note if:  Hazard Mitigation Proposal attached  Codes and standards provides mitigation  Repair/construction practices provides mitigation  Mitigation considered but not technically feasible

Federal Emergency Management Agency Slide 6- 6 Project Worksheet Preparation Attach HMP Attach HMP Check Mitigation under Special Considerations Check Mitigation under Special Considerations Review proposal for environmental and historical issues Review proposal for environmental and historical issues Review final product with applicant and state Review final product with applicant and state

Federal Emergency Management Agency Slide 6- 7 Hazard Mitigation Proposal (HMP) Scope of work Scope of work  Damage description  Sketches/pictures  Repair to pre-disaster condition  Mitigation measure  Method used to determine cost-effectiveness Estimate of work Estimate of work  Materials/Description  Costs  Materials not needed in PW estimate if HMP is approved Approvals – Special Consideration Issues Approvals – Special Consideration Issues

Federal Emergency Management Agency Slide 6- 8 HMP Worksheet Preparation

Federal Emergency Management Agency Slide 6- 9 SCOPE OF WORK This building sits in the 100 year floodplain in the floodway. It has sustained repeated flooding in the past. Replace 595 SQ FT of damaged sheetrock with 595 SQ FT of waterproof wall paneling that can be easily removed if the building is flooded. Replace the particleboard vanity with a ceramic pedestal sink. This HMP qualifies as “wet flood proofing” as listed in FEMA Policy Appendix A

Federal Emergency Management Agency Slide ESTIMATE OF WORK

Federal Emergency Management Agency Slide SIGNATURE SECTION

Federal Emergency Management Agency Slide NEMIS – Scope of Work/Cost

Federal Emergency Management Agency Slide NEMIS – Mitigation Activity Tab