Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.

Slides:



Advertisements
Similar presentations
InfoWorks CS Enables Design of Hybrid Pressure/Gravity Sewer Systems
Advertisements

Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
Design of W.W. Collection System
PUMPING SYSTEMS BASICS
1 CE 548 Analysis and Selection of Wastewater Flowrates and Constituent Loading.
City of Los Angeles Venice Dual Force Main Project
Bringing Hyundai to Montgomery MWWSSB’s Role as Part of the Economic Development Team Presented by: Thomas R. “Buddy” Morgan, General Manager Alabama Water.
Fluid Mechanics 07.
Wastewater Storage Pond Design
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Wastewater Treatment & Collection System Improvements.
Approved Due Diligence Scope Property Survey Topographic Survey Geotechnical Exploration Streams and Wetlands Threatened & Endangered Species Cultural.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
L.R. Chevalier, Ph.D., P.E., D-WRE, BCEE, F-ASCE Curriculum for Sustainability at Southern Illinois University Carbondale Based on Chevalier, L.R., 2010,
1 Stormwater and Wastewater in Halifax Regional Municipality Presentation to Halifax Watershed Advisory Board John Sheppard, P.Eng. Manager of Environmental.
EE535: Renewable Energy: Systems, Technology & Economics
BLM National Training Center HYDRAULIC DESIGN PART 2.
Wastewater generation
Hydraulic Cylinder Performance Estimator Donald M. Johnson AGME 2903 Fall 2000.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
1 CTC 450 Pumps Pumps
EPANET FOR PRESSURIZED PIPE SYSTEMS
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
POWER SAVING BY ROCKSOLID INDUSTRIAL SOLUTIONS SYSTEMS REQUIRING PUMPS USING VALVE CONTROL SYSTEMS REQUIRING FANS USING DAMPER CONTROL SAVE GOOD $MONEY$
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
Wastewater Management
HONR 297 Environmental Models
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Pumps and Lift Stations. Background Fluid Moving Equipment Fluids are moved through flow systems using pumps, fans, blowers, and compressors. Such devices.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Inputs/Givens 1.Volume of Ice (3.5 gal) 2.Density of Ice (736 kg/m 3 ) 3.Latent Heat of Ice, h sf (333.6 KJ/kg) 4.Melt time of 1 hour (3600 s) Constraints.
Project History Town of Newport Population: 550 Vermillion County Seat.
© Irrigation Association Effect of Irrigation. © Irrigation Association Calculate Hydraulic Requirements Chapter 4:
SANITARY ENGINEERING 1 COURSE OUTLINE
6.7 WASTEWATER QUANTITY Wastewater quantity varies hourly, daily and weekly. Peak flow occurs at maximum flow for the day.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
Groundwater pumping to remediate groundwater pollution March 5, 2002.
Multi-Jurisdictional-Use Facilities Capital Cost Allocation Study Update Presented to Blue Plains Regional Committee December 20, 2010 District of Columbia.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
CE 3372 Water Systems Design Lecture 005: Engineering Drawings.
The Natural Hydrologic Cycle and The Synthetic Hydrologic Cycle What goes around, comes around.
Josiah Dobson Brett Nicholson Travis Befus Team 11.
Solving Significant Surge and Water Hammer in a Large Wastewater Lift Station at Fort Bragg, North Carolina November 16, 2015 Randall L. Foulke, PE, BCEE,
CE 3372 Water Systems Design
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
Introduction to Overhead/Sprinkler Irrigation Design
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
25 – Wastewater Conveyance System Design April, 23, 2013 Professor Doran CEE 410.
Sanitary Engineering Lecture 4
16 – Measurement of Flows in Piping Systems 1 March 14, 2013 Professor Doran CEE 410.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Irrigation Systems and Components. Overview Types Layout Components Hydraulics Design Considerations.
1. 1. What is a low pressure sewer system? These Systems convey wastewater from your home or business to the regional wastewater treatment facility. Unlike.
26 – Wastewater Conveyance System Design 2
Components Pumps.
Separating Inflow Reduction and Infiltration Removal
Sanitary Engineering Lecture 2
Introduction to Overhead/Sprinkler Irrigation Design
Evaluating Aquifer Storage and Recovery
Pumps and Lift Stations
Week 2: Water Conveyance
Town of Dunn Sanitary District No. 3
Colchester Interceptor System Improvements Project
Completion Report Summary
8.5 The Combined Gas Law Under water, the pressure on a diver is greater than the atmospheric pressure. The combined gas law comes from the pressure–volume–temperature.
Presentation transcript:

Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT

Site Location

Project Background Private development client Development includes two large retail buildings, service station, bank, and general commercial No gravity sewer service in area

Project Background

Unique Design Considerations Donation of project to Beaufort Jasper Water and Sewer Authority (BJWSA) Little topographical variability on site Deep wetwell Site pump station will pump into 16” combined regional force main Unknown conditions in regional force main

Design Solution: Data Collection BJWSA Standards Force main record drawings Force main operating conditions Operating pressure Flow

Design Solutions: Calculations Wastewater Flow Estimate Site Storage Volume Force Main Operating Conditions Choosing Pumps

Design Solutions: Calculations Wastewater flow from site: Peaking Factor=4 Q peak =92.4 BJWSA storage volume requirement: Storage volume in site MH and pipes > 24 hour volume from site

Pump Selection Existing force main conditions analyzed Regional Force Main Pump station on 1,000 70’ TDH Regional Force Main Pump Station CP-67 off No flow in regional force main Two C factors analyzed for each system curve

System Curve-Pumps On Design Point:310 gpm at 102’ TDH Hazen-Williams C Factors: C 1 =110 C 2 =130

System Curves-Pumps Off Design Point:410 gpm at 96’ TDH Hazen-Williams C Factors: C 1 =110 C 2 =130

Pump Selection

Other Calculations Cycle time Buoyancy Calculations High groundwater table Deep wetwell, approximately 24 feet deep

Final Pump Station Layout

Project Status BJWSA Approval Construction Status

Questions?

Lessons Learned